The planning process of most projects can be iterative and thereby Data Center IT Capacity expensive. Data center projects are burdened with these challenges and can 175 kW benefit greatly from simplification and time savings. vings. Schneider Electric’s data Adaptable from 50 kW to 525 kW center reference designs help customers optimize the planning process by providing them with validated, proven, and documented data center physical Target Availability infrastructure designs. The use of these designs has a positive impact on not Tier 3 just the project itself, but also on the performance, reliability, and efficiency of the data center over its lifetime. Annualized PUE at 100% Load 1.76 in Beijing, China 1.74 in Paris, France Reference Design 11 includes design information for three spaces: IT space, 1.98 in Singapore facility power, and facility cooling. Combined together, her, they comprise the integrated power, cooling and structural systems required to meet the design’s specifications published in this overview document. Total Racks and Average Density 62 racks at 2.8 kW/rack