You are on page 1of 1

0) For jobs costing © 1.

75% of the
above lacs. e 25 lacs and upto @25% of the rates
Rs.50 estimated /final cost , f or orig in al job .
subject to minimum
charges of Rs.
50,000/-per job.
C) For jobs costing @1 .5 % of t h e e s t i m a t e d / -do-
above Rs.50 lacs and final cost, su b ject to
upto Rs1crore. min imu m ch arg es of
Rs.37,500/- er *ob
d) For jobs costing @1.25% of the -do-
above Rs.1crore and estimated/final cost,
upto Rs.2crores. subject to minimum
charges of Rs.1,50,000/-
*er 'ob
e)For jobs costing more @1.00% of the estimated/ -do-
than Rs2 crores. final cost, subject to
minimum charges of
Rs.2,50,000/-per job

II Additions/alternations in @3.00% of the estimated


the existing /final cost, subject to
buildings /structures minimum charges of Rs.
3,000/- per job
III Fabricated/prefabricated @2.5% of the estimated 25%of the rates for
structures like portable /final cost, subject to original job
Milk Bars/Booths etc. minimum charges of Rs.
3,000/- per job
IV Interior desighing @4.00% of the estimated
/decoration jobs. /final cost, subject to
minimum charges of Rs.
5,000/- per job
Land scaping jobs @4.00% of the cost of ----
ground coverage jobs i.e.
except the cost of ready
made structures, like .
sculptures, shelters and
other such items which are
to be brought readymade
and fixed/placed at site as
such and the jobs which
can be paid separately
under any of the above
mentioned other heads,
subject to minimum
charges of Rs. 5,000/- per
lob.

You might also like