You are on page 1of 4

Raymond S.

Revilla
Unit-D Ipil-Ipil St. Corner Mulawin St.
Lakeview Subd. Barangay Bucal
Calamba, Laguna Philippines
Mobile # 0939-2648006 / 0920-4642317
Phone # 049-5455844
Email add : bongrevilla913@yahoo.com

Mr. Revilla has more than 13 years of working experience in abroad and almost 3 years local
experience in the field of Telecommunication OSP/ISP. Implementation of copper and fiber optic cable
through different country local and international standard. He has a strong background in
Telecommunication Industry, experience in Implementation of new fiber optic cable, FTTH Project (Fiber to
the Home) Wireless Internet Broadband, DSL installation or Lease line of Nokia and Telindus Modem for
Smart BTS, Cut-over in MDF/ODF, Installation of MDF/ODF. Knowledge in Cable laying, Cable installation
and Testing using the following test Equipment like, OTDR, Power Meter, BER Tester, Earth Tester, Riser
Band, Insulation Megger. And familiar to use different kind of fusion Machine like, Siemens X-77, Fujikura,
Sumitomo, Yokogawa, Techwin Mark fusion machine for Fiber Optic Splicing. He also proven management
and leadership skills, strategic planning, business process improvement and organizational development in
the field of telecommunication project.

WORK EXPERIENCE

Project Manager Jun. 17, 2008 to Feb. 06, 2012


Fast Planets Engineering Design and Consultants
P.O. Box 56823 Code 11564
Riyadh, Kingdom of Saudi Arabia

 Preparation of 3 weeks look ahead schedule to meet the desire target date, and ensure
proper safety guidelines are being followed and implemented by all concerned during
operation.
 Monitor the project material, manpower availability during operation and make
recommendation to simplify operation and improve process and quality.
 Analyzed the project profit during field survey, preparation for cable route plan, materials
and equipment, review and improved the management objectives required by the clients
and planned how gain more profit.
 Supervise and assists supervisors and site manager during installation, termination,
splicing of Fiber Optic Cable, manage the workforce under his jurisdiction through knowing
each one of them to have smooth and uninterrupted operation.
 Review and prepare the materials cost for every new projects, planning and design before
implement the project.
 Reviews and Analyzes employment contracts relative to its execution/implementation.
See to it that employment contracts are carried out accordingly and develops
strategies/developments for its improvement.

Project Manager May 24, 2004 to Aug. 25, 2007


Gulf Works Nassar Misfer Al-Haider General Cont. Co.
P.O. Box 5652 Dammam 31654
Dammam, Kingdom of Saudi Arabia

 Attending to the senior management STC (Saudi Telecom Co.) Client and section
manager for the progress report and coordinate for any deviation problem encountered
with regards to quality.
 Reconciling actual manpower on-site and manpower request then afterwards generate
weekly and monthly report and ensures the project documents as built, red lines drawing,
invoicing are completed and tracks the record and reports associate’s expenses weekly.
 Prepared the weekly and monthly progress report to the General Manager/ CEO for the
status of the project, discuss and solve the problem and make recommendation to solve
the issue and improve the target date.
 Conducting an orientation for all the employees regarding the newly created and approved
company rules and regulations.

Site Manager Nov. 5, 2001 to Oct.13, 2003


Al-Habib Trading & Contracting Co.
P.O. Box 5688 Dammam 31432
Dammam, Kingdom of Saudi Arabia

 Supervised the field survey preparation for cable route plan base to client map, reroute
some cable route if necessary and make a new plan and schedule the men for the right job
for different section or function in field of telecommunication.
 Preparation of work procedure and schedule for testing and test result for probation
acceptance test before the hand-over of the project.
 Make sure all the accessories of each cabinet termination are properly installed, proper
tagging, earth grounding, cabinet number are correct and all fiber lines are working and
passed in testing procedure like Power Meter and OTDR (Optical Time Domain
Reflectometer).
 Enhance organizational effectiveness by identifying and analyzing current circumstances;
implementing organization development interventions; providing training programs;
developing and maintaining succession plans.
Project Engineer Nov. 17, 1997 to Sep. 30, 2001
Siemens Public Communication Networks
Jalan 546 Ngurarai Pass Sanur Ayu
Bali, Indonesia

 Preparation of work procedure and schedule, Supervise during cable installation,


termination of fiber optic cable and conduct a series of testing even working lines without
service interruption.
 Conduct field survey and rerouting of some cable if not applicable, make recommendation
to simply operation and improve process quantity and quality and make sure proper safety
guidelines are followed and implemented.
 Make a progress report and Implement the fiber pooling, installation and termination of
fiber optic cable and make sure of using the proper tools are used during the operation to
meet the desire target without interruption.
 Always implement the Proper safety guidelines are being followed by all concerned during
operation.
 Maintains records and compiles statistical reports concerning personnel-related data;
analyzes statistical data and reports to identify and determine causes of problems;
recommends improvement of personnel policies and practices.

Assistant Engineer Jan 20, 1994 to Sep. 15, 1997


MARUBENI Corporation
4/F Fifco bldg.. Pasong Tamo Extension
Makati City, Philippines

 Conduct field survey for new primary and secondary cable route, plan and preparation of
test result for probation acceptance test and prepared the as build plan to be submitted to
the client.
 Check and monitor during cable laying, splicing to ensure the standard procedure will be
follow during operation.
 Supervise during installation, termination of fiber optic cable / copper cable in cabinet,
ODF/MDF and prepare testing report before and after the inspection.
 Checking and monitor the line construction for fiber optic cable laying, splicing, termination
and testing of power supplies and other equipment accessories inside the equipment
room.
 Always implement the Proper safety guidelines are being followed by all concerned during
operation.
Note:

Qualified to become Project Manager


With drivers license.
The applicant didn’t continue because he was offer a more high paying job specifically Ericson

You might also like