You are on page 1of 14

MTN 2021 RANMOD SSV REPORT

Rev. Date Description


1 28-03-2021 Proposed Pre/Post RANMOD Report Template

SITE NAME: L2322ADAMSO_RD


DRIVE TEST ENGINEER NAME Isaac A.

SITE ON AIR DATE


DRIVE TEST DATE 17/05/2021

REPORT PREPARED BY Saviour

Table of Contents
1 INTRODUCTION..................................................................................................................................... 2

1.1 AREA AND SITE OVERVIEW FROM GOOGLE EARTH............................................................................................2


1.2 BASIC SITE PARAMETERS............................................................................................................................2
1.2.1 SITE DATA................................................................................................................................................2
1.2.2 RF DATA...................................................................................................................................................2
1.2.3 RADIO CONFIGURATION DATA................................................................................................................2

2 MAP PLOTS........................................................................................................................................... 2

2.1 PCI PLOT............................................................................................................................................... 2


2.2 COVERAGE PLOT (RSRP).......................................................................................................................2
2.3 QUALITY PLOT (RSRQ)..........................................................................................................................2

3 L800 VOLTE TEST


…………………………………………………………………………………………………………………………….ERROR!
BOOKMARK NOT DEFINED.

3 KPI SUMMARY...................................................................................................................................... 2

3.1 ATTACH/DETACH......................................................................................................................................2
3.2 ACCESSIBILITY.......................................................................................................................................2
3.3 MOBILITY............................................................................................................................................. 2
3.4 RETAINABILITY.....................................................................................................................................2
3.5 INTEGRITY............................................................................................................................................2
3.4.1 THROUGHPUT STATIONARY TEST..........................................................................................................2
3.6 COVERAGE............................................................................................................................................2
3.7 SERVICES.............................................................................................................................................. 2

4 DATA TEST THROUGHPUT SCREEN SHOTS POST MODERNIZATION..........................................................2

4.1 SECTOR 1 THROUGHPUT SNAPSHOT...................................................................................................2


4.2 SECTOR 2 THROUGHPUT SNAPSHOT...................................................................................................2
SECTOR 3 THROUGHPUT SNAPSHOT................................................................................................................2

3.4.2 LATENCY RTT – STATIC PING TEST.......................................................................................................... 2

5 ACCEPTANCE......................................................................................................................................... 2

2021-06-27 Confidential Page2, Total14


1 INTRODUCTION

1.1 Area and site overview on Google Maps

1.1 Basic Site Parameters

1.2.1 SITE DATA

Site ID / Site Name 2322/L2322ASNMO_2_ET


Longitude / Latitude -1.759012/6.040935
U200Region ASHANTI REGION
Date 17/05/2021
RBS Cabinet Type
DUS Type  

1.2.2 RF DATA

Cell Name Cell ID Antenna Type M Tilt E Tilt Azimuth Antenna Height
L2322G1 0 Octaband 2 RET 340 48

L2322H1 1 Octaband 2 RET 190 48

L2322J1 2 Octaband 2 RET 260 48

2021-06-27 Confidential Page3, Total14


1.2.3 RADIO CONFIGURATION DATA

Frequency DL UL
Cell Name Cell ID TAI TAC PCI RSN BANDWIDTH
Band EARFCN EARFCN
L2322G1 0 202 20202 20 6375 24375 313 602 15MHz

L2322H1 1 202 20202 20 6375 24375 312 806 15MHz


L2322J1 2 202 20202 20 6375 24375 314 593 15MHz

2 MAP PLOTS

2.1 PCI PLOT

2021-06-27 Confidential Page4, Total14


2.2 COVERAGE PLOT (RSRP)

2021-06-27 Confidential Page5, Total14


2.3 QUALITY PLOT (RSRQ)

2021-06-27 Confidential Page6, Total14


2.4 QUALITY (SINR)

2021-06-27 Confidential Page7, Total14


1.1 DL THROUGHPUT DISTRIBUTION PLOT

2021-06-27 Confidential Page8, Total14


3 L800 VoLTE

4 KPI SUMMARY – POST MODERNIZATION

4.1 Attach/Detach
Attach 100%
Detach 100%

4.2 ACCESSIBILITY
SUCCES
DRIVE TEST CATEGOR TARGE
ATTEMPTS SUCCESS FAILURES S RATE PASS/FAIL
KPI Y T (%)
(%)
Session Setup Accessibility 6 6  0  100    
MO CSFB Accessibility  5  5  0  100    

4.3 MOBILITY

DRIVE TEST CATEGO ATTEMP SUCCES FAILUR SUCCES TARGE PASS/FA

2021-06-27 Confidential Page9, Total14


S RATE
KPI RY TS S ES T (%) IL
(%)
Intra Site LTE
Mobility 6 6 0  100  
HO  
IRAT HO to
Mobility 3 3    
3G
TAU (>95%) Mobility 0 0 0  0    

4.4 RETAINABILITY
PASS/FAI
DRIVE TEST KPI CATEGORY SETUPS DROPS DROP RATE (%) TARGET (%) L
Session Drop Retainability 6 0  0  

4.5 INTEGRITY

3.4.1 THROUGHPUT STATIONARY TEST

SECTOR DL PEAK TP (Mbps) DL AVG TP (Mbps) UL PEAK TP (Mbps) UL AVG TP (Mbps)


1 13.11 13.11 25.04 12.54
2 25.28 14.50 33.36 22.07
3 36.30 32.30 33.30 24.70

4.6 COVERAGE THRESHOLD

The coverage percentage of RSRP≥-95 dBm & SINR ≥-3dB Within 800m should >95% 100%

2021-06-27 Confidential Page10, Total14


4.7 SERVICES
HTTP/Browsing Verification OK
FTP/Streaming Verification OK

5 DATA TEST THROUGHPUT SCREEN SHOTS POST MODERNIZATION

5.1 SECTOR 1 THROUGHPUT SNAPSHOT

DL

UL

2021-06-27 Confidential Page11, Total14


5.2 SECTOR 2 THROUGHPUT SNAPSHOT

DL

UL

2021-06-27 Confidential Page12, Total14


5.3 SECTOR 3 THROUGHPUT SNAPSHOT

DL

UL

2021-06-27 Confidential Page13, Total14


5.4 LATENCY RTT – STATIC PING TEST

CELL NO OF PINGS AVG LATENCY (ms) TARGET LATENCY (ms) PASS/FAIL


SECTOR 1  10 20  
SECTOR 2  10 18  
SECTOR 3  10 22  

6 ACCEPTANCE

Acceptance
Remarks

Signed by (Huawei)

Signed by (MTN)

Date of acceptance

2021-06-27 Confidential Page14, Total14

You might also like