You are on page 1of 7

Site Modernization Report of

G1441NWANSANMIRE_GU

Huawei Technologies Co., Ltd.


MAY 19, 2021
All rights reserved

1
Content
1 BASIC PARAMETERS..............................................................................................................................2
1.1 SITE INFORMATION........................................................................................................................2
1.2 ANTENNA INFORMATION.............................................................................................................2
2 THE ANALYSIS ON DT............................................................................................................................2
2.1 CELL ID DISTRIBUTION.................................................................................................................2
2.2 RX_LEV_SUB......................................................................................................................................2
2.3 RX_QUAL_SUB...................................................................................................................................2
3 ACTIONS.....................................................................................................................................................2
4 SUMMARY..................................................................................................................................................2

2
1 BASIC PARAMETERS
1.1 SITE INFORMATION
Market MTN 900/1800 RANMOD
Site name
G1441NWANSANMIRE_GU
Latitude/Longitude 6.79127/-1.67685
General location ASHANTI REGION
Date 19/05/2021
BTS Type OUTDOOR
Site Config

1.2 ANTENNA INFORMATION

Antenna Mech Elect RF


Cell ID Band Antenna Type Tilt Tilt Azimuth Height
AR1441 Octaband Huawei Octaband 4 54
RET 40
D
AR1441E Octaband Huawei Octaband 6 RET 230 54

AR1441F Octaband Huawei Octaband 6 RET 290 54

AR1441A Octaband Huawei Octaband 4 RET 40 54

AR1441B Octaband Huawei Octaband 6 RET 230 54

AR1441C Octaband Huawei Octaband 6 RET 290 54


2 THE ANALYSIS ON DT
2.1 CELL ID DISTRIBUTION

900_Before Modernization 900_After Modernization

1800_Before Modernization 1800_After Modernization


2.2 RX_LEV_SUB

900_Before Modernization 900_After Modernization

1800_Before Modernization 1800_After Modernization


2.3 RX_QUAL_SUB

900_Before Modernization 900_After Modernization

1800_Before Modernization 1800_After Modernization


3 Actions
There were no sector swaps and all site basic functionality is satisfactory.

4 Summary

Site basic functionalities are working fine and stable as verified by site visit, drive test measurement
and statistical KPI monitoring.
The performance of the site is OK and the township is well covered.

Checked Comments and corrective


Checklist
(Yes/NO) actions
Cells on-air Yes No issue
BCCH as planned Yes No issue
BSIC as planned Yes No issue
Neighbor Cells Yes No issue
Handovers Yes No issue
Dropped calls Yes No issue
Coverage issues Yes No issue

Approved Approved

Task Name E-mail Telephone


DT Haruna harubala291@gmail.com 0244737306

4 Appendix

4.1 The contact engineers

You might also like