1. ARCHITECTURAL DRAWINGS
Preparing architectural working drawings for construction which includes detailed electrical,
structural & public health drawings.
2. CONSTRUCTION OF BUILDING
A. CIVIL WORK
Material to be used
Cement ultratech make
First class bricks & roof tiles
ISI marked Steel
Washed sand for RCC work
Crusher aggregates to be used in RCC
B. WOOD WORK
Window frames & Window shutters UPVC (as per drg)
Door frames & door shutters Teak wood and teak ply panels to be used in doors. (as per drg).
Cupboards made out in ¾ “ commercial board & finished with teak ply on shutters with
spirit polish or high gloss laminate or toughened glass & laminated inside .
Anti termite treatment will be provided for all the woodwork.
SCO 362 (2nd Floor), Sector 44-D, Chandigarh, E-mail: sahu_vijay@hotmail.com Ph: 99157-04404
ARCHITECTURE & CONSTRUCTION
D. WALL FINISH
Exterior will be finished with plaster in new construction as per drawings
Interior walls will be finished with P.O.P as per design ,& Painted with Acrylic emulsion paint
of desired colors of make Asian ,Dulux , Nerolac .
Exterior paint in new construction only matching with existing make Asian ,Dulux , Nerolac
(wherever needed )
E. FALSE CEILING
POP False ceiling will be provided in all the rooms as per design
G.SANITARY
Kohler fixtures for bathrooms (washbasin and W.C.).
G.I. pipes ( Jindal B make ) for water supply .
C.I. pipes ( B.F. make) for sanitary fittings.
Kohler C.P. fittings for bathrooms ( Diverters , Faucets , towel rail , soap dish ,paper holder,
looking glass ,etc. )
H. ELECTRICAL FITTINGS
PVC pipes ( Diplast make heavy ) .
Electrical wiring (Havells make or eq.)
Switches , plugs, MCB’s & main switch (Havells make or eq) provided as per drg ,
and discussion .
I. GLASS
8mm thick glass will be provided in windows (saint gobain or ashai make ).
6mm thick mirrors in bathrooms as per design.
Shower cabin to be provided in bathroom with Dorma make hard ware
SCO 362 (2nd Floor), Sector 44-D, Chandigarh, E-mail: sahu_vijay@hotmail.com Ph: 99157-04404
ARCHITECTURE & CONSTRUCTION
3. MODE OF PAYMENT
Advance 50%
During finishing 45%
At completion 5%
VIJAY SAHU
ARCHITECT OWNER
NOTE
Any changes in material or scope of work can be decided with mutual discussion .
Water & electricity charges will be paid by owner.
Any departmental charges will be paid by owner.
5 Months completion period if payment schedule is followed as per mode of payment.
Architectural fee will be 2% i.e. 60,000/-
Any additional work and any work in existing building will be charged extra.
SCO 362 (2nd Floor), Sector 44-D, Chandigarh, E-mail: sahu_vijay@hotmail.com Ph: 99157-04404