Sheet 2 (8)
CONTENTS
1. GENERAL 3
1.1 Scope and field of application 3
1.2 References 3
A
1.3 Abbreviations 3
2. DEFINITION 4
3. GENERAL CRITERIA 5
3.1 Diagram content 5
3.2
3.3
ANNEXES:
ZZ
Material and Heat Balance content
Graphical layout of drawings
gs
s
ent 6
7
II MATERIAL
AL AND HEAT BALANCE EXAMPLE
III PROCESS
SS FLOW DIAGRAM SYMBOLS
ROCESS
BO
IV
V ISSUE OF
F MATERIAL AND HEAT BALANCE
BALANC
BALA SPECIFICATIONS
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 3 (8)
1. GENERAL
A
secondary systems.
None of the auxiliary services’ balances, for the entire
ntire complex, are included in ththe
category of PFDs considered in this design criteria
a document.
1.2 References
OPR.GM.XE.5012 Preparation
on and identification
nd id
identification of project specifications a
and
gss
drawings
ZZ
OPR.MO.XE.5011
OPR.MO.XE.5013
PRG.GG.NRM.0001
PRG.GG.SIM.0001
Process
cess engineering for primary oil and chemical systems
ocess
Process flow d
diagrams (PFDs)
Guide to metric (SI) unit of measurement
Graphical symb
(PFDs) and
symbols and id codes s for pro
dia
proc
sys
1.3 ns
s
Abbreviations
FC Flow Controller
LC Level Controller
PC Pressure Controller
BO
TC Temperature Controller
NNF Normally No Flow
PFD Process Flow Diagram
BEDD Design Data
Basic Engineering D
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 4 (8)
2. DEFINITION
The process flow diagram (PFD) is a document that is prepared ed at the process
red
engineering level in the basic engineering development phase.
It is a simplified diagram that indicates the functional connections
ections between the main
items of plant equipment, as well as the location and function
ion of the main
ain control loops.
The plant’s material and heat balance accompanies the PFD.
PFD
A
ZZ
BO
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 5 (8)
3. GENERAL CRITERIA
A
In particular, the PFD must contain all process equipment,pment, excluding motors, with the
associated ID code and a description of the service e provided at the side. For each iteitem
of equipment, the main internals that distinguish h it must also be indicated, such as a the
following, for example: demisters, catalytic beds,
eds
ds,, stack plates, filler sections, separa
separators,
heating coils, fractioning, absorption and stripping
ripping
ipping trays, etc.
The PFD must highlight the main processcess streams that enter and leave the equipment,
equipme
the main flows of the auxiliary services
ces
es that directly or indirectly process
indirectly take part in the proc
proce
ZZ
and/or are generated within the plant
plant’s
e the plan
pla battery limits and
clea
clearly identified in the PFD,
the type of fluid in the streams must be clearly P for both the above
chemicals and d the auxiliary services.
In order to favor immediate investigation of processrocess pproblems, the significant flow
ting loops must be specified with an indication
regulating indication of
in o just the variable controlled (e.g.
FC foror the flow rate, TC for temperature, PC for pre
pres
pressure, or LC for level) and the shut-
ff valves, limited to those cases in which they
off they ar
are essential for determining the correct
operation
ratio of the plant (for ex ample, for deter
example, determ
determining different plant set-ups related to
different
erent running conditions).
BO
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 6 (8)
x temperature
x pressure
x mass flow of liquid
x relative density of liquid at 15°C/4°C
x volume flow of liquid at 15°C
x molecular weight of vapor
A
x vapor flow under normal conditions
the corresponding
c) molar composition
position (kg mol/h) and total
otal molar flow (kg mol/
mol/h)
d) temperature
rature (MkJ/h)
ature (°C), pressure (kPa) and total enthalpy (Mk
(MkJ
e) forr liquid phase:
- mass flow rate (kg/h)
- relative density of liquid at 15°C/4°C
- d density of liquid (kg/m3) at operating tem
temperature and pressure
temp
- viscosity (cP)
BO
- enthalpy
e (MkJ/h)
f) for vapor
vap phase:
- mass flow
f rate (kg/h)
- molecular weight
mpressibility
- compressibility
(kg/ 3) at operating temperature and pressure
(k
- density of vapor (kg/m
- viscosity
visco (cP)
- cp/cv
- entha
enthalpy (Mk
(MkJ/h)
Alternatively,
tively, for plants where specification of the molar composition and total molar flow
is nott signific
significant, the possibility of producing Material and Heat Balance tables indicating
significa
e mass flow
the f composition (kg/h) and associated weight percentage for each stream
shall be evaluated on a per-project basis.
Furth
Furthermore, other data that is not significant (e.g. relative density of liquid at 15°C/4°C)
or not available, might not be specified.
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 7 (8)
The process flow diagram must be prepared using the A3 or elongated ed A4 formats
ted for (see
Annex 1). All letters, numbers, arrows, distances between pipes and
nd special details m
must
comply with procedures PRG.GG.SIM.0001 and OPR.GM.XE.5012. 012.
The PFD must be drawn using lines of two different thicknesses: sses: the thicker
cker one must be
used for representing the main process lines (e.g. charging,arging, products, etc.) and the
A
thinner one for representing the secondary process lines ines and the lines of the auxiliary
services.
Instrumentation lines must be drawn with a thin n dashed line, without distinction forfo the
type of signal required (pneumatic, electric, hydraulic,
ydraulic,
draulic, etc.).
Crossings between two process lines are shown hown by interrupting
upting continuity of the vertical
ver
line, while instrumentation lines must always
ways
ys be interrupted if they cross other lines.
In the case where existing plants ts
s must
mu be modified, all changes regarding the t
ZZ
equipment, piping and instrumentation
process flow
that used for the
description
cription of the service to which it iis alloc
allocated.
The ID code of each piece of equipm
equipmen
equipment must be underlined and the associated service
description
ption must be positioned bene
benea
beneath the underlining.
For each piece of equipment, e excluding the machines, the ID code and the service
description must be positione
positioned close to the upper border of the drawing and should be
positioned, as far as possib
positioned possible, vertically above the described equipment.
Instead, the ID code and description for machines should be shown close to the lower
border of the drawing and should be positioned, as far as possible, vertically below the
describedd equ
equipme
equipment.
The process
rocess and
a utility lines must have arrows to indicate the direction of flow. If it
necessary
essary to define the control system, such as in the case of cascading controls,
arrows
rrows sh
should also be used on the instrumentation activation lines.
Proce
Process lines that, although present on the diagram, are not involved in the normal
pro
processing cycle must be highlighted by adding the wording NNF above the lines in
question.
The streams in input to and output from the battery limits must be identified, indicating
the type of process fluid, followed by its origin and destination, and this wording must be
positioned above the line involved.
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 8 (8)
The auxiliary service lines, if they do not represent the main streams on n the diagram
diagram,
and the lines of any discharges in the blowdown manifold must have ave limited size,
depending on the functional or graphical needs, be positioned close e to where they are
used and have arrows to indicate the direction of flow.
Their identification is assured by placing a rectangle at the e free end of the lines
themselves and writing the fluid ID code or, in the case e of flaringg discharges, the
destination, in the center of the rectangle.
A
Lines for chemicals must be of limited size, depending ngg on the functional or graphical
needs, and have arrows to indicate the direction of flow.
ow.
w.
Their identification must be assured by indicating the type off chemical, starting from the
free end of the feed line and positioning the wording
ding above the line in question.
rding
The symbols for the numbering the processs and/orr auxiliary service streams to list in the
Material and Heat Balance must be positioned, ned, in addition to at the battery limits, at each
tioned, ea
point of the flow line where there is s a cchange
hange
ange in any of the process variables (f (for
(fo
example, upstream and downstream upstream of
m of the heat exchangess and air coolers, upstrea
ZZ
the regulator valves, in pump and
The units of measurement to utilize ffor the Material and Heat Balance must comply with
the BEDD indications.
In the case where the BEDD does notn contain specific requirements, those indicated in
PRG.GG.NRM.0001 must be followed.
Design Criteria PRG.GG.NRM.000
Revision Memorandum
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 1 (2)
ANNEX I
PROCESS FLOW DIAGRAM (PFD) EXAMPLE
A
ZZ
BO
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 2 (2)
ANNEX I
PROCESS FLOW DIAGRAM (PFD) EXAMPLE
A
ZZ
BO
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 1 (1)
ANNEX II
MATERIAL AND HEAT BALANCE EXAMPLE
A
ZZ
BO
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 1 (2)
ANNEX III
PROCESS FLOW DIAGRAM SYMBOLS
A
Furnaces
AF001 Generic furnace
AF004 Steam reforming furnace
Columns
AC002 Filling column
AC003 Section column
ZZ
AC005
AC006
AC007
Reactors
AR001
Tray column
Tray column (two
Catalytic
o sections)
three
hree sections)
Tray column (three
Vessels
AV001 Generic vertical vessel
ve
AV002
2 Generic horizontal vessel
v
V003
03
AV003 Vessel with rounded protuberance
AV004
004 Jacketed vessel
BO
nks
Tanks
AT002
02 Cone-roof tank
4
AT004 G holder
Gas
AT006 spherica tank
Pressurized spherical
Heat exchangers
AE001 Generic heat
hea exchanger
AE002 G
Generic h
heat exchanger
AE003 S
Steam Heater
AE004 W
Wat cooler
Water
0
AE010 H
Heat exchanger coil with jacketed pipes
012
AE012 Kettle reboiler
Air-c
Air-co
Air-coolers
A
AI001 Air-coolers
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 2 (2)
ANNEX III
PROCESS FLOW DIAGRAM SYMBOLS
Pumps
AP002 Centrifugal pump
AP003 Rotary pump
A
AP004 Piston pump
AP006 Metering pump
AP009 Vertical pump
AS005
AS031
Generic centrifugal fan
tems
Sundry items
3
AE013 Desuperheater
L001
01
AL001 Mixer, injector, ejector, extractor
11
AL011 Stack
013
AL013 Flare
BO
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 1 (3)
ANNEX IV
ATIONS
TIO
ISSUE OF MATERIAL AND HEAT BALANCE SPECIFICATIONS
1. GENERAL
A
specifications, based on the following file templates:
x SPMTBLI.DOT Template for specifications
ons in Italian
tions Itali
x SPMTBLE.DOT Template for specifications
ifications
fications English
Englis
2. UE OF
ISSUE O SPECIFICATIONS
BO
sp
specific
The procedures for filling out the specifications of both the Italian and English versions
are substantially
ubstantially similar. The indicate
indicated instructions are therefore valid for both models.
The first
rst part is common, while the second part differs according to whether the
specifications are compiled from simulation output or filled out by hand.
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 2 (3)
ANNEX IV
ATIONS
TIO
ISSUE OF MATERIAL AND HEAT BALANCE SPECIFICATIONS
A
2.2 Creation of specifications from a list
Proceed as follows:
a) Move the output file to be used to the appropriate
propriate
ropriate directory.
b) Save the already-created file in the same
me directory as that containing the output file.
ame file
c) Select File-Open and then select All file
files (**) in the Files of ty
type drop-down
n box.
ZZ d) Select the output file and open
g) Return to the
he previously created destination Window command and then
estination file (use Wind
Win
e relevant
select the elevant fil
file name from the drop-down list that iis displayed).
Move the text insertion cursor to the point point where it is wished to insert the list
p
rmally the first line of the second page).
(normally page)
Insert-Field. Select
h) Select Insert-Field. ct Include
Includ from m the Insert
Inser Field list that is displayed.
w
The word Include is automatically
atically inserted in the Field codes text box (at the bottom
of the form).
BO
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.
$ PRG.PR.GEN.0002
Sheet 3 (3)
ANNEX IV
ATIONS
TIO
ISSUE OF MATERIAL AND HEAT BALANCE SPECIFICATIONS
Form code: MDT.GG.QUA.0516 Sht. 01/Rev. 1.94 File code: CRIDESBI.DOT Data file: PRG_PR_GEN_0002_R01_E.doc
CONFIDENTIAL document. Sole property of Snamprogetti. Not to be shown to Third parties or used for purposes other than those for which it has been sent.