印度海德堡达莫余热发电工程概算子项目录

Summary Bill Sheet of Civil Work for the India Heidelberg Damoh WHR PJ

序号 子 项 名 称 价格
No. Subitem Name Price
汽轮机房
1
Steam Turbine Building
直接空冷系统
2 Air Cooled Condenser System
辅机设备冷却塔及水池
3 Cooling Tower and Pond
一线AQC锅炉糸统
4
AQC Boiler System of Line 1
二线AQC锅炉糸统
5
AQC Boiler System of Line 2
三线AQC锅炉糸统
6
AQC Boiler System of Line 3
一线PH 锅炉糸统
7
PH Boiler System of Line 1
二线线PH 锅炉糸统
8
PH Boiler System of Line 2
三线K列PH 锅炉糸统
9-1
K-string PH Boiler System of line 3
三线C列PH 锅炉糸统
9-2
C-string PH Boiler System of line 3
室外汽水管线
10
Outdoor Steam and Water Pipe
电气照明,防雷接地,给排水
11
Lighting, grounding for lightening,water supply and drainage
总图.道路.排水.电缆沟或隧道
12
General Layout, Road, sewerage, cable channel or tunnel
总价
13
Total
Remarks: All the construction material, machines, tools, auxiliary material and others should be included in the quota
海德堡达莫余热发电工程概算子项目录
of Civil Work for the India Heidelberg Damoh WHR PJ

备注
Remarks

machines, tools, auxiliary material and others should be included in the quota
1. 单项工程名称:汽轮机房
Subitem Name: Steam Turbine Building
暂估数量
序号 项 目 名 称 计量单位 Estimate 单价 总价
No. Item Name Unit Unit Price Total Price
Quantity
一,土方工程
Earthwork
场地平整
1 Ground leveling m2 1001.81

机械土方(不装车)
2 m3 426.99
Earthwork by Mechnial ( No truck,loading)
机械土方(装车.运1KM)
3 m3 1366.76
Earthwork by Mechnial( truck, loading,transport 1km)
机械人工土方 (10%)
4 m3 213.5
Earthwork by manual (10%)
就地回填
5 Earth Backfill situ m3 491.04

运土回填
6 Earth Backfill by Truck transport m3 1712.52

机械石方
7 Stonework by Mechnial m3 272.07

石方外运
8 m3 272.07
Stone transport by truck
二,砖砌体,脚手架部分
Brickwork,scaffold

砖基础
1 Brick foundation m3 56.00

砌多孔砖墙(含用手架)
2 Perforated brick wall (Includinig scaffold) m3 468

砖砌台阶(含水泥砂浆粉面)
3 Brick entrance step (including cement plaster) m3 1.32

砖砌化粪池.排水井等(含粉面)
4 Brick anaerobic tank, drainage shaft etc.(including m3 2.48
plaster)
砌体小计:
5 Brickwork sub-total: 527.80

浆砌块石
6 Stone blocks with cement mortar m3 45.69

砌体拉结筋
7 masonry steel t 0.98

装饰脚手架
8 Scaffold for decoration m2 1545.60

满堂脚手架
9 m2 420.50
All-round Scaffold
三 砼.钢筋砼部分
Concrete, Reinforced Concrete
素砼
Plain concrete
砼垫层(C10砼)
1 m3 33.76
Concrete underlayer (C10 concrete)
细石砼二次灌浆(C35砼)
2 Fine stones Concrete for secondary grouting ( C35 m3 7.31
concrete)
钢筋砼 Reinforced Concrete

砼独立基础(C30砼)
3 m3 88.59
Concrete isolated foundation (C30 concrete)

砼满堂基础(C30砼)
4 m3 111.82
Concrete mat foundation (C30 concrete)

砼设备基础(C30砼)
5 m3 63.13
Concrete equipment foundation (C30 concrete)

钢筋砼框架柱(C30砼)
6 m3 229.58
Reinforced concrete frame column (C30 concrete)
钢筋砼构造柱(C30砼)
7 Reinforced concrete constructional column (C30 m3 4.94
concrete)

现浇砼基础梁(C30砼)
8 m3 23.93
Reinforced concrete foundation beam (C30 concrete)

钢筋砼单梁、连系梁、框架梁
9 Reinforced concrete single beam, continous beam, m3 110.23
frame beam (C30 concrete)

过梁(C30砼)
10 m3 8.89
Lintel (C30 concrete)
圈梁(C30砼)
11 m3 9.27
Bond beam (C30 concrete)
砼有梁板(C30砼)
12 m3 231.38
Reinforced concrete beam and slab(C30 concrete)
钢筋砼顶(C30砼)
13 m3 5.19
Reinforced concrete top(C30 concrete)
地坑,池,底、壁(C30砼)
14 m3 10.63
Pit, pond, base, wall (C30 concrete)
钢筋砼墙(C30砼)
15 m3 21.62
Reinforced concrete wall (C30 concrete)
钢筋砼吊车梁(C40砼)
16 m3 16.00
Reinforced concrete crane beam (C40 concrete)
耐酸砼(中和池)
17 Acid-resisting concrete m3 14.20

钢筋砼小计:
Reinforced concrete sub-total: 949.40

雨篷(C30砼)
18 m2 9.90
Awning (C30 concrete)
钢筋砼楼梯
19 Reinforced concrete ladder m2 39.23

砼坡道
20 Concrete rampway m2 32.00

砼散水
21 Concrete apron m2 93.11

模板
22 m2 6239.03
Formwork
现浇砼钢筋
23 Reinforced bar of situ Reinforced concrete t 168.96

四,金属及埋件
Metal and built-in fitting
铁件(螺栓)制作、安装
1 Iron part( bolt) fabricate and erection t 9.28

钢结构制作,安装
2 Steel Structure fabricate and erection t 58.93

3mm厚排水天沟
3 t 1.512
3mm thick gutter
钢格栅
4 Steel grille m2 39.25

0.6厚彩钢板屋面(彩钢夹心板)
5 m2 524
0.6mmColor-steel and 100mm sandwich plate roofing
不锈钢栏杆
6 Stainless steel handrail m2 26.54

五.装饰.门 窗.地面及天棚等
Decorations,doors, windows, floor and ceiling,etc.
干铺碎石垫层
1 m3 67.92
Broken stone hardcore

砼地坪(底层,加浆抹光)
2 Concrete terrace(Ground floor,concrete trowel finish ) m2 556.45

水泥砂浆楼地面(二层)
3 Cement mortar floor( first floor) m2 300.68

水泥砂浆粉外墙
4 m2 2010.57
Plaster external wall with Cement mortar
混合砂浆粉内墙
5 Plaster internal wall with Cement mortar and lime m2 3271.21

内墙涂料(含天蓬)
6 m2 4380.55
Internal wall coating
外墙涂料
7 External wall coating m2 2229.32

地砖楼地面(三楼)
8 m2 568.59
Tiles floor (Second floor)
楼梯贴防滑地砖
9 Ladder tiling ship-and-galley tiles m2 55.61

化水车间地面贴耐酸地砖
10 Demineralizer room floor tiling Acid-resistant m2 79.48

化水车间墙面贴耐酸地砖
11 Demineralizer room wall tiling Acid-resistant m2 57.88

卫生间内墙贴墙面砖
12 Toilet tiling tiles m2 47.82

1:3水泥砂浆找层(屋面)
13 m2 247.17
1:3 Cement mortar screed (Roofing)
隔热保温层(屋面)
14 Heat insulation lyer(Roofing) m2 201.18

SBS卷材防水(屋面)
15 m2 247.17
SBS modifying asphalt water proof (Roofing)
细石砼保护层(屋面)
16 Fine stone concrete protection layer(Roofing) m3 247.17

卫生间地面防水
17 Toilet floor waterproof m2 27.16

PVC雨水管(¢110)
18 m 80.70
PVC rain water pipe(¢110)
室内砼排水沟,加盖板
19 Indoor concrete drainage ditch with capping plate m 124.60

化水钢筋砼排水沟
20 Demineralizer reinfored concrete drainage ditch m 22.00

化水排水沟塑钢盖板
21 Demineralizer drainage ditch with plastic capping plate m 24.00

PVC塑钢门、窗
22 m2 263.34
PVC doors, windows
PVC塑钢百页窗
23 m2 57.60
PVC shutters
PVC固定无框玻窗(C-4)
24 m2 10.8
PVC fixed nonframe glass windows
C4—大理石窗台板(厚20mm)
25 m2 1.728
C4- marble window board
卫生间隔断(成品安装)
26 Toilet partition wall m2 22.68

小便斗隔板(成品安装) 块
27 Urinal dummy plate Piece 3.00

防火门
28 Fire door m2 9.99

密封门(发电机下)
29 Sealing Door( Under generator) m2 1.89

钢大门
30 Steel Door m2 21.06
门窗小计:
Doors and windows sub-total: 392.09

PVC板天棚面板
31 m2 26.04
PVC ceiling plate
矿棉板天棚
32 Mineral wool celing plate m2 115.98

小 计 Total:
说明: 1,本预算参照泉头金桥汽机房施工图进行编制。独立柱基-2.50m,汽岛基础-3.50m计算±0下工程量。
2,层高按3.40~3.80,7.00~7.60,12.0m,15.3m。桁车梁底标高按13.15,沿高按19.36计算±0上程量。
3,本预算仅供参考,备料使用。详情见本工程施工图后重新编制。
备 注
Remarks

±0.00下-1.5计算
Caulate from -1.5 under
±0.00
±0.00上(沿口H按19.3计)

纯,原水箱基础
Foundation of Demin.an raw
water tank

柱基按-2.5m计算

汽岛按-3.5m计算
(汽岛墙)

(0.743m3)

(9.32m3)

砼8.32m3,碎石2.24m3
Concrete8.32m3,broken
stone 2.24m3
砼7.52m3,碎石8.6m3
Concrete7.52m3,broken
stone 8.6m3

屋架.檩条.支撑.平台等
Roof truss,sommer beam,
support, flatform

(100厚)
(thickness 100)

(材质由业主定)

底层150厚C25砼
C25 Concrete thickness 150
(设备基础周边)

300*400

400*500=9.60㎡

(12厚钢化玻璃)
Thickness 12 ferro-glass

立柱基-2.50m,汽岛基础-3.50m计算±0下工程量。
。桁车梁底标高按13.15,沿高按19.36计算±0上程量。
图后重新编制。
2. 单项工程名称:直接空冷系统
Subitem Name: Air Cooled Condenser System

暂估数量
序号 项 目 名 称 计量单位 Estimate 单价 总价
No. Item Name Unit Unit Price Total Price
Quantity
一,土方工程
Earthwork
机械土方(装车.运1KM)
1
Earthwork by Mechnial Car loading,transport 1km)
m3 4493.83

人工土方 (10%)
2
Earthwork by manual (10%)
m3 479.31

就地回填
3 Earth Backfill situ m3 479.31

运土回填
4 Earth Backfill by Truck transport m3 3717.56

二 砼.钢筋砼部分
Concrete, Reinforced Concrete
素砼
Plain concrete
砂石垫层(C10砼)
1 m3 15.62
Sand-gravel underlayer (C10 concrete)
细石砼二次灌浆(C35砼)
2 Fine stones Concrete for secondary grouting ( C35 m3 3.28
concrete)
钢筋砼 Reinforced Concrete

砼钢筋柱基础(C30砼)
3
Concrete reinforced column foundation (C30 concrete)
m3 65.250

砼设备基础(C30砼)
4
Concrete equipment foundation (C30 concrete)
m3 38.110

现浇砼基础梁(C30砼)
5 m3 176.48
Reinforced concrete foundation beam (C30 concrete)

钢筋砼框架柱(C30砼)
6
Reinforced concrete frame column (C30 concrete)
m3 348.000

钢筋砼单梁、连系梁、框架梁
7 Reinforced concrete single beam, continous beam, m3 158.832
frame beam (C30 concrete)
砼有梁板(C30砼)
8
Reinforced concrete beam and slab(C30 concrete)
m3 265.220

钢筋砼小计:
Reinforced concrete sub-total: 1051.892

现浇砼钢筋
13 Reinforced bar of situ Reinforced concrete t 187.570

模板
14 Formwork m2 6999.890

三,金属及埋件
Metal and built-in fitting
铁件(螺栓)制作、安装
1 Iron part( bolt) fabricate and erection t 2.247

钢结构制作,安装
2 Steel Structure fabricate and erection t 5.937

钢梯栏杆制作,安装
3 Steel ladder and handrail fabricate and erection t 15.420

金属工程小计:
4
Metal work sub-total: t 23.604

四.地面工程
Ground work
干铺碎石垫层
1 Broken stone hardcore m3 199.680

砼地坪(底层,加浆抹光)
2 Concrete terrace(concrete trowel finish ) m2 266.240

20.0m平面3cm细石砼面层
2 m2 680.930
20.m Floor 3cm fine stone concrete surface
小 计 Total:
说明: 1,本概算参照包头冀东水泥有限公司余热发电空冷器做法及方案图:L=42.92m,B=22.78m,H=20.00m进行编制。
实际工程量应以施工图为准。 2012.09.15编制
System

备 注
Remarks

150厚C25砼
C25 Concrete
thickness 150
热发电空冷器做法及方案图:L=42.92m,B=22.78m,H=20.00m进行编制。
2012.09.15编制
3. 单项工程名称:辅机冷却塔及水池
Subitem Name: Aux. Cooling Tower and Pond

暂估数量
序号 项 目 名 称 计量单位 Estimate 单价 总价 备 注
No. Item Name Unit Unit Price Total Price Remarks
Quantity
一,土方工程
Earthwork
机械土方(不装车)
1 Earthwork by Mechnial ( No car loading) m3 0.00

机械土方(装车.运1KM)
2 Earthwork by Mechnial Car loading,transport m3 183.41
1km)
人工土方 (10%)
3
Earthwork by manual (10%)
m3 20.38

运土回填
4 Earth Backfill by Truck transport m3 81.81

就地回填
5 Earth Backfill situ m3 20.38

二 砼.钢筋砼部分
Concrete, Reinforced Concrete
素砼
Plain concrete
砂石垫层(C10砼)
1 m3 14.00
Sand-gravel underlayer (C10 concrete)
砼地坪
2 Concrete terrace m3 9.52

细石砼二次灌浆(C35砼)
3 Fine stones Concrete for secondary grouting m3 0.53
( C35 concrete)
钢筋砼 Reinforced Concrete
砼独立基础(C30砼)
3
Concrete isolated foundation (C30 concrete)
m3 7.73

砼设备基础(C30砼)
4
Concrete equipment foundation (C30 concrete)
m3 5.42

钢筋砼池底(C30砼)
5 Reinforced concrete pond bottom base(C30 m3 70.46
concrete)
钢筋砼池壁(C30砼)
6 Reinforced concrete pond wall(C30 m3 36.09
concrete)
池壁上内挑沿(C30砼)
7 m3 0.47
Cornice on the pond wall(C30 concrete)
钢筋砼框架柱(C30砼)
8 Reinforced concrete frame column (C30 m3 16.26
concrete)
钢筋砼单梁、连系梁、框架梁
9 Reinforced concrete single beam, continous m3 29.66
beam, frame beam (C30 concrete)
砼有梁板(C30砼)
10 Reinforced concrete beam and slab(C30 m3 23.16
concrete)
150厚钢筋砼墙(C30砼)
11 Thickness 150 reinforced concrete wall m3 27.22
(C30 concrete)
120厚钢筋砼导流板(C30砼)
12 Thickness 120 reinforced concrete guide m3 1.47
plate(C30 concrete)
钢筋砼小计:
Reinforced concrete sub-total: 217.96

现浇砼钢筋
13 Reinforced bar of situ Reinforced concrete t 36.29

模板
14 Formwork m2 1344.10

三,装饰,及地面,脚手架
Decorations, ground and scaffold,etc.
水泥砂浆粉外墙
1 Cement mortar plaster external wall m2 321.20
外墙涂料
2 External wall coating m2 338.97

塔内壁防腐
3 m2 838.38
Cooling tower inwall anticorrosion
干铺碎石垫层
4 Broken stone hardcore m3 10.19

砖砌排水沟及井
5 m3 0.65
Brick drainage ditch an shaft
水泥砂浆粉水沟及井
6 Plaster Brick drainage ditch and shaft with m2 4.09
Cement mortar
外脚手架 15m内,粉及刷涂
7 m3 363.10
External scaffolding 料
内装饰架
8 m2 364.97 刷防腐剂用
Internal scaffolding
四,金属及埋件
Metal and built-in fitting
铁件(螺栓)制作、安装
1 Iron part( bolt) fabricate and erection t 0.32

钢结构制作,安装
2 Steel Structure fabricate and erection t 4.14

钢梯栏杆制作,安装
3 Steel ladder and handrail fabricate and erection t 0.77

金属工程小计:
4 t 5.23
Metal work sub-total:
0.6mm厚屋面彩板瓦安装
5 06mm Color-steel sandwich plate for m2 63.98
roofing

小 计 Total:
说明: 本预算参照湖北钟夏冷却塔施工图进行编制…….
4. 单项工程名程:一线AQC锅炉糸统
Subitem Name: AQC boiler system of Line 1
暂估数量
序号 项 目 名 称 计量单位 Estimate 单价 总价
No. Item Name Unit Unit Price Total Price
Quantity
一,土方工程
机械土方(不装车)
1 Earthwork by Mechnial ( No truck,loading) m3 252.480

机械土方(装车.运1KM)
2 m3 883.690
Earthwork by Mechnial( truck, loading,transport 1km)
人工土方 (10%)
3 m3 162.240
Earthwork by manual (10%)
就地回填
4 Earth Backfill situ m3 252.480

运土回填
5 Earth Backfill by car transport m3 864.730

二 砼.钢筋砼部分
Concrete, Reinforced Concrete
素砼
Plain concrete
砼垫层(C10砼)
1 m3 14.180
Concrete underlayer (C10 concrete)
细石砼二次灌浆(C35砼)
2 Fine stones Concrete for secondary grouting ( C35 m3 3.276
concrete)
钢筋砼 Reinforced Concrete
砼独立基础(C30砼)
3 m3 55.630
Concrete isolated foundation (C30 concrete)
砼设备基础(C30砼)
4 m3 4.450
Concrete equipment foundation (C30 concrete)
钢筋砼框架柱(C30砼)
5 m3 43.640
Reinforced concrete frame column (C30 concrete)
现浇砼基础梁(C30砼)
6 m3 7.843
Reinforced concrete foundation beam (C30 concrete)
钢筋砼单梁、连系梁、框架梁
7 Reinforced concrete single beam, continous beam, frame m3 10.130
beam (C30 concrete)
砼有梁板(C30砼)
8 m3 31.900
Reinforced concrete beam and slab(C30 concrete)
钢筋砼小计:
Reinforced concrete sub-total: 153.593

模板
9 Formwork m2 1535.930

现浇砼钢筋
10 Reinforced bar of situ Reinforced concrete t 27.642

三,金属及埋件
Metal and built-in fitting
铁件(螺栓)制作、安装
1 Iron part( bolt) fabricate and erection t 1.243

钢梯栏杆制作,安装
2 Steel ladder and handrail fabricate and erection t 1.605

四.地面工程
Ground work
干铺碎石垫层
1 Broken stone hardcore m3 34.650

砼地坪(底层,加浆抹光)
2 m2 346.520
Concrete terrace(concrete trowel finish )

砖砌排水井
3 m3 0.360
Brick drainage shaft
排水井粉水泥砂浆
4 Plaster Brick drainage shaft with Cement mortar m2 1.960

小 计 Total:
说明:1,未注明事项请参照汽机房有关说明。
备 注
Remarks

柱基按-2.5m计算

柱顶高按15.2计算

150厚C25砼
C25 Concrete
thickness 150
5. 单项工程名程:二线AQC锅炉糸统
Subitem Name: AQC boiler system of Line 2
暂估数量 总价
序号 项 目 名 称 计量单位 Estimate 单价 Total 备 注
No. Item Name Unit Unit Price Remarks
Quantity Price
一,土方工程
机械土方(不装车)
1 Earthwork by Mechnial ( No truck,loading) m3 252.480

机械土方(装车.运1KM)
2 m3 883.690
Earthwork by Mechnial( truck, loading,transport 1km)
人工土方 (10%)
3 m3 162.240
Earthwork by manual (10%)
就地回填
4 Earth Backfill situ m3 252.480

运土回填
5 Earth Backfill by car transport m3 864.730

二 砼.钢筋砼部分
Concrete, Reinforced Concrete
素砼
Plain concrete
砼垫层(C10砼)
1 m3 14.180
Concrete underlayer (C10 concrete)
细石砼二次灌浆(C35砼)
2 Fine stones Concrete for secondary grouting ( C35 m3 3.276
concrete)
钢筋砼 Reinforced Concrete
砼独立基础(C30砼)
3 m3 55.630 柱基按-2.5m计算
Concrete isolated foundation (C30 concrete)
砼设备基础(C30砼)
4 m3 4.450
Concrete equipment foundation (C30 concrete)
钢筋砼框架柱(C30砼)
5 m3 43.640 柱顶高按15.2计算
Reinforced concrete frame column (C30 concrete)
现浇砼基础梁(C30砼)
6 m3 7.843
Reinforced concrete foundation beam (C30 concrete)
钢筋砼单梁、连系梁、框架梁
7 Reinforced concrete single beam, continous beam, m3 10.130
frame beam (C30 concrete)
砼有梁板(C30砼)
8 m3 31.900
Reinforced concrete beam and slab(C30 concrete)
钢筋砼小计:
Reinforced concrete sub-total: 153.593

模板
9 Formwork m2 1535.930

现浇砼钢筋
10 Reinforced bar of situ Reinforced concrete t 27.642

三,金属及埋件
Metal and built-in fitting
铁件(螺栓)制作、安装
1 Iron part( bolt) fabricate and erection t 1.243

钢梯栏杆制作,安装
2 Steel ladder and handrail fabricate and erection t 1.605

四.地面工程
Ground work
干铺碎石垫层
1 Broken stone hardcore m3 34.650

150厚C25砼
砼地坪(底层,加浆抹光)
2 m2 346.520 C25 Concrete
Concrete terrace(concrete trowel finish )
thickness 150
砖砌排水井
3 m3 0.360
Brick drainage shaft
排水井粉水泥砂浆
4 Plaster Brick drainage shaft with Cement mortar m2 1.960

小 计 Total:
说明:1,未注明事项请参照汽机房有关说明。
6. 单项工程名程:三线线AQC锅炉糸统
Subitem Name: AQC boiler system of Line 3
暂估数量 总价
序号 项 目 名 称 计量单位 Estimate 单价 Total 备 注
No. Item Name Unit Unit Price Remarks
Quantity Price
一,土方工程
机械土方(不装车)
1 Earthwork by Mechnial ( No truck,loading) m3 93.750

机械土方(装车.运1KM)
2 m3 838.000
Earthwork by Mechnial( truck, loading,transport 1km)
人工土方 (10%)
3 m3 93.750
Earthwork by manual (10%)
就地回填
4 Earth Backfill situ m3 93.750

运土回填
5 Earth Backfill by car transport m3 662.360

二 砼.钢筋砼部分
Concrete, Reinforced Concrete
素砼
Plain concrete
砼垫层(C10砼)
1 m3 7.780
Concrete underlayer (C10 concrete)
细石砼二次灌浆(C35砼)
2 Fine stones Concrete for secondary grouting ( C35 m3 1.640
concrete)
钢筋砼 Reinforced Concrete
砼独立基础(C30砼)
3 m3 75.220 柱基按-2.5m计算
Concrete isolated foundation (C30 concrete)
砼设备基础(C30砼)
4 m3 6.450
Concrete equipment foundation (C30 concrete)
钢筋砼框架柱(C30砼)
5 m3 46.974 柱顶高按15.2计算
Reinforced concrete frame column (C30 concrete)
现浇砼基础梁(C30砼)
6 m3 24.000
Reinforced concrete foundation beam (C30 concrete)
钢筋砼单梁、连系梁、框架梁
7 Reinforced concrete single beam, continous beam, m3 9.763
frame beam (C30 concrete)
砼有梁板(C30砼)
8 m3 43.235
Reinforced concrete beam and slab(C30 concrete)
钢筋砼小计:
Reinforced concrete sub-total: 205.642

模板
9 Formwork m2 1142.600

现浇砼钢筋
10 Reinforced bar of situ Reinforced concrete t 29.216

三,金属及埋件
Metal and built-in fitting
铁件(螺栓)制作、安装
1 Iron part( bolt) fabricate and erection t 1.243

钢梯栏杆制作,安装
2 Steel ladder and handrail fabricate and erection t 1.605

四.地面工程
Ground work
干铺碎石垫层
1 Broken stone hardcore m3 39.420

150厚C25砼
砼地坪(底层,加浆抹光)
2 m2 372.700 C25 Concrete
Concrete terrace(concrete trowel finish )
thickness 150
砖砌排水井
3 m3 0.360
Brick drainage shaft
排水井粉水泥砂浆
4 Plaster Brick drainage shaft with Cement mortar m2 3.660

小 计 Total:
说明:1,未注明事项请参照汽机房有关说明。
7. 单项工程名称:一线PH 锅炉糸统
Subitem Name: PH Boiler system of line1
暂估数量
序号 项 目 名 称 计量单位 Estimate 单价 总价
No. Item Name Unit Unit Price Total Price
Quantity
一,土方工程
Earthwork
机械土方(不装车)
1 Earthwork by Mechnial ( No truck,loading) m3 32.260

机械土方(装车.运1KM)
2 m3 290.320
Earthwork by Mechnial( truck, loading,transport 1km)
人工土方 (10%)
3 m3 32.260
Earthwork by manual (10%)
就地回填
4 Earth Backfill situ m3 32.260

运土回填
5 Earth Backfill by car transport m3 246.400

三 砼.钢筋砼部分
Concrete, Reinforced Concrete
素砼
Plain concrete
砼垫层(C10砼)
1 m3 8.860
Concrete underlayer (C10 concrete)
细石砼二次灌浆(C35砼)
2 Fine stones Concrete for secondary grouting ( C35 m3 1.860
concrete)
钢筋砼 Reinforced Concrete
砼独立基础(C30砼)
3 m3 8.050
Concrete isolated foundation (C30 concrete)
砼设备基础(C30砼)
4 m3 7.350
Concrete equipment foundation (C30 concrete)
钢筋砼框架柱(C30砼)
5 m3 30.680
Reinforced concrete frame column (C30 concrete)

现浇砼基础梁(C30砼)
6 m3 6.290
Reinforced concrete foundation beam (C30 concrete)

钢筋砼单梁、连系梁、框架梁
7 Reinforced concrete single beam, continous beam, m3 7.860
frame beam (C30 concrete)
砼有梁板(C30砼)
8 m3 6.280
Reinforced concrete beam and slab(C30 concrete)
地坑,池,底、壁(C30砼)
9 m3 0.291
Pit, pond, base, wall (C30 concrete)
钢筋砼小计:
Reinforced Concrete sub-total: 120.783

模板
10 m2 406.090
Formwork
现浇砼钢筋
11 Reinforced bar of situ Reinforced concrete t 17.260

四,金属及埋件
Metal and built-in fitting
铁件(螺栓)制作、安装
1 Iron part( bolt) fabricate and erection t 1.040

钢梯栏杆制作,安装
2 Steel ladder and handrail fabricate and erection t 0.860

五.装饰.门 窗.地面及天棚等
Decorations,doors, windows, floor and ceiling,etc.
干铺碎石垫层
1 Broken stone hardcore m3 7.000

砼地坪(底层,加浆抹光)
2 Concrete terrace(concrete trowel finish ) m2 70.000

小 计 Total:
说明:1,未注明事项请参照汽机房有关说明。
备 注
Remarks

150厚C25砼
C25 Concrete
thickness 150

明。
8 单项工程名称:二线PH 锅炉糸统
Subitem Name: PH Boiler system of Line 2
暂估数量
序号 项 目 名 称 计量单位 Estimate 单价 总价
No. Item Name Unit Unit Price Total Price
Quantity
一,土方工程
Earthwork
机械土方(不装车)
1 Earthwork by Mechnial ( No truck,loading) m3 120.860

机械土方(装车.运1KM)
2 m3 423.010
Earthwork by Mechnial( truck, loading,transport 1km)
人工土方 (10%)
3 m3 60.430
Earthwork by manual (10%)
就地回填
4 Earth Backfill situ m3 120.860

运土回填
5 Earth Backfill by car transport m3 410.480

三 砼.钢筋砼部分
Concrete, Reinforced Concrete
素砼
Plain concrete
砼垫层(C10砼)
1 m3 6.414
Concrete underlayer (C10 concrete)
细石砼二次灌浆(C35砼)
2 Fine stones Concrete for secondary grouting ( C35 m3 0.224
concrete)
钢筋砼 Reinforced Concrete
砼独立基础(C30砼)
3 m3 8.050
Concrete isolated foundation (C30 concrete)
砼设备基础(C30砼)
4 m3 11.580
Concrete equipment foundation (C30 concrete)
钢筋砼框架柱(C30砼)
5 m3 24.332
Reinforced concrete frame column (C30 concrete)

现浇砼基础梁(C30砼)
6 m3 6.864
Reinforced concrete foundation beam (C30 concrete)

钢筋砼单梁、连系梁、框架梁
7 Reinforced concrete single beam, continous beam, m3 6.864
frame beam (C30 concrete)
砼有梁板(C30砼)
8 m3 1.793
Reinforced concrete beam and slab(C30 concrete)
地坑,池,底、壁(C30砼)
9 m3 0.291
Pit, pond, base, wall (C30 concrete)
钢筋砼小计:
Reinforced Concrete sub-total: 120.783

模板
10 m2 478.192
Formwork
现浇砼钢筋
11 Reinforced bar of situ Reinforced concrete t 12.220

四,金属及埋件
Metal and built-in fitting
铁件(螺栓)制作、安装
1 Iron part( bolt) fabricate and erection t 1.243

钢梯栏杆制作,安装
2 Steel ladder and handrail fabricate and erection t 0.970

五.装饰.门 窗.地面及天棚等
Decorations,doors, windows, floor and ceiling,etc.
干铺碎石垫层
1 Broken stone hardcore m3 10.420

砼地坪(底层,加浆抹光)
2 Concrete terrace(concrete trowel finish ) m2 104.420

小 计 Total:
说明:1,未注明事项请参照汽机房有关说明。
备 注
Remarks

7.49

150厚C25砼
C25 Concrete
thickness 150

明。
9-1. 单项工程名称:三线K列PH 锅炉糸统
Subitem Name: K-string PH Boiler system of line 3
暂估数量
序号 项 目 名 称 计量单位 Estimate 单价 总价
No. Item Name Unit Unit Price Total Price
Quantity
一,土方工程
Earthwork
机械土方(不装车)
1 Earthwork by Mechnial ( No truck,loading) m3 120.860

机械土方(装车.运1KM)
2 m3 423.010
Earthwork by Mechnial( truck, loading,transport 1km)
人工土方 (10%)
3 m3 60.430
Earthwork by manual (10%)
就地回填
4 Earth Backfill situ m3 120.860

运土回填
5 Earth Backfill by car transport m3 410.480

三 砼.钢筋砼部分
Concrete, Reinforced Concrete
素砼
Plain concrete
砼垫层(C10砼)
1 m3 6.414
Concrete underlayer (C10 concrete)
细石砼二次灌浆(C35砼)
2 Fine stones Concrete for secondary grouting ( C35 m3 0.224
concrete)
钢筋砼 Reinforced Concrete
砼独立基础(C30砼)
3 m3 8.050
Concrete isolated foundation (C30 concrete)
砼设备基础(C30砼)
4 m3 11.580
Concrete equipment foundation (C30 concrete)
钢筋砼框架柱(C30砼)
5 m3 24.332
Reinforced concrete frame column (C30 concrete)
现浇砼基础梁(C30砼)
6 m3 6.864
Reinforced concrete foundation beam (C30 concrete)
钢筋砼单梁、连系梁、框架梁
7 Reinforced concrete single beam, continous beam, m3 6.864
frame beam (C30 concrete)
砼有梁板(C30砼)
8 m3 1.793
Reinforced concrete beam and slab(C30 concrete)
地坑,池,底、壁(C30砼)
9 m3 0.291
Pit, pond, base, wall (C30 concrete)
钢筋砼小计:
Reinforced Concrete sub-total: 120.783

模板
10 Formwork m2 478.192

现浇砼钢筋
11 Reinforced bar of situ Reinforced concrete t 12.220

四,金属及埋件
Metal and built-in fitting
铁件(螺栓)制作、安装
1 Iron part( bolt) fabricate and erection t 1.243

钢梯栏杆制作,安装
2 Steel ladder and handrail fabricate and erection t 0.970

五.装饰.门 窗.地面及天棚等
Decorations,doors, windows, floor and ceiling,etc.
干铺碎石垫层
1 Broken stone hardcore m3 10.420

砼地坪(底层,加浆抹光)
2 Concrete terrace(concrete trowel finish ) m2 104.420

小 计 Total:
说明:1,未注明事项请参照汽机房有关说明。
ine 3

备 注
Remarks

7.49

150厚C25砼
C25 Concrete
thickness 150
9-2. 单项工程名称:三线C列PH 锅炉糸统
Subitem Name: C-string PH Boiler system of line 3
暂估数量
序号 项 目 名 称 计量单位 Estimate 单价 总价
No. Item Name Unit Unit Price Total Price
Quantity
一,土方工程
Earthwork
机械土方(不装车)
1 Earthwork by Mechnial ( No truck,loading) m3 120.860

机械土方(装车.运1KM)
2 m3 423.010
Earthwork by Mechnial( truck, loading,transport 1km)
人工土方 (10%)
3 m3 60.430
Earthwork by manual (10%)
就地回填
4 Earth Backfill situ m3 120.860

运土回填
5 Earth Backfill by car transport m3 410.480

三 砼.钢筋砼部分
Concrete, Reinforced Concrete
素砼
Plain concrete
砼垫层(C10砼)
1 m3 6.414
Concrete underlayer (C10 concrete)
细石砼二次灌浆(C35砼)
2 Fine stones Concrete for secondary grouting ( C35 m3 0.224
concrete)
钢筋砼 Reinforced Concrete
砼独立基础(C30砼)
3 m3 8.050
Concrete isolated foundation (C30 concrete)
砼设备基础(C30砼)
4 m3 11.580
Concrete equipment foundation (C30 concrete)
钢筋砼框架柱(C30砼)
5 m3 24.332
Reinforced concrete frame column (C30 concrete)
现浇砼基础梁(C30砼)
6 m3 6.864
Reinforced concrete foundation beam (C30 concrete)
钢筋砼单梁、连系梁、框架梁
7 Reinforced concrete single beam, continous beam, m3 6.864
frame beam (C30 concrete)
砼有梁板(C30砼)
8 m3 1.793
Reinforced concrete beam and slab(C30 concrete)
地坑,池,底、壁(C30砼)
9 m3 0.291
Pit, pond, base, wall (C30 concrete)
钢筋砼小计:
Reinforced Concrete sub-total: 120.783

模板
10 Formwork m2 478.192

现浇砼钢筋
11 Reinforced bar of situ Reinforced concrete t 12.220

四,金属及埋件
Metal and built-in fitting
铁件(螺栓)制作、安装
1 Iron part( bolt) fabricate and erection t 1.243

钢梯栏杆制作,安装
2 Steel ladder and handrail fabricate and erection t 0.970

五.装饰.门 窗.地面及天棚等
Decorations,doors, windows, floor and ceiling,etc.
干铺碎石垫层
1 Broken stone hardcore m3 10.420

砼地坪(底层,加浆抹光)
2 Concrete terrace(concrete trowel finish ) m2 104.420

小 计 Total:
说明:1,未注明事项请参照汽机房有关说明。
line 3

备 注
Remarks

7.49

150厚C25砼
C25 Concrete
thickness 150


10. 单项工程名称:室外汽水管线
Subitem Name: Outdoor steam and water pipe

计量单 暂估数量
序号 项 目 名 称 位 Estimate 单价 总价 备 注
No. Item Name Unit Price Total Price Remarks
Unit Quantity
一,土方工程
Earthwork

人工凿砼地坪 4㎡
1 m3 63.00 *42=168*0.25=42.0m
Chisel concrete by manual
3*1.5
石方外运
2 m3 63.00
Stone transport

机械土方(装车.运1KM)
3 m3 306.63 5.4m3*42=226.8
Earthwork by Mechnial Car loading,transport 1km)

人工土方 (10%)
4 m3 34.02
Earthwork by manual (10%)

运土回填
5 Earth Backfill by car transport m3 306.63

二、 砼.钢筋砼部分
Concrete, Reinforced Concrete
素砼
Plain concrete

砼垫层(C10砼)
6 m3 16.80 4*0.4*42
Concrete underlayer (C10 concrete)

细石砼二次灌浆(C35砼)
7 Fine stones Concrete for secondary grouting ( C35 m3 1.01
concrete)

钢筋砼 Reinforced Concrete

砼柱基础(C30砼)
8 m3 100.80
Concrete column foundation( C30 concrete)

基础上小柱(C30砼)
9 m3 14.75
Concrete column( C30 concrete)
钢筋砼小计:
Reinforced concrete sub-total: 115.55

模板
10 Formwork m2 362.00

现浇砼钢筋
11 Reinforced bar of situ Reinforced concrete t 14.38

三,金属及埋件
Metal and built-in fitting
铁件(螺栓)制作、安装
12 Iron part( bolt) fabricate and erection t 2.21

植筋: ¢16 根
13 piece 182.00
planting reinforcement bar

14 ¢18
piece 212.00


15 ¢20 piece 192.00


16 ¢22 piece 196.00

四,地面恢复
Concrete ground
地面恢复 (C30砼)
17 ㎡ 288.00
Concrete ground( C30 concrete)
干铺碎石垫层
18 Broken stone hardcore m3 43.20
小 计
说明:1,未注明事项请参照汽机房有关说明。
11. 单项工程名称; 电气照明,防雷接地,给排水卫生洁具,消防
Lighting, grounding for lightening,water supply and drainage
暂估数量
序号 项 目 名 称 计量单位 Estimate 单价 总价 备 注
No. Item Name Unit Unit Price Total Price Remarks
Quantity
一,电气照明,防雷接地
Lighting, grounding for lightening
照明灯安装(含工厂灯,日光灯,吸顶灯,白织
灯等综合灯具).
Lighting lamp ( inluding plant lamp, 盏
1 Cup 248.00
fluorescence lamp, overhead
lamp,incandescent lamp and other lamp)
防雷接地(汽机房,综合)
Grounding for lightening( Steam turbine 糸统
2 system 1.00
building)
防雷接地(冷却塔,综合) 糸统
3 Grounding for lightening( cooling tower) system 1.00

防雷接地(AQC,综合) 糸统
4 system 1.00
Grounding for lightening( AQC boiler)

防雷接地(PH×2,综合) 糸统
5 system 2.00
Grounding for lightening( (A) and (B) PH boiler)

6 接地连接(与厂区连网) 处 5.00
Ground connection with the plant groundiing sysytem

二,给排水卫生洁具
Water supply and drainge,sanitary ware
蹲式大便器安装(综合配套) 套
1 W.C.closet erection set 4.00

挂斗式小便器安装(综合配套) 套
2 Wall-hung urinal urinal erection set 2.00

洗脸盆安装(含台板支架,冷热水龙头等,综合
) 套
3 Washbasin erection( including bedplate and set 2.00
support, cock)
拖布盆安装(成品盆,配套综合) 套
4 Mop tub erection set 2.00

成品地漏安装(综合配套) 套
5 floor drain set 4.00

面镜安装 (底处理,边框等综合) 套
6 Mirror set 2.00

镀锌给水管: DN15
7 m 6.00 短管用
Galvanized water supply pile
镀锌给水管: DN20
8 m 12.00 引人管,水平
Galvanized water supply pile
镀锌给水管: DN25
9 m 32.00 支管
Galvanized water supply pile
镀锌给水管: DN32 主竖向管(井至顶层
10 m 22.00 )
Galvanized water supply pile
镀锌给水管: DN50
11 m 50.00 外接入水源主管
Galvanized water supply pile
DN50钢制闸阀安装(丝扣接头) 套
12 set 1.00
DN50 steel gate valve (Screw)
DN50钢制闸阀安装(法兰连接) 套
13 set 1.00
DN50 steel gate valve (Flange)
DN32钢制闸阀安装(丝扣接头) 套
14 set 2.00
DN32 steel gate valve (Screw)
DN25钢制闸阀安装(丝扣接头) 套
15 set 2.00
DN25 steel gate valve (Screw)
DN20钢制闸阀安装(丝扣接头) 套
16 set 1.00
DN20 steel gate valve (Screw)
排水管道安装(含管件)UPVC¢50
17 m 15.00 地漏及小便池立管
Drainge water pipe (include pipe fittings)
排水管道安装(含管件)UPVC¢70
18 m 18.00 小横管
Drainge water pipe (include pipe fittings)
排水管道安装(含管件)UPVC¢110
19 m 38.00 横管及竖向管
Drainge water pipe (include pipe fittings)
排水管道安装(含管件)UPVC¢150
20 m 8.00 化粪池导管
Drainge water pipe (include pipe fittings)
三,消防 Fire Fighting
成品消防栓安装(室内,配套) 套 含箱,水管,水枪综
1 Fire hydrant erection set 6.00 合
消防给水管道安装: DN80
2 m 120.00 量估
Fire fighting water pipe
DN80钢制闸阀 (焊接接头) 套
3 set 2.00 连接处
DN80 steel gate valve (welding)
DN80钢制闸阀 (法兰连接) 套
4 set 1.00 闸伐井
DN80 steel gate valve (flange)
砖砌消防管道井1200*1200 座
5 seat 2.00 接入,输送
Brick fire fighting pipe shaft
砖砌进水闸阀井700*700 座
6 seat 2.00 接入,输送
Brick water inlet gate valve shaft
砖砌窨井 600*600 座
7 seat 2.00
Brick shaft
砖砌窨井 700*700 座
8 seat 1.00 化粪池出水
Brick shaft
消防给水连接处凿除砼
9 Chisel concrete m3 8.00

砼碴外运
10 Transport Concrete after Chisel m3 8.00

消防给水土方开挖
11 Earth excavation m3 112.00 暂按112m

土方回填
12 Earth backfill m3 112.00

砼地面恢复(H=0.25)
13 ㎡ 32.00
Concrete ground
合计: total:
说明:1,未注明事项请参照汽机房有关说明。2,工程量参照相似子项编制。
12. 单项工程名称; 总图:道路,雨排水,电缆沟(或电缆隧道)
Subitem Name: General layout, road, rain water drainage, cable channel( or cable tunnel)

暂估数量
序号 项 目 名 称 计量单位 Estimate 单价 总价 备 注
No. Item Name Unit Unit Price Total Price Remarks
Quantity
一,场区道路
Road
挖路槽土方 (槽深按0.80计
1 Road excavation ㎡ 1490.00
=1192m3)
路槽土方外运
2 m3 1192.00
Transport after Road excavation
土方回填 (按一边填土一边排
3 Earth backfill m3 64.80 水沟)
路基毛石垫层 (H按0.30计算
4 Road underlayer with rubble stone ㎡ 1374.00
=412.2m3)
路基碎石垫层 (H按0.10计算
5 Road underlayer with broken stone ㎡ 1374.00
=137.4m3)
道路面层(C30砼) (H按0.25计算
6 ㎡ 1320.00
Road surface course (C30 concrete) =330.00m3)

二,路边排水沟
Drainage ditch
挖排水沟土方 150+120=270+28=298
1 m3 468.63
Earth excavation m
挖排水沟土方外运
2 Tansport earth m3 420.95

挖排水沟土方回填
3 m3 47.68
Earth backfill
C15砼排水沟底
4 m3 51.27
Bottom base of pitch (C15 concrete)
砖砌排水沟
5 Brick drainage ditch m3 111.27

1:2.5水泥砂浆粉水沟底
6 1:2.5 plaster ditch bottom base with cement ㎡ 718.41
mortar
¢250砼管安装
7 m 28.00 汽及冷横穿砼路用
¢250 Concrete pipe

三,电缆沟(或隧道)
cable channel( or cable tunnel)
电缆沟土方开挖
1 Earth excavation m3 343.20

电缆沟土方外运
2 m3 242.50
Tansport earth
电缆沟土方回填
3 Earth backfill m3 100.70

C10砼垫层
4 m3 19.20
C10 concrete underlayer
C30钢筋砼电沟(底,壁)
5 C30 Reinforced concrete cable m3 91.20
channel( bottom base and wall)
电沟盖板制作
6 m3 26.88
Fabricate Capping plate of cable channel
电沟盖板安装
7 Erection Capping plate of cable channel m3 26.88

砼内钢筋制作.安装
8 t 12.939
Reinforced bar fabricate and erection
模板制作安装
9 Formwork m2 1331.870

预埋件(制作、安装)
10 Built-in fitting fabricate and erection t 0.528

电缆支架制作安装
11 Cable support fabricate and erection t 1.494

四,地面恢复
Concrete Ground
接口处凿除砼
12 m3 23.40
Chisel concrete
砼碴外运
13 Transport after Chisel concrete m3 23.40

砼地面恢复(C25砼,H=0.25)
14 ㎡ 52.00
Concrete ground
碎石垫层
15 m3 10.40
Concrete underlayer

合计:
说明:1,未注明事项请参照汽机房有关说明。2,工程量参照相似子项编制。