Professional Documents
Culture Documents
Completed
1 Quality Policy and Assurance System 11 11 0 0%
Completed
3 Project Management 20 18 2 10%
A
S
E 4 Process Design and Pre production 12 12 0 0%
S
C
H 5 Ramp up Activity 1 1 0 0% Partially
A completed
P
T
E
R
6 Operator Training 8 0 8 100%
S
Completed
7 Shop Floor Management 39 10 29 74%
Total 65 66 50.38%
RNTBCI Name
Ankit , Gaurav,
Reviewed by
Sanjeev
# 000000Confidential C
Doc. No. IQMS-C060-F-0003
Completed
W4=5 closed
W5& W1=6 closed
W4=3 closed
W4=6 closed
W5& W1=6 closed
W2=6 closed
W4=4 closed
W5& W1=4 closed
W2=4 closed
W3=4 closed
W5&W1=4 closed
W3=13 closed
W5&W1=13 closed
W2=14 closed
W4=5 closed
W5 & W1=5 closed
W2=4 closed
W3=3 closed
W2=3 closed
# 000000Confidential C
# Chapter 1: Quality policy and quality assurance system Supplier Name Function Date
Renault Nissan
Question Date Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Technico Status
Status
Next Audit Cycle (Dec'-20) complete store department process shall be covered
1.1 Store department has single process but only BOP store audit is being performed. Gaurav 6/23/2021 Close Open
and schedule to be revised.
1.1 30.04.21 Internal audit NC classification (Major / Minor) & closure timeline Internal audit NC clasification and closure timline to be update Gaurav 6/23/2021 Open Open
1.1 30.04.21 Internal audit NC tracking sheet not updated the current NC status Internal audit NC tracking sheet to be updated Gaurav 6/23/2021 Open Open
1.1 30.04.21 Internal audit NC report not evidenced. Internal audit NC report to be prepared Gaurav 6/23/2021 Open Open
1.1 30.04.21 Process audit NC closure timeline not defined in the procedure Process audit NC clouser timeline to be defined Gaurav 6/23/2021 Open Open
1.1 30.04.21 Process parameter verification not evidenced in internal audit Porcess paramter to be verified in internal audit Gaurav 6/29/2021 Open Open
1.1 ASES report IATF Auditors list is available but contingency for auditor not define in it. IATF Auditor list to be update. Gaurav 6/29/2021 Close Open
1.2 ASES report Process Audit Plan available but not updated for the Aug-20 month. Process Audit to be update Gaurav 6/29/2021 Close Open
1.2 ASES report Process Parameter observation for the SDH not evident in the report. Process Audit Report to be cross-verify after audit. Ashwani, Rishu, Vinod 6/29/2021 Open Open
Process Audit performed for the pedal wrt customer complaint, but its
1.2 ASES report Customer Complaint details wrt corrective actions to be considered. Ashwani, Rishu, Vinod 6/29/2021 Close Open
observation define as "OK"
Open 7 11
Close 4 0
Total 11 11
# 000000Confidential C
Warranty - gaurav Pankaj-
Mayank Chaudry- Internal 8D
Gupta QMS analysis
# Chapter 2: Analysis of the quality concerns for current products Supplier Name Function Date
QMS -
Open Prepared by Gaurav 21.09.2020
Incharge
Question Date Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Technico Status Renault Nissan Status
Warranty register not covered some of the key activities like Customer, Within
2.2 30.04.21 warranty or not, NTF, 8D report, etc Warranty register to be updated Mayank Close Close
Warranty performance results from customer to be shown for FY21.
2. Defect selection criteria is not clear for Inhouse cause analysis. No cause analysis / actions available for top inhouse 2.(a,b,&f) Procedure for CAPA to
defect in Mar2020. Ex. Gauge NG - Part: Door hinge YP8 RUL, Qty 70 nos. be be revised considered the
selection criteria for the inhouse
a. Internal rejection Target : not shared cause analysis, the phenomenon
b. Top 3 defect & Top 1 model to be mentioned in procedure analysis and effectiveness
c. Angle NG - Sep'20 - YE3 MC HH LH - Spec 86.5 Deg - 1.5 Deg found 89 Deg monitoring.
2.3 ASES · Valid cause : Shut height variation not analysed. Restrike tool not available Gaurav Close Close
2.(c &d) External Training to be
d. Internal analysis done only for Assy process. Stamping not found. provided to the concern person for
e. Summary sheet for all process need to be aligned. the why-why, root cause analysis.
f. 3 months monitoring not followed for YRA dent issue - followed for 3 lots – Need to update in procedure 2e. Common Pareto and Summary
Sheet Formato to develop and same
to be shared.
000000Confidential C
#
Warranty - gaurav Pankaj-
Mayank Chaudry- Internal 8D
Gupta QMS analysis
# Chapter 2: Analysis of the quality concerns for current products Supplier Name Function Date
QMS -
Open Prepared by Gaurav 21.09.2020
Incharge
Question Date Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Technico Status Renault Nissan Status
* Internal rejection analysis not taken for the top 3 defects in each sections. Ex:
Thread wash out Aswani, Vinod &
11.05.21 Close Close
* Internal rejection analysis not in depth for Gauge not answering. Rishu
ASES/ Phenomenon wise analysis not available based on the customer effect.
2.3 Mayank 6/21/2021 Open Open
11.05.21 Ex: Screw jack
Terminology to be define in the the
CAPA procedure and in the CAPA
Summary for the mandatory
documents (such as PFD, PFMEA,
Control Plan, SOP, WI) shall be
updated during the closure any
4. Affected documents are not identified and updated for Customer / Inhouse CAPA. Ex. PFMEA, Control plan etc.,
customer concern.
Customer Defect Handling:-
a. No training record available for the Maintenance operator, no re-calibration record not available
Customer defect Handling:-
List of affected documents not updated for the customer concern on Feb'21 Nut b. No change in calibration frequency. Calibration date not in-line with analysis report Aswani, Vinod &
2.4 11.05.21 4a. All the record to be attached Close Close
shift in Hood Hinge- PM check sheet not updated. c. Concern effectiveness monitoring not clear - Oct'20 - closed - not to be followed for complaint date/ corrective action. Rishu
with Customer complaints and other
issue closure.
Inhouse handling:-
4b. Re-analysis to be done the
a. Document Update : Restrike process added but Control plan, FMEA, Work instruction not updated
calibration frequency.
4c. Procedure to be revised.
Inhouse Handling:-
4a. Training to be provide for the
5. Horizonal deployment opportunities are not identified through study and not implemented where it is applicable. Ex. document updation wrt CAPA.
Side Door Hinge - YE3, Defect: Flatness NG, Similar parts: 13.
Horizontal Deployment
Customer Defect Handling:-
effectiveness sheet to be developed
a.Horizontal deployment not evident for other riveting machines Aswani, Vinod
2.4 ASES report and linkage to be done with the Close Close
,Rishu & mayank
procedure and same to be verify for
the effectively implementation.
Inhouse Handling:-
a. Horizontal deployment not clear – BDH – K10 identified, but already restrike process exists with that part
6. Past trouble database is not prepared based on past customer / inhouse concerns CAPA.
Past trouble data sheet and lesson
Customer Defect Handling:-
learnt sheet to be develop and
a. PTDB only Tier 1 actions added – PTDB covers only generic data not based on customer or internal analysis - Excess
linkage to be done with the
play not captured. Aswani, Vinod
2.4 ASES report procedure accordingly. Close Close
b. PTDB contents not matching with cause analysis and technical lessons learnt not available ,Rishu & mayank
PDTB for the other program/project
c. No responsible person and last update date available
to be develop and save it in the
record.
Inhouse Handling :-
a. No PTDB followed for Internal cause analysis and no Technical lessons learnt followed for Internal analysis
Repeated concerns monitoring is not defined and special attention is not defined Repeated Issue handling criteria to
2.4 11.05.21 8. Repeated concerns monitoring is not defined and special attention is not defined for repeated concerns. Gaurav Close Close
for repeated concerns. be define in the CAPA procedure.
No list of affected documents not updated for the internal 8D actions. Ex: Apr'21 Aswani, Vinod &
2.4 25.05.21 To be prepared Close Close
Nut Spatter - CP/ PFMEA not updated Rishu
No horizontal deployment of internal 8D actions. Ex: Apr'21 Gauge not Aswani, Vinod &
2.4 11.05.21 To be update Close Close
answering / Gap issue, etc.Boss Gauge Out Rishu
No tracking sheet available for the internal 8D report which includes past years Aswani, Vinod &
2.5 11.05.21 To be prepared Close Close
also Rishu
Customer complaint Tracking sheet not covered the timeline with Plan / Actual
2.5 11.05.21 To be update Mayank Close Close
date to track the activities
000000Confidential C
#
Warranty - gaurav Pankaj-
Mayank Chaudry- Internal 8D
Gupta QMS analysis
# Chapter 2: Analysis of the quality concerns for current products Supplier Name Function Date
QMS -
Open Prepared by Gaurav 21.09.2020
Incharge
Question Date Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Technico Status Renault Nissan Status
Open 1 3
Close 18 17
Total 19 20
% Action
95% 85%
Implemented
000000Confidential C
#
# Chapter 3: Project Management Supplier Name Function Date
QMS -
Open Prepared by Gaurav 21.09.2020 Irshad
Incharge
Question Date Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Status
Phase review meeting timing is not addressed in the Capture the Phase review meeting timeline in the APQP Phase review meetinng timeline to be
3-4 ASES Report Irshad 6/22/2021 Open
APQP time plan time plan. Ex Screw jack updated
Phase review checksheet, control items with quantified Define checksheet, control items with quantified target
3-4 ASES Report Phase review checksheet to be prepared Irshad 6/22/2021 Open
target is not defined. to phase review process.
Past troubles and lesson learning incorporation / Add Past troubles & lesson learnt incorporation as Past trouble and lesson learnt to be
3-4 ASES Report Irshad 6/22/2021 Open
implementation is not considered for phase approval. criteria for phase approval. incorporated for phase approval
000000Confidential C
#
# Chapter 3: Project Management Supplier Name Function Date
QMS -
Open Prepared by Gaurav 21.09.2020 Irshad
Incharge
Question Date Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Status
SMS - Training plan not made for the VC lot/ PT1/ PT2
milestones. Training plan to be made for each milestones
3-3 25.05.21 SMS- Control plan not planned before VC lot & not Sanjeev Control plan activity to be planned Irshad 6/29/2021 Open Closed
prepared yet. Capability study to be planned
SMS- Capability study not planned for the VC lot.
No internal project review meeting & Minutes of Internal project review meeting & Minutes of meeting
3-3 25.05.21 Internal review meeting mom ro be prepared Irshad 6/29/2021 Open
meeting not evidenced for Nissan- Screw jack parts evidenced for Nissan- Screw jack parts to be shown
No project risk assessment carried out for the Nissan Project risk assessment to be shown for the Nissan
3-3 25.05.21 Project risk assessment to be prepared Anil (Design) 6/29/2021 Open
Project - Screw Jack. Project - Screw Jack.
No evidenced for the design review meeting & minutes Evidenced to be shown for the design review meeting
3-3 25.05.21 Design review minutes to be prepared Anil (Design) 6/29/2021 Open
before end of the design milestone. & minutes before end of the design milestone.
Progress review frequency is not defined in the Capture the progress review meeting frequency in the
Process review meeting frequency to be
procedure. Progress review meeting plan vs actual procedure and timeline in the APQP timing plan. Gaurav &
3-3 ASES Report defined in procedure and review meeting 7/6/2021 Open
status is not captured in the Conduct the review Irshad
plan vs actual to be captured in timing plan
APQP timing plan. as per plan and update the status accordingly.
No evidenced for the past troubles & lessons learnt PTDB & Lesson learn for screw jack design
3-3 25.05.21 Anil (Design) 7/6/2021 Open
fedback to Screw jack Design. to be prepared
3-3 25.05.21 No SPPMP evidenced for the Nissan Screw jack parts. Sanjeev SPPMP to be prepared Irshad 7/6/2021 Open
000000Confidential C
#
# Chapter 3: Project Management Supplier Name Function Date
QMS -
Open Prepared by Gaurav 21.09.2020 Irshad
Incharge
Question Date Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Status
Open 18
Close 2
Total 20
% Action
Implemente 10%
d
000000Confidential C
#
# Chapter 4: Process Design and Pre production Supplier Name Function Date
Question ASES Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Status
Define the period to past rejection data. Collect and formalise the data
No past rejection data is collected and used to Past rejection data to be collected
4.1 ASES report according to AIAG guideline to assign occurrence Naveen 6/30/2021 Open
assign Occurrence rating for assign occurrence rating
rating.
Consolidate the past troubles with root causes / actions and lesson learnt
Review of PTDB and lesson learn
Past troubles / lesson learnt applicability and as data base. Conduct the review during PFMEA
4.1 ASES report for applicability during FMEA Naveen 6/30/2021 Open
deployment status is reviewed preparation to identify the applicability. Follow action plan to deploy the
preparation to be done
applicable past troubles.
Revision level and revision history details are Revison level and history to be
4.1 ASES report Revision level and revision history details to be captured in the PFMEA Naveen 6/30/2021 Open
not captured in the PFMEA captured in FMEA work sheet
000000Confidential C
#
# Chapter 4: Process Design and Pre production Supplier Name Function Date
Question ASES Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Status
Open 12
Close 0
Total 12
% Action Implemented 0%
000000Confidential C
#
# Chapter 5: Ramp up Activity Supplier Name Function Date
Question Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Status
5.1 Ramp up activity plan not available for Nissan model Screw Jack Ramp up activity plan to be prepared for Nissan model Screw Jack Ramp up activity plan to be prepared for Nissan model Screw Jack Irshad 6/19/2021 Open
Open 1
Close 0
Total 1
% Action Implemented 0%
# 000000Confidential C
# Chapter 6: Operator Training 6 Supplier Name Function Date
Question Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Status Internal Status
1. New operator training and skill evaluation records are not available for assessed case.
Ex. Mr. Satrugan, Employee code: 600209, Process: Tandum , Mr. Sonu yadav, New Operator Training and skill records to be maintained within the
6.1 Chandra Pal & Indu Yadav Close Close
Employee code: 11873, Process: ASSY, Mr. Ratnesh yadav, Employee code: 46039, HRD.
Process: Tandam - DOJ: 03-01-2020.
2. Training & skill evaluation records are not available for existing operators. Ex. Mr. Training and skill evaluation activity going on and their record to be
6.1 Aditya, Surjeet, Amit Close Close
Shivashankar, Process: Manual projection welding, Skill level as per Skill matrix - L2. verify by the HOD before hand overing it to the HR.
3. Reinforced inspection for new operator produced parts is not defined and followed. Ex.
Rule for the Reinforced inspection for new operator produced to be
6.1 Mr. Satrugan, Employee code: 600209, Process: Tandum , Mr. Sonu yadav, Employee Aditya, Surjeet, Amit 6/16/2021 Open Close
define and training for the same to be given.
code: 11873, DOJ: 03-01-2020.
4. Operator observation plan and records are not available. Ex. Mr. Satrugan, Process: Operator observation plan for the individual section to be develop
6.1 Aditya, Surjeet, Amit Close Close
Tandam, Mr. Shivashankar, Process: Manual projection welding. and followed .
New Project Training plan not covered for the PT1 / PT2 New Project Training plan which should covered for the PT1 / PT2 additional operators,
6.1 11.06.21 New project training plan to be updated Irshad 6/16/2021 Open Close
additional operators, etc. etc.
New project training manual not included in the difference b/w New project training manual which includes the difference b/w existing project & new
11.06.21 existing project & new project Process flow, Defect includes project Process flow, Defect includes appearance, Rework matrix, Appearance defects, Training module to be updated Irshad 6/16/2021 Open Close
appearance, Rework matrix, Appearance defects, etc. etc.
No refreshment training defined for the operators long No refreshment training check sheet to be defined for the operators long absenteeism. Ex:
11.06.21 Refreshment training check sheet to be prepared and implemented Gaurav 6/16/2021 Open Close
absenteeism. Ex: More than 1 month Absent More than 1 month Absent
000000Confidential C
#
# Chapter 6: Operator Training 6 Supplier Name Function Date
Question Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Status Internal Status
11.06.21 Operator feedback not given based on the operation observation. Operator feedback to be given based on the operation observation. Provison to give feedback to operator after observation to be defined Gaurav 6/16/2021 Open Close
Open 8
Close 3
Total 11
000000Confidential C
#
# Chapter 7: Shop Floor 18 Supplier Name Function Date
000000Confidential C
#
# Chapter 7: Shop Floor 18 Supplier Name Function Date
000000Confidential C
#
# Chapter 7: Shop Floor 18 Supplier Name Function Date
Rework record is not followed always for all kind of Educate the concerned members to
Rework record to be prepared for all Gaurav, Surjeet, Aditya and
7.11 ASES report rework. Ex. Process: Bush fitment line, Rework: record the rework details when 7/1/2021 Open Closed
kind of reowrk Vinod
Bush improper fitment. rework performed
000000Confidential C
#
# Chapter 7: Shop Floor 18 Supplier Name Function Date
Open 39
Close 0
Total 39
% Action
0%
Implemented
000000Confidential C
#
# Chapter 8: Change Management 5 Supplier Name Function Date
Question ASES report Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Status Internal Status
There is no special identification for 4M change affected lot to provide special Gaurav, Aditya, Surjeet &
8.1 ASES report Define and follow the identification method for 4M change affected lot. Special identification for 4M change effected lot to be done 6/23/2021 Open Closed
attention till part delivery. Vinod
Some process changes are not captured in the change definition. Ex. Packaging,
8.2 ASES report Add missing process changes into process change definition. (Refer ANPQP guideline). Missing changes to be added in process change defination Gaurav 6/23/2021 Open
logistics changes, machine deletion etc.,
Change request, Feasibility study, Risk analysis and Activity timing plan is not Educate the concerned members to follow change request, feasibility study, risk analysis and activity timing plan according to
8.2 ASES report Documented to be prepared as per process for process change Sanjeev / Irshad 6/29/2021 Open
available for assessed change. procedure.
Trial report, Before / after comparison interms of quality and productivity is not Perform trial part inspection, before / after comparison for process capability, rejection ratio, change intend, cycle time etc.,
8.2 ASES report Backup data of trail report and before / after comparision to be prepared Sanjeev / Irshad 6/29/2021 Open
available for assessed change. according to the procedure and keep the record
Internal PSW approval or similar and change implementation cut off is not Obtain the internal approval according to 4M change approval criteria and keep the record of change implementation cut off
8.2 ASES report Internal approval to be taken and implementation cutooff to be defined Sanjeev / Irshad 6/29/2021 Open
available for assessed change. details.
Progress of change status is not monitored through change tracking sheet. Case
2: Timer/buzzer controller to be added in pre-treatment process to avoid the
8.2 ASES report Add each 4M change into change tracking sheet to monitor the status of each steps. Process change tracking sheet to be prepared Sanjeev / Irshad 7/5/2021 Open
manual control., Complete Auto control line to be
install for PT line, Pedal Set Brake, YCA, action date: 20-02-2020.
Change request, Feasibility study, Risk analysis and Activity timing plan is not Educate the concerned members to follow change request, feasibility study, risk analysis and activity timing plan according to
8.3 ASES report Documented to be prepared as per process for design change Anil (design) 7/5/2021 Open
evidenced for any design change. procedure. Implemebt the same for latest changes.
Trial report, Before / after comparison interms of quality and productivity is not Perform trial part inspection, before / after comparison for process capability, rejection ratio, change intend, cycle time
8.3 ASES report Backup data of trail report and before / after comparision to be prepared Anil (design) 7/5/2021 Open
presented for any design change. etc., according to the procedure and keep the record.
8.3 ASES report Change approval (Customer PSW) is not presented for any design change Change approval (Customer PSW) evidenced to be recollected & stored. customer approval to be taken Anil (design) 7/5/2021 Open
8.3 ASES report Design change progress tracking sheet is not presented for any design change. Obtain the internal / Customer approval and keep the record of change implementation cut off details. Design change tracking sheet to be prepared Anil (design) 7/5/2021 Open
Add each 4M change into change tracking sheet to monitor the status of each
8.3 ASES report Add each product change into change tracking sheet to monitor the status of each steps. 4M change tracking sheet Aditya, Surjeet & Vinod 7/5/2021 Open
steps
Open 14
Close 0
Total 14
000000Confidential C
#
# Chapter 8: Change Management 5 Supplier Name Function Date
Question ASES report Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Status Internal Status
% Action Implemented 0%
000000Confidential C
#
# Chapter 9: Sub-suppliers management 3 Supplier Name Function Date
Question Phenomenon Requirement from RNTBCI (From ASES report) Actions from supplier Pilot Target Date Actual Date Status
Timeline for some key activities is not addressed in the sub supplier quality
9.4 ASES report concerns handling procedure. Ex. Sub supplier Define timeline for each activities involved for sub supplier quality concerns handling. Timelines to be defined in procedure Gaurav 6/17/2021 Open
communication for quality issues, Containment actions etc.,
8D report or similar (root cause analysis / action plan) is not available for some
sub supplier concerns reported from Assembly shop.
9.4 ASES report Receive and validate the 8D or similar for all sub supplier concerns to ensure robust actions implementation 8D report to be taken for all sub supplier issues Dalbir 6/17/2021 Open
Ex. Part: ARM hood hinge, Defect: Dimension NG 9.2 +/-0.5mm, actual:
10.5mm, Qty: 200 nos. Month: Mar20.
Root cause analysis is not done using Quality tools like Ishikawa, Cause
verification / validation, Why why analysis etc., Ex.Part: Educate the sub supplier to conduct depth root case analysis using Brainstorming, Ishikawa, Cause validation /
9.4 ASES report Proper analysis to be for done by suppliers Dalbir 7/6/2021 Open
Tube 12x0.75x675mm, Concern: Crack, Supplier: Technico strips & tubes, verification or similar method to find out root causes and initiate concrete countermeasure.
Defect date: 07-07-2020, Qty: 50 nos.
QPIS Monitoring sheet not in detail Main 8D steps status are like containment
QPIS monitoring sheet to be revised considering input as Tartget Vs actual for containment, action plan
9.4 ASES report actions, action plan receipt, action implementation etc Add missing key 8D steps into QPIS Monitoring sheet with timeline to track the status. Dalbir 7/6/2021 Open
receiot, action implementation etc.
is not captured.
8D progress is not monitored through tracking sheet for some sub supplier
9.4 ASES report concerns. Ex. Part: ARM hood hinge, Defect: Dimension Add all sub supplier concerns into QPIS monitoring sheet and monitor the status of 8D steps closure as per time line All the concerns to be adedd in tracking sheet Dalbir 7/6/2021 Open
NG 9.2 +/-0.5mm, actual: 10.5mm, Qty: 200 nos. Month: Mar20.
Open 6
Close 0
Total 6
% Action Implemented 0%