BASERISK BASERISK
TYPEOF (WITHOUTCONTROL) (WITHCONTROL)
TASK/JOBSTEPS LISTOFHAZARDS MITIGATING CONTROLS
DAMAGE
L C Risk L C Risk
Minor physical Ensure all manpower should follow the proper manhandling procedure in preparation of
Got hit by tools and materials 2 3 C materials 1 3 D
injury
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety shoes,
hard hat including safety goggles
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety shoes,
hard hat including safety goggles
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety shoes,
Minor physical hard hat including safety goggles
Personal injury (Eye, head, foot, body) 2 3 C 1 3 D
injury
A Preparation of tools, Unauthorized personnel should not allow to work on working area
materials and equipment
Follow the proper body positioning in preparation of materials
Minor physical
Accident due to improper body posture 2 3 C 1 3 D
injury
Proper man-handling should be exercised to prevent ergonomic stress
In case of bad weather condition / heavy rains, work should be stop immediately
Minor physical
Accident due to bad weather condition 2 3 C 1 3 D
injury
Always update / monitor the weather condition
Serious physical Provide appropriate resting shelter and drinking station intended to the workers involved with
Accident due to heat stroke / heat stress 2 3 C 1 3 D
injury / Fatality the tasks
Safety awareness regarding heat stroke / heat stress should be discuss prior to start the work
Got hit by hand tools Minor physical 2 3 D Safety briefing and vigilant monitoring 1 3 D
injury
Ensure all manpower should follow the proper manhandling during duct fabrication
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety shoes,
hard hat including safety goggles
Minor physical Proper man-handling should be exercised to prevent ergonomic stress in duct fabrication
Accident due to ergonomic stres 2 3 C 1 3 D
injury
Follow proper body positioning in duct fabrication
Ensure the area is free from any obstruction prior to start the work
Minor physical Wear proper personal protective equipment such as, hand gloves, long sleeve, safety shoes,
Accident due to slip / tripping hazard 2 3 C 1 3 D
injury hard hat including safety goggles
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety shoes,
Minor physical hard hat including safety goggles
Personal injury (Eye, head, foot, body) 2 3 C 1 3 D
injury
Unauthorized personnel should not allow to work on working area
In case of bad weather condition / heavy rains, work should be stop immediately
Minor physical
Accident due to bad weather condition 2 2 D 1 2 E
injury
Always update / monitor the weather condition
B. Duct fabrication Standby first aider on working area for possible emergency
Serious physical Provide appropriate resting shelter and drinking station intended to the workers involved with
Accident due to heat stroke / heat stress 2 3 C 1 3 D
injury / Fatality the tasks
Safety awareness regarding heat stroke / heat stress should be discuss prior to start the work
Use double eye protection (safety goggles with face shield) in this particular activity
Minor physical Barricade and signage should be put in place to warn the public
Dust emission 2 3 C 1 3 D
injury Unauthorized personnel should not allow to work on working area
Ensure the area is free from any obstruction prior to start the work
Minor physical
Accident due to slip / tripping hazard 2 3 C All materials should be properly segregated 1 3 D
injury
Maintain good housekeeping on working area
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety
Minor physical shoes, hard hat including safety goggles
Personal injury (Eye, head, foot, body) 2 3 C 1 3 D
injury
Unauthorized personnel should not allow to work on working area
Minor physical Follow the proper body positioning in concrete chipping works
Accident due to improper body posture 2 3 C 1 3 D
injury Proper man-handling should be exercised to prevent ergonomic stress
Minor physical Safety briefing to all personnel prior to start the work
Accident due to horse play 2 3 C 1 3 D
injury
Assign personnel to continuous monitoring on working area
Minor physical In case of bad weather condition / heavy rains, work should be stop immediately
Accident due to bad weather condition 2 2 D 1 2 E
injury
Always update / monitor the weather condition
C. Duct Installation Standby first aider on working area for possible emergency
Serious physical Provide appropriate resting shelter and drinking station intended to the workers involved
Accident due to heat stroke / heat stress 2 3 C with the tasks 1 3 D
injury / Fatality
Safety awareness regarding heat stroke / heat stress should be discuss prior to start the
work
Check the drawing for any existing under slab utilities prior to duct installation works
Ensure all electrical cables and machines are properly inspected prior to start work
Minor physical
Accident due to Electrocution 2 5 D 1 3 D
injury
Only Authorized personnel should use the Electric drill and Electric grinder
Ensure all electrical cables are not lay down on the wet ground.
In case of bad weather condition / heavy rains, work should be stop immediately and
secure all electrical machines.
Use double eye protection (safety googles with face shield) in this particular activity,
Wear proper Personal protective equipment such as hand gloves, long sleeve, safety
shoes, hard hat including safety goggles.
Use double eye protection (safety goggles with face shield) in this particular activity
Minor physical Barricade and signage should be put in place to warn the public
Dust emission 2 3 C 1 3 D
injury Unauthorized personnel should not allow to work on working area
Ensure the area is free from any obstruction prior to start the work
Minor physical
Accident due to slip / tripping hazard 2 3 C All materials should be properly segregated 1 3 D
injury
Maintain good housekeeping on working area
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety shoes,
Minor physical hard hat including safety goggles
Personal injury (Eye, head, foot, hand, body) 2 3 C 1 3 D
injury
D. Duct Insulation Works Unauthorized personnel should not allow to work on working area
Minor physical Follow the proper body positioning in doing duct insulation works.
Accident due to improper body posture 2 3 C 1 3 D
injury Proper man-handling should be exercised to prevent ergonomic stress
Minor physical Safety briefing to all personnel prior to start the work
Accident due to horse play 2 3 C 1 3 D
injury Assign personnel to continuous monitoring on working area
Minor physical In case of bad weather condition / heavy rains, work should be stop immediately
Accident due to bad weather condition 2 2 D 1 2 E
injury Always update / monitor the weather condition
Poor Illumination Minor physical 2 3 C Good Adequate lighting must be provided ensuring a safe working environment for those
injury persons who have to work during the hours of darkness prior to start work.
Ensure all lighting installed should be in good condition.
Minor physical Inspect the condition of the cables and machine prior to start work.
Electrocution 2 5 D 1 3 D
injury Only certified electrician should terminate all electrical wirings.
Electrical cables should not lay on the wet ground.
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety shoes,
hard hat including safety goggles
Safety briefing should be initiated prior to start the work regarding the safe work on the
Incident bitten by bee, insect, snake and Minor physical
2 3 C working area during night / overtime works. 2 3 C
other venomous animals injury
Advice all personnel working at overtime / night works to rest only on the designated
resting shelter.
Inspect the working area for possible beehive to avoid insect bites.
E. Night Work / Overtime Work
Install adequate lighting on access way and especially on working area.
Slip / Tripping Hazard Minor physical
Remove all unnecessary / scattered materials stowed on the ground working place
injury 2 3 C 1 3 D
Maintain good housekeeping at the work site area
Wear proper personal protective equipment such as, hand gloves, long sleeve, safety
shoes, hard hat including safety goggles
Wear appropriate personal protective equipment during disposal of waste materials
Minor physical
Accident due to improper disposal of waste injury / Disposal of soil should be coordinated to the concerned department.
F. Disposal of waste materials 2 3 C 1 3 D
materials Environmental
hazard Proper segregation of waste material should be initiated and these will be disposed into a
designated staging area or landfill area authorized by the client.
5 10 15 20 25
5
Likely
4 8 12 16 20
4
Probable
3 6 9 12 15
3
Occasional
2 4 6 8 10
2
Unlikely
1 2 3 4 5
1
Likelihood
VeryLow Low Moderate High VeryHigh
12 1 2 3 4 5
Consequence
16-25 Unacceptable/Intolerable A
10-15 Substantial B
6-9 ModeratetoAcceptablewithReview C
3-5 Tolerable D
1-2 Acceptable E