Professional Documents
Culture Documents
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
Concrete Forming
Supply, fabrication , installation, stripping and/or leaving formwork
with the actual surface in contact with the concrete, including
provision of block-outs, chamfered edges, notching and overlaps,
necessary greasing or coating with form oil, all necessary hardware,
scaffolding, shoring and staging, all fixing accessories, use of plant,
tools and equipment, and all necessary items to complete the works.
Structural Concrete
Supply and delivery and placing of concrete including necessary
grouting, vibrating, hammering, tamping, consolidating, curing,
hardening, wetting, sealing, brooming and scratching, protecting,
sampling, all fixing accessories, use of plant, tools and equipment,
and all necessary items to complete the works.
2.1 CHB 6" - Non Load Bearing ( Bond Beam Included ) m2 6,592.02 780.00 165.00 945.00 6,229,460.91
included in
2.2 Reinforcement bars CHB and Bond Beam ( GMQ - OSM) kgs 25,111.28 OSM - -
item 2.1
2.3 Tool Joint Finish m2 13,184.04 35.00 55.00 90.00 1,186,563.98
2.4 Tie wire rolls 85.00 1,750.00 - 1,750.00 148,750.00
TO COLLECTION 24,071,200.08
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
TO COLLECTION 485,211.91
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
1.0 EARTHWORK
Soil Treatment
Soil treatment for termite control for all areas and surfaces in
contact with the ground.
TO COLLECTION 4,106,494.70
Unit Rate
Item Description Unit Quantity Amount
Materials Labor Total
Site Office
Site Warehouse
Worker's Bunkhouse
Temporary electrical line and consumption
temporary waterline and consumption
TO COLLECTION 2,570,453.15