You are on page 1of 47

MASTER DATA FOR

ROADS FOR THE YEAR 2015-16


Name of Work :: "A.M to Guthpa village to NH-16 (Via) Ramchandrapally road from Km 0/0 to 3/7 in Nizamabad
(It is linked throughout Estimate district Year 2018-19"
)

Hyper Link Rates Rates


CONVEYANCE & RATES OF MATERIALS S.No Specification in Brief to DATA Exact Rounded
01.09.2018 1 2 5 3 4
Date (mm/dd/yy)
of Preparation of Estimate 01.09.2018 V. VENKATA NARAYANA 9440818440, 07799139399, vvnhighways.blogspot.in
Details Amount Leads EARTH WORKS FOR ROADS
Embankment Earth 73.58 5.00 1 Forming embankment with Side Earth PAGE_70 113.40 113.00
HMP 62.58 4.00 2 Forming embankment with Borrowed Soils 1000 m Lead PAGE_68 142.26 142.00
Crusher 62.58 4.00 3 Forming embankment with Borrowed Soils 5 KM Lead PAGE_68 128.77 129.00
Metal/ Stone Qry 62.58 4.00 4 E/W for Trench cutting PAGE_50 78.63 79.00
Gravel 73.58 5.00 5 Removal of soils by Mechanical means & carting 1000 M PAGE_58 17.41 17.00
Sand 598.16 57.00 6 Removal of soils by Manual Means & carting 1000 M PAGE_48 141.26 141.00
Hume Pipes Varies with pipe dia. 0.00 GRANULAR BASES and SUB BASES
BITUMEN Rates 7 Granular Sub-base with Grade I (Table 400 -1) type material PAGE_94 1380.79 1381.00
LEAD 692.00 8 Granular Sub-base with Grade II (Table 400 -1) type material-NEW PAGE _94 1378.65 1379.00
Grade 80/100 34644.80 9 Granular Sub-base with Grade III (Table 400 -1) type material PAGE_95 1218.75 1219.00
Grade 60/70 35588.80 10 Granular Sub-base with Grade I (Table 400-2) type material PAGE_95 1398.07 1398.00
CRMB 55 Grade 0.00 11 Granular Sub-base with Grade II (Table 400-2) type material PAGE_96 1436.05 1436.00
Emulsion (MS) 30919.00 12 Granular Sub-base with Grade III (Table 400-2) type material PAGE_96 1246.94 1247.00
CEMENT / STEEL Rates 13 Granular Sub-base with Grading - VI of MoRT&H (EinC) EinC 1410.17 1410.00
CEMENT 4750.00 14 Scarifying the existing granular surface PAGE_67 16.29 16.00
HYSD Steel 47000.00 15 Scarifying the existing BT surface PAGE_67 5.28 5.00
6 mm Mild Steel 44000.00 16 Wet Mix Macadam PAGE_110 1646.07 1646.00
MS STEEL 43000.00 BITUMINOUS SUB BASES, BASES and SURFACING
ALLOWANCES 17 Single coat surface dressing with VG 10 grade Bitumen PAGE_141 42.51 43.00
Place ITEM Name Value 18 Prime Coat with BT Emulsion (MS) PAGE_123 28.48 28.00
DATA Labour Municipal Area Allowance 0.00 % 19 Tack Coat with BT Emulsion (MS) PAGE_124 9.22 9.00
RMR Metal % 20 Tack Coat with BT VG 10 Grade APRDC 10.50 10.00
RMR Gravel % 21 Dense Graded Bituminous Macadam with BT VG 30 Grade PAGE_132 7151.12 7151.00
RMR Sand % 22 Dense Graded Bituminous Macadam with BT VG 30 Grade (NEW) PAGE_132 7128.48 7128.00
Overhead Charges ( R) 5.00 % 23 Bituminous Concrete with BT VG 30 Grade PAGE_138 8124.10 8124.00
Overhead Charges ( B) 5.00 % 24 Bituminous Concrete with BT VG 30 Grade (NEW-Batch Mix)(VRR) PAGE_138 8109.24 8109.00
Contractors Profit 10.00 % 25 Bituminous Concrete with BT VG 30 Grade (NEW-Batch Mix)(PnRR) PAGE_138 8597.39 8597.00
VAT 12.00 % 26 Gravel Shoulders PAGE_95 345.03 345.00
Centering Charges Local Entry % C.C. BASE COURSE and WEARING COARSE
27 VCC(1:4:8) Base course below CC Pavement PAGE_331 3266.01 3266.00
28 VCC(1:3:6) Base course below CC Pavement PAGE_331 3639.07 3639.00
29 VCC M35 for C.C. Pavement PAGE_345 5278.79 5279.00
CULVERTS, BRIDGES Foundations, Substructures & Superstructure
30 EW for Foundation of Structures by Mechanical Means PAGE_323 27.52 28.00
31 EW for Foundation of Structures by Manual Means PAGE_321 131.30 131.00
32 Granular Bedding Below Pipes PAGE_462 527.27 527.00
33 VCC (1:3:6) for Foundations PAGE_331 3639.07 3639.00
34 VCC(1:3:6) for Body Walls PAGE_455 4002.98 4003.00
35 Cost and Conveyance of 600 mm Dia Hume pipes to Site SSR600 2509.64 2510.00
36 Cost, conveyance and Laying of 600 Dia Hume Pipes PAGE_272 3007.07 3007.00
37 Cost and Conveyance of 800 mm Dia Hume pipes to Site SSR800 4259.35 4259.00
38 Cost, conveyance and Laying of 800 Dia Hume Pipes PAGE_272 5058.00 5058.00
39 Cost and Conveyance of 1000 mm Dia Hume pipes to Site SSR1000 6807.43 6807.00
40 Cost, conveyance and Laying of 1000 Dia Hume Pipes PAGE_272 8001.03 8001.00
41 Cost and Conveyance of 1200 mm Dia Hume pipes to Site SSR1200 9381.29 9381.00
42 Cost, conveyance and Laying of 1200 Dia Hume Pipes PAGE_272 11052.00 11052.00
43 Filling between Body walls with Gravel PAGE_462 527.27 527.00
44 Rough Stone Revetment with 300 mm HBG Stone PAGE_522 802.82 803.00
45 Filter Material with Gravel underneath Pitching PAGE_523 737.36 737.00
46 VCC M15 Grade CC with 40 mm metal for Raft Foundation PAGE_335 4257.86 4258.00
47 VCC M15 Grade CC with 40 mm metal for Sub Structure PAGE_335 4503.51 4504.00
48 VCC M20 Grade CC with 40 mm metal for Raft Foundation PAGE_336 4719.52 4720.00
49 VCC M20Grade CC with 40 mm metal for Sub Structure PAGE_336 4719.52 4720.00
50 VRCC M20 Grade CC for Bed blocks & Backing walls PAGE_472 5123.50 5123.00
51 VRCC M20 Grade CC with 20 mm metal for Deck Slab PAGE_472 5589.27 5589.00
52 VRCC M30 Grade CC with 20 mm metal for Wearing Coat PAGE_477 5094.88 5095.00
53 VRCC M25 Grade CC with 20 mm metal for Approach Slab PAGE_501 5097.83 5098.00
54 VRCC M20 Grade CC with 12 mm metal for Railing PAGE_472 295.91 296.00
-- DO -- -- DO -- PAGE_472 273.77 274.00
55 VCC M15 Grade CC with 40 mm metal for leveling course PAGE_500 4094.10 4094.00
56 Grouted Revetment with 300 mm HBG stone + CC(1:4:8) PAGE_522 1430.32 1430.00
57 Back filling behind Abutments with gravel PAGE_462 527.27 527.00
58 Providing and laying of filter media using 150 mm IRC stone PAGE_463 923.19 923.00
59 Providing HYSD ( Fe-415 ) for Super structure of R.C.C items. PAGE_489 61980.53 61981.00
60 Providing HYSD ( Fe-415 ) for Sub structure of R.C.C items. PAGE_490 60811.67 60812.00
61 Providing HYSD ( Fe-415 ) for Foundation of R.C.C items. PAGE_448 60658.29 60658.00
62 Providing MS ( Fe-250 ) for all RCC Items PAGE_460 56576.06 56576.00
MISCELLANEOUS ITEMS
63 Sand filling in foundation PAGE_422 1806.40 1806.00
64 Providing 100 mm dia AC Weep holes in VCC Abutment PAGE_461 71.66 72.00
65 VCC M 15 Grade CC using 40 - 10 mm metal for Dividers PAGE_455 4257.86 4258.00
66 VRCC M 20 Grade for Cover Slabs over Side Drains PAGE_472 4844.03 4844.00
67 Plastering in CM(1:5) 12 mm thick ( Rate per 10 sqm ) PAGE_452 86.68 87.00
68 Painting two coats to new plastered surface PAGE_220 73.96 74.00
69 Providing BT Patch work using 40 mm metal & BT 80/100 EinC 3799.18 3799.00
70 Providing BT Patch work using 9.5 to11.2mm metal & BT 80/100 EinC 5050.81 5051.00
71 RR Masonry in CM(1:3) for Foundation. PAGE_334 3203.23 3203.00
72 RR Masonry in CM(1:3) for Substructure PAGE_453 3178.58 3179.00
73 Dismantling culverts & bridges in CC M15- M20 PAGE_23 593.23 593.00
74 Dismantling culverts & bridges in Ruble Masonry in CM Temp 328.62 329.00
75 25.4 mm Mastic pad for Longitudinal & Transversal Expansion joints EinC 991.00 991.00
76 12.7 mm Mastic pad for Transversal Contraction joints. EinC 568.00 568.00
77 Hot Applied Thermoplastic Compound Page_225 760.07 760.00
OLD ITEMS
78 WBM Gr II with MC metal 22.4 mm & below and PRR PAGE_104 1425.47 1425.00
79 WBM Gr III with MC metal 22.4 mm & below and PRR PAGE_104 1644.51 1645.00
80 WBM Gr II with MC metal 45 mm & below and PRR PAGE_104 1509.05 1509.00
81 WBM Gr III with MC metal 45 mm & below and PRR PAGE_104 1793.48 1793.00
82 WBM Gr II with MC metal 22.4 mm & below and VRR PAGR_104 1432.21 1432.00
83 WBM Gr III with MC metal 22.4 mm & below and VRR PAGE_104 1651.25 1651.00
84 WBM Gr II with MC metal 45 mm & below and VRR PAGE_104 1515.79 1516.00
85 WBM Gr III with MC metal 45 mm & below and VRR PAGE_104 1800.22 1800.00
86 Mix seal 20 mm with BT VG 30 Grade PAGE_146 138.61 139.00
87 Mix seal 25 mm with BT VG 30 Grade NABARD 138.61 139.00
88 Mix seal 25 mm with BT CRMB NABARD 139.00 139.00
89 Macadam 50 mm with BT VG 10 Grade PAGE_125 6254.15 6254.00
90 Macadam 50 mm with BT VG 30 Grade PAGE_125 6240.03 6240.00
91 Macadam 50 mm with BT VG 30 Grade (NEW- Batch Mix Plant) PAGE_125 5858.44 5858.00
92 SDBC 25 mm with BT VG 30 Grade PAGE_135 8269.93 8270.00
93 Single coat surface dressing with VG 30 grade Bitumen PAGE_141 43.33 43.00
94 Bituminous Concrete with BT CRMB 55 Grade PAGE_138 3281.88 3282.00
95 VCC(1:3:6) Base course with FLY ASH & Sand PAGE_331 3402.08 3402.00
96 VCC M35 for C.C. Pavement with FLY ASH & Sand PAGE_345 4870.34 4870.00
97 Built-up-spray grout layer 75 mm thick with BT 80/100 Grade PAGE_130 167.47 167.00
98 Penetration macadam 50 mm thick PAGE_128 234.95 235.00
99 Penetration macadam 75 mm thick PAGE_129 323.22 323.00
100 Open-graded premix carpet of 20 mm thick with 80/100 BT PAGE_5_23 159.27 159.00
101 Providing and laying type B seal coat simultaneously with 80/100 BT PAGE_5_39 60.61 61.00
102 Patch work 50 - 70 mm depth using 40-10 mm metal & 80/100 BT EinC 316.66 317.00
103 Patch work 25 - 35 mm depth using 25-10 mm metal & 80/100 BT EinC 178.31 178.00
104 Patch work 15 - 25 mm depth using 12-10 mm metal & 80/100 BT EinC 114.20 114.00

V. VENKATA NARAYANA 9440818440, 07799139399, vvnhighways.blogspot.in


PREPARED on 25-09-2015
GOVERNMENT OF
TELANGANA

ROADS & BUILDINGS


DEPARTMENT
HYDERABAD - INDIA

"A.M to Guthpa village to NH-16 (Via) Ramchandrapally


road from Km 0/0 to 3/7 in Nizamabad district Year 2018-
19"

AMOUNT OF ESTIMATE
Rs 200000.00

(R&B) Circle :: NIZAMABAD


(R&B) Division :: NIZAMABAD
SPECIFICATION REPORT

"A.M to Guthpa village to NH-16 (Via) Ramchandrapally road from Km 0/0 to 3/7
in Nizamabad district Year 2018-19"
Amount of Estimate : Rs. 200000.00

The Guthpa village to NH-16 (Via) Ramchandrapally road from Km 0/0 to 3/7 is an
importanent ZP Taken over Single Lane road .

The maintenance estimate is prepared for an amount of Rs. 128000/. Duly incorporating
the following provisions as per the guide lines of the Executive Engineer (R&B) Division, Nizamabad.

1 Providing B.T patch work for pot holes of 70 mm above depth using 40mm HBG metal
2 Providing B.T patch work for pot holes of 50-70 mm depth using 40mm HBG metal
3 Providing B.T patch work for pot holes of 25-35 mm depth using 20-25mm HBG metal
4 Providing B.T patch work for pot holes of 15-25 mm depth using 20-25mm HBG metal
5 Providing and laying of Wet Mix Macadam
6 Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps
5 Supply and fixing of H.M stones
6 Supply and fixing of K.M stones
7 Manufacturing supplying and fixing of H.M. stones of size 900x225x150 mm
8 Manufacturing supplying and fixing of K.M. stones of size 1110x400x150 mm
9 Stripping the excess soil from the shoulder surface to achieve the approved level for sectioning the berms, shoulders as
10 Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and compac
11 Forming shoulders with borrowed useful earth from outside road boundary having MDD not less t
12 CRS Masonry 2 nd sort in C.M (1:6) Prop using HBG stone.
13 CC(1:2:4) mix Prop. Using 20mm HBG metal.
14 Plastering 12mm thick in C.M (1:2) to exposed faces of CRS.
15 White washing two coats with best shell lime.
16 Providing and supplying of labour for making rain gullies
17 Providing and Engaging Front end roller 1 Cum capacity for removal of fallen trees, enchroach
18 Providing and fixing Village name board size 600x800 mm made out of Type – XI of ASTMD
19 Providing and fixing Cautionary / Warning sign boards size 900 mm equilateral triangle
20 Providing and fixing Mandatiory / Regulatory sign boards size 600 mm circular
21 Provision for GST @ 12%
22 Provision for Seigniorage charges
23 Provision for NAC @ 0.10%
24 L.S for other unforeseen items, variation in quantities rates and rounding off.

The rates in the estimate are worked out as per the common SSR 2018-19 applicable to all
Engineering Departments of Telangana.

Early approval to the estimate is solicited.

Asst.Executive Engineer Dy. Executive Engineer Executive Engineer


R&B Section,Makloor R&B Sub-Division-Armoor R&B Division.Nizamabad
DETAILED CUM ABSTRACT ESTIMATE
Name of Work ::- "A.M to Guthpa village to NH-16 (Via) Ramchandrapally road from Km 0/0 to
3/7 in Nizamabad district Year 2018-19"
Classification of the Road :- ZPTR

Rate per KM vide GO.Rt.No 139 T(R&B)(R


Surface Type Length (km ) Amount (Rs.)
I) Dept., Dated 06.12.2014

WBM/ Earthen 0.000 12000.000 0


BT Single Lane 3.700 24000.000 88800
BT Intermediate Lane 27000.000 0
BT Double Lane 30000.000 0
Total Length (km) 3.700 Eligible Amount (Rs) 88800
MEASUREMENTS
Sno Description Quantity Rate Per Amount
No L B D
1 2 3 4 5 6 7 8 9 10
1 Providing BT patch work for pot holes of depth ranging from 70mm and above, using 40mm HBG/HBT
metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42
kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer
using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the
loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack
coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand
,including cost of all materials ,T&P and labour charges for all operations etc., complete.

In km. 0/0 to 3/700 20.00

(Broken edges, pot holes


or say 20.00 sqm 316.70 1sqm 6334.00
and road cuttings)
2 Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT metal
with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 42 kgs/1Cum
of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer using 10-
12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including removal of the loose
material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat
,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand
,including cost of all materials ,T&P and labour charges for all operations etc., complete.

In km. 0/0 to 3/700 100.00

(Broken edges, pot holes


or say 100.00 sqm 274.10 1sqm 27410.00
and road cuttings)

3 Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm HBG/HBT
metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at 72
kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick layer
using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum., including removal of the
loose material in the pot holes ,trimming the edges to provide firm vertical faces ,cleaning ,applying tack
coat ,filling the pot holes to compacting and finishing and blinding the surface using stone dust/sand
,including cost of all materials ,T&P and labour charges for all operations etc., complete.

In km. 0/0 to 3/700 150.00

(Broken edges, pot holes


or say 150.00 sqm 178.30 1sqm 26745.00
and road cuttings)
4 Providing BT patch work for pot holes of depth ranging from 15 to 25 mm ,using 10-12mm HBG/HBT
metal and VG 10 grade bitumen at 80 kgs/1Cum of work for filling the pot holes and sealing the filled up
pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /
1Cum., including removal of the loose material in the pot holes ,trimming the edges to provide firm
vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding
the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all
operations etc., complete.

In km. 0/0 to 3/700 100.00

(Broken edges, pot holes


or say 100.00 sqm 114.20 1sqm 11420.00
and road cuttings)
5 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix
macadam specification including cost, (excluding seigniorage) of all materials and including premixing
the material with water at OMC in Mechanical mix plant carriage of mixed material by tipper to site ,
laying in uniform layers with paver in base courses on well prepared surface and compacting with
Vibratory roller to achieve the desired density etc., as directed by the Engineer-in-Charge and as per
MoRT&H specification.406 (5th revision) for finished item of work. (Payment will be made based on
levels for finished item of work)

In km. 0/0 to 3/700 10.00


or say 10.00 cum 1646.00 1cum 16460.00
6 Clearing Juliflora (Prosafis) jungle including up-rooting and removing of Juliflora stumps including all
labour charges etc., complete for finished item of work.
In km. 0/0 to 3/700 1 x 2 1000.00 1.50 - 3000.00
Deduct for gaps @ 40% -1200.00
or say 1800.00 sqm 3.50 1sqm 6300.00
7 Manufacturing supplying and fixing of H.M. stones of size 900x225x150 mm made with VRCC M15
Grade using 2.445kgs of steel duly excavated pit of size 0.525x0.45x0.60 mts. Using 40mm metal,
providing in CC Bed (1:4:8) prop., of size 0.525x0.45x0.60 mts. fixing in RCC Collor of size 0.45mt. dia
and 0.15mt. height made with RCC including painting 3 coats ( 1 coat of cement enamel paint & 2 coats
of synthetic Enamel paint), numbering with synthetic Enamel paint of approved colour including cost and
conveynce of all materials, seignorage charges and labour charges for curing and steel fabrication etc.,
complete as per standard specification, drawings & as directed by the Engineer- in-charge for finished
item of work.

In km. 0/0 to 3/700 1 x 1.0 2.00 - 2.00


or say 2.00 sqm 1044.00 1sqm 2088.00
8 Manufacturing supplying and fixing of K.M. stones of size 1110x400x150 mm made with VRCC M15
Grade using 3.843kgs of steel duly excavated pit of size 0.70x0.45x0.60 mts. using 40mm metal,
providing in CC Bed (1:3:6) prop., of size 0.70x0.45x0.60 mts. fixing in RCC Collor of size 0.60mt. dia
and 0.15mt. height made with RCC including painting 3 coats (1 coat of cement enamel paint & 2 coats
of synthetic Enamel paint), numbering with synthetic Enamel paint of approved colour including cost and
conveynce of all materials, seignorage charges and labour charges for curing and steel fabrication etc.,
complete as per standard specification, drawings & as directed by the Engineer- in-charge for finished
item of work.

In km. 0/0 to 3/700 1 x 1 2.00 - 2.00


or say 2.00 sqm 1786.00 1sqm 3572.00
9 Stripping the excess soil from the shoulder surface to achieve the approved level for sectioning the
berms, shoulders as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO.
Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005)

In km. 0/0 to 3/700 1 x 2 1000.00 1.00 - 2000.00


or say 2000.00 sqm 11.10 1sqm 22200.00
10 Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved
soil and compacting with appropriate equipment as per MORT&H specification No.3003 (As per E-in-C
Circular Memo NO. Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005)

In km. 0/0 to 3/700 1 x 1 200.00 1.00 - 200.00


or say 200.00 sqm 29.00 1sqm 5800.00
11 Forming shoulders with borrowed useful earth from outside road boundary having MDD not less than
1.75 gm/cc by mechanical means up to SDR with all leads and lifts including pre - watering of soil at
borrow area, removal of top soil, excavation of solis at borrowed area, convayance of soil, depositing the
soil on the shoulders, spreading soil, breaking clods, sectioning, grading and consolidation with Hand
roller to FMC including all hire and operational charges of T&P and (excluding seigniorage) charges,
complete for finished item of work

In km. 0/0 to 3/700 1 x 1 100.00 1.00 0.15 15.00


or say 15.00 cum 129.00 1cum 1935.00
12 CRS masonry 2nd sort in CM (1:6) prop by using HBG stones including cost and conveyance of all
materials and labour charges ,all leads and lifts, curing and all other T&P charges etc. complete

In km. 0/0 to 3/700 1 x 1 2.00 1.00 1 2.00


(damaged culverts)
or say 2.00 cum 3860.40 1cum 7720.80
13 CC (1:2:4) mix prop using 20mm IRC HBG metal including cost and conveyance of all materials and all
labour charges ,curing, etc., for coping on the retaining wall.

In km. 0/0 to 3/700 1 x 1 2.00 0.45 0.075 0.07

(damaged culverts)

or say 0.07 cum 5749.80 1cum 388.11


14 Plastering 12 mm thick in CM(1:5) to exposed part of CRS masonry including cost and conveyance of
all materials and labour charges for curing etc. complete for finished item of work.

In km. 0/0 to 3/700 1 x 1 75.00 - 1 75


(damaged culverts)

or say 75.00 Sqm 155.50 1Sqm 11662.50

15 White washing two coats with best shell lime after thoroughly brushing the surface to remove all dirt
and remain of loose including all taxes, cost and conveyance of all materials to site and all labour
charges for mixing paint, application, curing scaffolding charges lift charges etc., complete for finished
item of work.

In km. 0/0 to 3/700 1 x 1 100.00 - 1.00 100

or say 100.00 Sqm 21.70 1Sqm 2170.00

16 Providing and supplying of labour for making rain gullies and clearing culverts vents during rainy
season as per the instructions of Engineer-in-Charge.
In km. 0/0 to 3/700 1 x 0 - - - 2.00

or say 2.00 Nos 425.00 Each 850.00

17 Providing and Engaging Front end roller/JCB 1 Cum capacity for removal of fallen trees,
enchroachments etc., for unscattered work in emergency for complete finished item of work as per the
instructions of Engineer-in-Charge.(SSR 2014-15 Page N0 22)

In km. 0/0 to 3/700 1 x 0 - - - 0.00

or say 1.00 Hrs 1843.52 Each 1843.52


18 Providing and fixing Village name board size 600x800 mm made out of Type – XI of ASTMD
4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming to
IRC 67:2012 for full background of Green Colour & White Letters and fixed over 3MM
Alluminium Composite Material sheet having minimum 0.30mm thick Aluminium skin on both
sides with back side painted grey colour and fixed over back support frame of M.S angle
25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size
75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the
board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic
enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly
fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size
450x450x600mm including cost and conveyance of all materials ,equipment, machinery and
labour with all leads and lift, loading charges necessary for satisfactory completion of the work
as directed by Engineer –in-Charge.

Speed limit and curve boards


7432.00
1 Nos 7432.00 Each
19 Providing and fixing Cautionary / Warning sign boards size 900 mm equilateral triangle made
out of Type – XI of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective
sheeting and confirming to IRC 67:2012 for full background of White colour and letters/logos
done by screen printing in Black colour, boarders by screen printing in Red colour and fixed over
4MM Aluminium Composite Material sheet having minimum 0.5 mm thick Aluminium skin on
both sides with back side painted grey colour and fixed over back support frame of M.S angle
25x25x3mm all round and fixing with 35x35x4mm and mounted on a MS angle post of size
75x75x6mm with clear height of not less than 2.1 m from the ground level to the bottom of the
board. The signpost should be painted with one coat of red oxide paint and 2 coats of synthetic
enamel paint Black and White colour with bands of 30cm of height. The signpost shall be firmly
fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size
450x450x600mm including cost and conveyance of all materials ,equipment, machinery and
labour with all leads and lift, loading chages necessary for satisfactory completion of the work as
directed by Engineer -in-Charge.

Speed limit and curve boards


6226.00
1 Nos 6226.00 Each
20 Providing and fixing Mandatiory / Regulatory sign boards size 600 mm circular made out of Type – XI
of ASTMD 4956-09 wide angle cube cornered micro Prismatic Retro reflective sheeting and confirming
to IRC 67:2012 for full background of White colour and letters/logos done by screen printing in Black
colour, boarders by screen printing in Red colour and fixed over 3MM Aluminium Composite Material
sheet having minimum 0.3 mm thick Aluminium skin on both sides with back side painted grey colour
and fixed over back support frame of M.S angle 25x25x3mm all round and fixing with 35x35x4mm and
mounted on a MS angle post of size 75x75x6mm with clear height of not less than 2.1 m from the ground
level to the bottom of the board. The signpost should be painted with one coat of red oxide paint and 2
coats of synthetic enamel paint Black and White colour with bands of 30cm of height. The signpost shall
be firmly fixed with MS base angle 35x35x4 mm in to the ground by M-15 Concrete foundation of size
450x450x600mm including cost and conveyance of all materials ,equipment, machinery and labour with
all leads and lift, loading charges necessary for satisfactory completion of the work as directed by
Engineer -in-Charge.(E.I.C.circular memo roads signages/DCE(R)/EE-II/DEE-7/AEE(NLG)/2013-14
DATED.15.05.2013.

Speed limit and curve boards 1 Nos 5169.00 Each 5169.00


PART-A Total :- 173725.93
Part " B "
21 LS amount towards GST @ 12% 173726 @ 12.00% Rs: 20847.00
22 LS amount towards Seigniorage charges 3545.00
23 LS amount towards NAC .10% 173726 @ 0.10% Rs: 174.00
24 L.S for other unforeseen items,Xerox, Stationery and rounding off. Rs: 1708.00
Total Amount Rs. 200000

Asst.Executive Engineer Dy. Executive Engineer Executive Engineer (R&B)


R&B Section,Makloor R&B Sub-Division-Armoor Division.Nizamabad
Name of Work :- "A.M to Guthpa village to NH-16 (Via) Ramchandrapally road from Km 0/0 to 3/7 in Nizamabad district Year 2018-19"

SEIGNIORAGE CHARGES
Earth/ Gravel Metal/ Stone Sand
S.No Specification in Brief Unit Quantity cum cum cum
Factor Quantity Factor Quantity Factor Quantity
1 2 3 4 5 6 7 8 9 10

1 Patch work 70 mm and above depth 1 sqm 20.00 0.091 1.81


2 Patch work 50 - 70 mm depth 1 sqm 100.00 0.078 7.83
3 Patch work 25 - 35 mm depth 1 sqm 150.00 0.040 5.99
4 Patch work 15 - 25 mm depth 1 sqm 100.00 0.030 2.96
5 Wet Mix Macadam 1 cum 10.00 1.320 13.20
6 Forming shoulders 1 cum 15.00 1.000 15.000
7 CRS Masonry in CM(1:6) substructure 1 cum 2.00 1.100 2.20 0.320 0.64
8 CC(1:2:4) 1 cum 0.07 0.920 0.06 0.420 0.03
9 12mm plaster 1 sqm 75.00 0.000 0.00 0.150 11.25
10 K.M stone 1 No's 2.00 0.141 0.28 0.071 0.14
11 H.M stone 1 No's 2.00 0.202 0.40 0.101 0.20

Total Quantity 15.00 34.73 12.26


Rate 30.00 75.00 40.00
Amount Rs 450.00 2605.00 490.00
Total Amount Rs 3545.00

Asst.Executive Engineer (R&B) Dy. Executive Engineer (R&B) Executive Engineer (R&B)
R&B Section, Makloor R&B Sub-Division-Armoor Division.Nizamabad
"A.M to Guthpa village to NH-16 (Via) Ramchandrapally road from Km 0/0 to 3/7 in Nizamabad district Year 2018-
Name of Work:- 19"

BITUMEN LEADS & RATES


STRAIGHT LEAD :: 692.00 km
Lead Conveyance Rates
Lead for Emulsion ( round the trip ):: 1384.00 km 1.50
Lead for Bulk Bitumen ( round the trip ) :: 1384.00 km 1.50
Bulk Bulk CRMB Emulsion
TYPE OF BITUMEN
(80/100) (60/70) Gr 55 (M.S)

Initial cost (Ex. Mumbai) 34644.80 35588.80 0.00 30919.00

Deduct loading -- -- -- --

Deduct loading, Unloading & Stacking -- -- -- --

Deduct cost of Empty Emulsion Drums -- -- -- --

Total 34644.80 35588.80 0.00 30919.00

Lead charges for Bulk BT 1.5 x 1384 2076.00 2076.00 2076.00

Lead charges for Emulsion 1.5 x 1384 2076.00

Total 36720.80 37664.80 2076.00 32995.00

OR SAY 36720.80 37664.80 2076.00 32995.00

Asst. Executive Engineer Dy. Executive Engineer Executive Engineer


R&B Section,Makloor R&B Sub-Division-Armoor (R&B) Division, Nizamabad.
(R&B) Circle :: Nizamabad

Emulsion
Bulk Bulk CRMB (M.S)
TYPE OF BITUMEN
(80/100) (60/70) Gr 55
Rates Linked to Data 36720.80 37664.80 2076.00 32995.00
Name of Work :: "A.M to Guthpa village to NH-16 (Via) Ramchandrapally road from Km 0/0 to 3/7 in Nizamabad district Year
2018-19"
RMR.
SSR :: 2018-19

Initial Rate of Material

Machine Crushing
(-) Stacking Charges
Conveyance rate (-)
unloading charges

Stacking Charges

Blasting Charges
Average Lead

Initial Rate
Conveyance

Charges

Seigniorage
Loading &

of Material
Charging
Weighted

Charges
Stacking
TOTAL RATE

0
rate
S.No Nature of Metal

25% On (6+9) SUM of


(4-5) (7-5) on (9) % Value ( 8 to12&14 )
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

IRC and MORT&H HBG/HBT METALS ( HMP LEADS )


1 40 mm to 45 mm M.C Metal 68.300 0.00 112.58 520.00 68.30 520.00 67.00 130.00 0.00 0.0 0.00 785.30
2 25 mm to 27 mm M.C Metal 4.00 68.300 0.00 112.58 790.00 68.30 790.00 67.00 197.50 0.00 0.0 0.00 1122.80
3 19 mm to 22 mm M.C Metal 4.00 68.300 0.00 112.58 821.00 68.30 821.00 67.00 205.25 0.00 0.0 0.00 1161.55
4 12 mm to 14 mm M.C chips 4.00 68.300 0.00 112.58 700.00 68.30 700.00 67.00 175.00 0.00 0.0 0.00 1010.30
5 9.5 mm to 11.2 mm M.C chips 4.00 68.300 0.00 112.58 620.00 68.30 620.00 67.00 155.00 0.00 0.0 0.00 910.30
6 5 mm to 7 mm M.C chips 4.00 68.300 0.00 112.58 485.00 68.30 485.00 67.00 121.25 0.00 0.0 0.00 741.55
7 2.36 mm to 5 mm 4.00 68.300 0.00 112.58 485.00 68.30 485.00 67.00 121.25 0.00 0.0 0.00 741.55
8 Below 2.36 mm (Dust) 4.00 68.300 0.00 112.58 485.00 68.30 485.00 -- -- 0.00 0.0 0.00 553.30
IRC and MORT&H HBG/HBT METALS ( CRUSHER LEADS )
10 50 mm to 55 mm Metal 4.00 68.30 0.00 112.58 440.00 68.30 440.00 67.00 110.00 0.00 0.0 0.00 685.30
11 40 mm to 45 mm M.C Metal 4.00 68.30 0.00 112.58 520.00 68.30 520.00 67.00 130.00 0.00 0.0 0.00 785.30
12 25 mm to 27 mm M.C Metal 4.00 68.30 0.00 112.58 790.00 68.30 790.00 67.00 197.50 0.00 0.0 0.00 1122.80
13 19 mm to 22 mm M.C Metal 4.00 68.30 0.00 112.58 821.00 68.30 821.00 67.00 205.25 0.00 0.0 0.00 1161.55
14 12 mm to 14 mm M.C chips 4.00 68.30 0.00 112.58 700.00 68.30 700.00 67.00 175.00 0.00 0.0 0.00 1010.30
15 9.5 mm to 11.2 mm M.C chips 4.00 68.30 0.00 112.58 620.00 68.30 620.00 67.00 155.00 0.00 0.0 0.00 910.30
16 5 mm to 7 mm M.C chips 4.00 68.30 0.00 112.58 485.00 68.30 485.00 67.00 121.25 0.00 0.0 0.00 741.55
17 2.36 mm to 5 mm 4.00 68.30 0.00 112.58 485.00 68.30 485.00 67.00 121.25 0.00 0.0 0.00 741.55
18 Below 2.36 mm (Dust) 4.00 68.30 0.00 112.58 485.00 68.30 485.00 67.00 -- 0.00 0.0 0.00 620.30
IRC and MORT&H HBG/HBT METALS ( QUARRY LEADS )
12 40 mm to 45 mm Metal 4.00 68.30 0.00 112.58 520.00 68.30 520.00 67.00 -- 0.00 0.0 0.00 655.30
13 50 mm to 55 mm Metal 4.00 68.30 0.00 112.58 440.00 68.30 440.00 67.00 -- 0.00 0.0 0.00 575.30
14 60 mm to 63 mm Metal 4.00 68.30 0.00 112.58 400.00 68.30 400.00 67.00 -- 0.00 0.0 0.00 535.30
15 SS 300mm (HBG) for revetment 4.00 68.30 0.00 112.58 156.00 68.30 156.00 67.00 -- 0.00 0.0 0.00 291.30
Quarry spall( Field picked metal) 4.00 68.30
16 Av. Of rate 25mm & 40mm 4.00 68.30 0.00 112.58 43.00 68.30 43.00 -- -- 0.00 0.0 0.00 111.30
17 150 mm soling stone HBG metal 4.00 68.30 0.00 112.58 90.00 68.30 90.00 67.00 -- 0.00 0.0 0.00 225.30
HBG/HBT SS 5 METALS ( CRUSHER LEADS )
1 6 mm size M.C. Chips 4.00 68.30 0.00 112.58 505.00 68.30 505.00 67.00 126.25 0.00 0.0 0.00 766.55
2 10 mm size M.C. Chips 4.00 68.30 0.00 112.58 657.00 68.30 657.00 67.00 164.25 0.00 0.0 0.00 956.55
3 12 mm size M.C. Chips 4.00 68.30 0.00 112.58 781.00 68.30 781.00 67.00 195.25 0.00 0.0 0.00 1111.55
4 20 mm size M.C. Metal 4.00 68.30 0.00 112.58 870.00 68.30 870.00 67.00 217.50 0.00 0.0 0.00 1222.80
5 25 mm size M.C. Metal 4.00 68.30 0.00 112.58 830.00 68.30 830.00 67.00 207.50 0.00 0.0 0.00 1172.80
6 40 mm size M.C. Metal 4.00 68.30 0.00 112.58 505.00 68.30 505.00 67.00 126.25 0.00 0.0 0.00 766.55

HBG/HBT SS 5 METALS ( QUARRY LEADS )


1 CRS Stone 4.00 62.58 0.00 112.58 249.00 62.58 249.00 67.00 -- 0.00 0.0 0.00 378.58
2 Rough stone 4.00 62.58 0.00 112.58 146.00 62.58 146.00 67.00 -- 0.00 0.0 0.00 275.58
3 SS 225 mm 4.00 62.58 0.00 112.58 152.00 62.58 152.00 67.00 -- 0.00 0.0 0.00 281.58
4 Bond Stones(600x200x200) 42 No 4.00 62.58 0.00 112.58 1218.00 62.58 1218.00 0.00 -- 0.00 0.0 0.00 1280.58
Cost of each Bond Stone 30.49
1 Gravel 5.00 80.36 0.00 64.08 98.00 80.36 98.00 -- -- 0.00 0.0 0.00 178.36
2 Sand for Mortar 57.00 652.73 0.00 64.08 760.00 652.73 760.00 -- -- 0.00 0.0 0.00 1412.73
3 Sand for Concrete + Stone dust 57.00 652.73 0.00 64.08 570.00 652.73 570.00 -- -- 0.00 0.0 0.00 921.52
4 Sand for Filling 57.00 652.73 0.00 64.08 570.00 652.73 570.00 -- -- 0.00 0.0 0.00 1222.73

5 Cement 4750.00 4750.00


6 HYSD Steel 47000.00 47000.00
7 MS Steel 43000.00 43000.00
8 6 mm Mild Steel 44000.00 44000.00
0 Asst. Executive Engineer Dy. Executive Engineer Executive Engineer Superintending Engineer
0 R&B Section, Makloor R&B Sub-Division-Armoor (R&B) Division, Nizamabad (R&B) Circle :: Nizamabad
9
Name of Work ::- "A.M to Guthpa village to NH-16 (Via) Ramchandrapally road from Km 0/0 to 3/7 in
Nizamabad district Year 2018-19"

DATA
SSR :: 2018-19 Date :: Municipal Area Allowance :: 0.0%

Quantit
SNo Unit Description of Item Rate per Amount
y
1 2 3 4 5 6 7
1 Providing BT patch work for pot holes of depth ranging from 70mm ,using 40mm HBG/HBT
metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at
42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick
layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including
removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces
,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the
surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all
operations etc., complete.

Unit - 1 Sqm
Materials
Pot hole filling:
0.06050 cum 40 mm HBG/HBT metal ( 1.00 x 1.00 x 0.045 x 1.10 ) 785.30 1.0 47.51
0.00715 cum 10-12 mm size key chips (1.00 x 1.00 x 0.045) x (13/100) 910.30 1.0 6.51
2.31000 Kgs VG 10 Grade bitumen (1.00 x 1.00 x 0.045) x 42 Kgs/Cum 36.7208 1.0 84.83
( Including tack coat )
Sealing the pot hole:
0.01995 cum 10-12mm size HBG/HBT chips (1.00 x 1.00 x 0.015 x 1.33 ) 910.30 1.0 18.16
0.00300 cum Stone dust / Sand (1.00 x 1.00 x 0.003 ) 620.30 1.0 1.86
1.08000 Kgs VG 10 Grade bitumen ( 1.00 x 1.00 x 0.015 )x 72 Kgs/1Cum 36.7208 1.0 39.66
Add extra for wastage of materials and re-carting / inter carting
10.00 % of materials @ 10% on the cost of granite metal chips 74.04 7.40

TOTAL A= 205.93
Labour charges
Man Mazdoor for Pot hole filling
2.8600 no with 40 mm HBG/HBT metal( (0.070)*310) 29.750 1.0 85.09
Add 15 % of labour charges towards mobility/
15.00 % conveyance carting / re-carting of men, material etc. 85.09 12.76
0.0 % Municipal Area Allowance 97.85 0.00

Add hire charges of bitumen boiler, cost of fuel, erection of


caution boards, tools for tamping, excavation, cleaning and all
other items etc., required for finished item of work for patch
0.055 cum work 234.08 12.87
TOTAL B= 110.73
(C ) (excluding seigniorage) charges
0.055 cum METAL 0.00 1.00 0.00
(A+B+C) 316.66
0.00 % Add VAT 316.66 1.0 0.00
316.66
Rate per sqm 316.70
1 2 3 4 5 6 7

2 Providing BT patch work for pot holes of depth ranging from 50 to 70mm ,using 40mm HBG/HBT
metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade bitumen at
42 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a 15mm thick
layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 72 /Kgs /1Cum., including
removal of the loose material in the pot holes ,trimming the edges to provide firm vertical faces
,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and blinding the
surface using stone dust/sand ,including cost of all materials ,T&P and labour charges for all
operations etc., complete.

Unit - 1 Sqm
Materials
Pot hole filling:
0.04950 cum 40 mm HBG/HBT metal ( 1.00 x 1.00 x 0.045 x 1.10 ) 785.30 1.0 38.87
0.00585 cum 10-12 mm size key chips (1.00 x 1.00 x 0.045) x (13/100) 910.30 1.0 5.33
1.89000 Kgs VG 10 Grade bitumen (1.00 x 1.00 x 0.045) x 42 Kgs/Cum 36.7208 1.0 69.40
( Including tack coat )

Sealing the pot hole:

0.01995 cum 10-12mm size HBG/HBT chips (1.00 x 1.00 x 0.015 x 1.33 ) 910.30 1.0 18.16
0.00300 cum Stone dust / Sand (1.00 x 1.00 x 0.003 ) 620.30 1.0 1.86
1.08000 Kgs VG 10 Grade bitumen ( 1.00 x 1.00 x 0.015 )x 72 Kgs/1Cum 36.7208 1.0 39.66

Add extra for wastage of materials and re-carting / inter carting


10.00 % of materials @ 10% on the cost of granite metal chips 64.22 6.42

TOTAL A= 179.70
Labour charges
Man Mazdoor for Pot hole filling
2.8600 no with 40 mm HBG/HBT metal( (0.070+0.050)/2*) 25.500 1.0 72.93

Add 15 % of labour charges towards mobility/


15.00 % conveyance carting / re-carting of men, material etc. 72.93 10.94
0.0 % Municipal Area Allowance 83.87 0.00

Add hire charges of bitumen boiler, cost of fuel, erection of


caution boards, tools for tamping, excavation, cleaning and all
other items etc., required for finished item of work for patch
work
0.045 cum 234.08 10.53
TOTAL B= 94.40
(C ) (excluding seigniorage) charges

0.045 cum METAL 0.00 1.00 0.00


(A+B+C) 274.11
0.00 % Add VAT 274.11 1.0 0.00
274.11
Rate per sqm 274.10
1 2 3 4 5 6 7
3 Providing BT patch work for pot holes of depth ranging from 25 to 35mm ,using 20-25mm
HBG/HBT metal with required quantity of 10-12 mm size HBG/HBT key chips and VG 10 grade
bitumen at 72 kgs/1Cum of work for filling the pot holes and sealing the filled up pot hole with a
15mm thick layer using 10-12mm HBG/HBT chips and VG 10 grade bitumen at 80 /Kgs /1Cum.,
including removal of the loose material in the pot holes ,trimming the edges to provide firm
vertical faces ,cleaning ,applying tack coat ,filling the pot holes to compacting and finishing and
blinding the surface using stone dust/sand ,including cost of all materials ,T&P and labour charges
for all operations etc., complete.

Unit - 1 Sqm
Materials
Pot hole filling:
0.0345 cum 20-25mm HBG/HBT metal ( 1.00 x 1.00 x 0.030 x 1.15 ) 1161.55 1.00 40.07
0.0039 cum 10-12 mm size key chips ( 1.00 x 1.00 x 0.030 )x (13/100) 910.30 1.00 3.55
0.0030 cum Stone dust / Sand (1.00 x 1.00 x 0.003 ) 620.30 1.00 1.86
2.1600 Kgs VG 10 Grade bitumen (1.00 x 1.00 x 0.055) x 72Kgs/Cum 36.7208 1.00 79.32
( Including tack coat )

Add extra for wastage of materials and re-carting / inter carting


10.00 % of materials @ 10% on the cost of granite metal chips 45.48 4.55
TOTAL A= 129.35
Labour charges

Man Mazdoor for Pot hole filling


2.8600 no with 40 mm HBG/HBT metal( (0.025+0.035)/2*310) 12.750 1.0 36.47

Add 15 % of labour charges towards mobility/


15.00 % conveyance carting / re-carting of men, material etc. 36.47 5.47
0.0 % Municipal Area Allowance 41.94 0.00

Add hire charges of bitumen boiler, cost of fuel, erection of


caution boards, tools for tamping, excavation, cleaning and all
other items etc., required for finished item of work for patch
0.030 cum work 234.08 7.02
TOTAL B= 48.96
(C ) Seigniorage charges

0.030 cum METAL 0.00 1.00 0.00


(A+B+C) 178.31
0.00 % Add VAT 178.31 1.0 0.00
178.31
Rate per sqm 178.30

4 Providing BT patch work for pot holes of depth ranging from 15 to 25 mm ,using 10-12mm
HBG/HBT metal and VG 10 grade bitumen at 80 kgs/1Cum of work for filling the pot holes and
sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG/HBT chips and VG 10
grade bitumen at 72 /Kgs /1Cum., including removal of the loose material in the pot holes
,trimming the edges to provide firm vertical faces ,cleaning ,applying tack coat ,filling the pot
holes to compacting and finishing and blinding the surface using stone dust/sand ,including cost of
all materials ,T&P and labour charges for all operations etc., complete.

Unit - 1 Sqm
Materials
1 2 3 4 5 6 7
Pot hole filling:
0.0266 cum 10-12 mm size key chips (1.00 x 1.00 x 0.020) x (133/100) 910.30 1.0 24.21
0.003 cum Stone dust / Sand ( 1.00 x 1.00 x 0.003 ) 620.30 1.0 1.86
1.440 Kgs VG 10 Grade bitumen ( 1.00 x 1.00 x 0.020 ) x 72Kgs/Cum 36.7208 1.0 52.88
( Including tack coat )

Add extra for wastage of materials and re-carting / inter


carting of materials @ 10% on the cost of granite metal
10.00 % chips 26.07 2.61
TOTAL A= 81.56
Labour charges
Man Mazdoor for Pot hole filling
2.8600 no with 40 mm HBG/HBT metal( (0.015+0.025)/2*310) 8.500 1.0 24.31
Add 15 % of labour charges towards mobility/
15.00 % conveyance carting / re-carting of men, material etc. 24.31 3.65
0.0 % Municipal Area Allowance 27.96 0.00

Add hire charges of bitumen boiler, cost of fuel, erection


of caution boards, tools for tamping, excavation, cleaning
0.020 and all other items etc., required for finished item of work
cum for patch work 234.08 4.68

TOTAL B= 32.64
(C ) (excluding seigniorage) charges
0.020 cum METAL 0.00 1.00 0.00
(A+B+C) 114.20
0.00 % Add VAT 114.20 1.0 0.00
114.20
Rate per sqm 114.20

5 Providing, Laying, Spreading and compacting graded HBG crushed stone aggregate to Wet Mix
macadam specification including cost, (excluding seigniorage) of all materials and including
premixing the material with water at OMC in Mechanical mix plant carriage of mixed material by
tipper to site , laying in uniform layers with paver in base courses on well prepared surface and
compacting with Vibratory roller to achieve the desired density etc., as directed by the Engineer-
in-Charge and as per MoRT&H specification.406 (5th revision) for finished item of work.
(Payment will be made based on levels for finished item of work)

Page 110,111 of MoRT&H SDB


Unit = cum
Taking output = 225 cum
(A) Labour
0.48 nos. Mate 450.00 1.00 216.00
2.00 nos. Mazdoor skilled 465.00 1.00 930.00
10.00 nos. Mazdoor 425.00 1.00 4250.00
5396.00
0.0 % Municipal Area Allowance 5396.00 0.00
TOTAL A= 5396.00
(B) Machinery
6.60 hour Wet mix plant of 60 ton hr. capacity 1843.52 1.00 12167.23
6.00 hour Electric generating set 125 KVA 1478.40 1.00 8870.40
6.00 hour front end loader 1 cum capacity 1843.52 1.00 11061.12
1 2 3 4 5 6 7
6.00 hour Hydro Static sensor Paver finisher 100 TPH 3426.65 1.00 20559.90
3.90 hour Vibratory roller 8-10 T 1436.96 1.00 5604.14
3.00 hour Water tanker 698.88 1.00 2096.64
TOTAL B= 60359.43
(C) Material
45 to 22.40mm IRC HBG metal @ 30%
89.10 cum Avg. rate of (40-45), (25-27), (19-22mm ) 1023.22 1.00 91168.61
22.4-2.36mm IRC HBG metal @ 40%
118.80 cum Avg. rate of (19-22),(12-14),(9.5-11.2),(5-7),(2.36mm & below) 913.05 1.00 108470.34
2.36mm to 75 micron @ 30%
89.10 cum (2.36mm & below) 620.30 1.00 55268.73
TOTAL C= 254907.68
(A + B +C) 320663.11

5.00 % (D) Over Head Charges on (A+B+C) 320663.11 16033.16

10.00 % (E) Contractors Profit on (A+B+C+D) 336696.27 33669.63

(F ) Seigniorage charges
297.00 cum Metal 0.00 1.00 0.00

225.00 cum TOTAL Cost for 225 cum = (A+B+C+D+E+F) 370365.90


Rate per 1 cum 1646.07
Rate per 1 cum 1646.00
6 Clearing of Light Jungle including all labour charges etc., complete for finished item of work.
1.00 sqm Sqm rate as per SSR(112 D) 3.50 1.0 3.50
0.00 % Add VAT 3.50 1.0 0.00
3.50
0 Rate per sqm 3.50
9 Stripping the excess soil from the shoulder surface to achieve the approved level for sectioning the berms,
shoulders as per MORT&H specification No.3003 (As per E-in-C Circular Memo NO. Maintenance/ E.E(TEC)
TA15/AE4/2005, dt.25/04/2005)

Unit - 1 Sqm
Taking out put of 100 Sqm and
assuming average depth of stripping as 75mm, quantity of earth
cutting involved = 7.50 Cum

LABOUR
0.10 No No of Mate 450.00 1.00 45.00
2.50 No No of Mazdoor 425.00 1.00 1062.50
Sundries for caution boards, tools for ramming etc., LS 0.40
TOTAL 1107.90
0.00 % Add VAT 1107.90 1.0 0.00
Rate per 100 sqm 1107.90
Rate per sqm 11.10

10 Making up loss of material/ irregularities on the shoulder to the design level by adding fresh approved soil and
compacting with appropriate equipment as per MORT&H specification No.3003 (As per E-in-C Circular Memo
NO. Maintenance/ E.E(TEC) TA15/AE4/2005, dt.25/04/2005)

Unit = 1 Sqm
1 2 3 4 5 6 7
Taking out put of 100 Sqm and
assuming average thickness of filling to be 100mm, quantity of fresh
material / earth involved = 15 Cum

Labour
0.18 No No of Mate 450.00 1.0 81.00
4.50 No No of Mazdoor 425.00 1.0 1912.50
Machinery
Hour
0.25 s Excavator 1.0 Cum Bucket capacity @ 60 Cum / 1 Hour 2967.90 1.0 741.98
Tipper (L.S. towards having other amenities complete & rounding off
is average lead in Km. For borrow earth) = 24 x L = (1 Km lead is
considered, Hence L=1)
24.00 t.Km 6.00 1.0 144.00
Add 10% of cost of transportation to cover
% cost of loading and un-loading
10.00 144.00 14.40
Sundries for caution boards, tools for ramming etc., LS 3.56
TOTAL 2897.44
0.00 % Add VAT 2897.44 1.0 0.00
Rate per 100 sqm 2897.44
Rate per sqm 29.00
11 Forming shoulders with borrowed useful earth from outside road boundary having MDD not less
than 1.75 gm/cc by mechanical means up to SDR with all leads and lifts including pre - watering
of soil at borrow area, removal of top soil, excavation of solis at borrowed area, convayance of
soil, depositing the soil on the shoulders, spreading soil, breaking clods, sectioning, grading and
consolidation with Hand roller to FMC including all hire and operational charges of T&P and
(excluding seigniorage) charges, complete for finished item of work

(5th revision) With a lead of 5KM (Payment will be made based on levels for finished item of
work).
Page 68,69 of MoRT&H SDB
Unit : Cum
Taking out put = 100 Cum
(A) Labour
0.04 day Mate 450.00 1.00 18.00
1.00 day Mazdoor unskilled 425.00 1.00 425.00
443.00
0.0 % Municipal Area Allowance 443.00 0.00
TOTAL A= 443.00

(B) Machinery
100.00 cum Rate as per G.I. Ms. No 10, Dt 26/7/2005 13.00 1.00 1300.00
800.00 t.km Tipper ( for 5 Km = 160 x 5 = 800) t.km 6.00 t.km 4800.00
Add 10% of cost of carriage to cover
cost of loading and unloading 480.00
0.50 hour Dozer 80 HP for spreading @ 200 cum per hour 2661.20 1.00 1330.60
1.00 hour Motor Graders for Grading @ 100 cum per hour 0.00 1.00 0.00
4.00 hour Water tanker 6 KL 698.88 1.00 2795.52
1.00 hour Vibratory roller 8T 0.00 1.00 0.00
TOTAL B= 10706.12
(A + B ) 11149.12

5.00 % (C) Over Head Charges on (A+B) 11149.12 557.46


1 2 3 4 5 6 7

10.00 % (D) Contractors Profit on (A+B+C) 11706.58 1170.66

(E ) Seigniorage charges
100.00 cum Earth 0.00 1.00 0.00

100.00 cum TOTAL Cost for 100 cum = (A+B+C+D+E) 12877.24

Rate per 1 cum 128.77


Rate per 1 cum 129.00

12 CRS masonry 2nd sort in CM (1:6) prop by using HBG stones including cost and conveyance of all materials
and labour charges ,all leads and lifts, curing and all other T&P charges etc. complete
Material
0.60 cum CRS stone 378.58 1.0 227.15
0.50 cum RR stone 275.58 1.0 137.79
0.32 cum CM(1:6)prop. 2279.23 1.0 729.35
Labour Charges
0.75 No I st class Mason 500.00 1.0 375.00
1.75 No II nd class Mason 450.00 1.0 787.50
2.80 No Man & women Mazdoor 425.00 1.0 1190.00
BASIC RATE 3446.79
CASE ( I ) Un scattered works ( Value >= Rs.20,000)
Basic Rate 3446.79
12.00 % Add VAT 3446.79 1.0 413.61
3860.40
Rate per Cum 3860.40

CASE (II ) Scattered works ( Value < Rs.20,000)


Basic rate 3446.79

Add 25.0 % provision for scattered work towards wastage of


materials and , carting/ inter carting of material and labour from one
25.00% place to other 3446.79 1.0 861.70
4308.49
0.00 % Add VAT/ TOT 4308.49 1.0 0.00
4308.49
Rate per Cum 4308.50

13 CC (1:2:4) mix prop using 20mm IRC HBG metal including cost and conveyance of all materials and all labour
charges ,curing, etc., for coping on the retaining wall.

Material
0.92 cum Cost of 20mm metal 1222.80 1.0 1124.98
0.42 cum Cost of sand 1412.73 1.0 593.35
0.23 cum Cost of Cement 4750.00 1.0 1092.50
Labour Charges
0.06 No I st class Mason 500.00 1.0 30.00
0.14 No II nd class Mason 450.00 1.0 63.00
3.20 No Man AS
& women Mazdoor 425.00 1.0 1360.00
Labour charges for mixing( per approved rate in MVI Bld Pebbair
1.00 cum datas) 59.00 1.0 59.00
1 2 3 4 5 6 7
Centering Charges( as per PCC M20 rate centering charges in MVI Bld
1.00 cum Pebbair) 277.00 1.0 277.00
BASIC RATE 4599.83
CASE ( I ) Un scattered works ( Value >= Rs.20,000)
Basic Rate 4599.83
0.00 % Add VAT 4599.83 1.0 0.00
4599.83
Rate per Cum 4599.80

CASE (II ) Scattered works ( Value < Rs.20,000)


Basic rate 4599.83
Add 25.0 % provision for scattered work towards wastage of
materials and , carting/ inter carting of material and labour from one
place to other
25.00% 4599.83 1.0 1149.96
5749.79
0.00 % Add VAT 5749.79 1.0 0.00
5749.79
Rate per Cum 5749.80
0
0
14 Plastering 12 mm thick in CM(1:5) to exposed part of CRS masonry including cost and conveyance of all
materials and labour charges for curing etc. complete for finished item of work.
unit = 10.0 sqm
Material
0.15 cum Cost of CM(1:5) prop 2421.73 1.00 363.26
Labour Charges
0.33 No I st class Mason 500.00 1.00 165.00
0.77 No II nd class Mason 450.00 1.00 346.50
1.60 No Man & women Mazdoor 425.00 1.00 680.00
BASIC RATE Total 1554.76
CASE ( I ) Un scattered works ( Value >= Rs.20,000)
Basic Rate 1554.76
0.00 % Add VAT 1554.76 1.0 0.00
1554.76
Rate per sqm 155.50

CASE (II ) Scattered works ( Value < Rs.20,000)


Basic rate 1554.76

Add 25.0 % provision for scattered work towards wastage of


materials and , carting/ inter carting of material and labour from one
25.00% place to other 1554.76 1.0 388.69
1943.45
0.00 % Add VAT 1943.45 1.0 0.00
1943.45
Rate per sqm 194.30
0
15 White washing two coats with best shell lime after thoroughly brushing the surface to remove all dirt and
remain of loose including all taxes, cost and conveyance of all materials to site and all labour charges for mixing
unit = 100.0 sqm
paint, application, curing scaffolding charges lift charges etc., complete for finished item of work.
Material
0.07 cum Cost of screened shell lime(SSR 2015-16 Nos 101D Page No 14) 893.00 1.0 62.51
1 2 3 4 5 6 7
Labour Charges
0.48 No I st class Mason 500.00 1.0 240.00
1.12 No II nd class Mason16) 450.00 1.0 504.00
3.20 No Man & women Mazdoor 425.00 1.0 1360.00
BASIC RATE 2166.51
CASE ( I ) Un scattered works ( Value >= Rs.20,000)
Basic Rate 2166.51
0.00 % Add VAT 2166.51 1.0 0.00
2166.51
Rate per sqm 21.70

CASE (II ) Scattered works ( Value < Rs.20,000)


Basic rate 2166.51

Add 25.0 % provision for scattered work towards wastage of


materials and , carting/ inter carting of material and labour from one
25.00% place to other 2166.51 1.0 541.63
2708.14
0.00 % Add VAT 2708.14 1.0 0.00
2708.14
Rate per sqm 27.10
0

Asst.Executive Engineer Dy. Executive Engineer Executive Engineer (R&B)


R&B Section,Makloor R&B Sub-Division-Armoor Division.Nizamabad
"A.M to Guthpa village to NH-16 (Via) Ramchandrapally road from Km 0/0 to 3/7 in Nizamabad district Year 2018-19"

MANUFACTURING & SUPPLY (TRANSPORTATION) OF HM,KM & 5th KM Fixing charges Total cost for
STONES from next Total Rate Manufacture,
sheet for Painiting Supply and fixing

1. HM STONES : (SIZE: 900X225X150 MM)


(a). M-15 Grade of Concrete : Cu.m 0.030 4251.56 Per Cu,m 125.89
(b). HYSD Steel Reinforcement: Kgs. 2.445 64.65 Per Kg. 158.07
(c ).Transportation including loading &
unloading: 136.47

Rate per HM Stone 420.42 559.00 64.30 1044.00

2. KM STONES : (SIZE: 1100X400X150 MM)


(a). M-15 Grade of Concrete : Cu.m 0.063 4251.56 Per Cu,m 267.85
(b). HYSD Steel Reinforcement: Kgs. 3.843 64.65 Per Kg. 248.45
(c ).Transportation including loading &
unloading: 321.67
Rate per KM Stone 837.96 733.00 215.36 1786.00

3. 5th KM STONES : (SIZE: 1350X450X150 MM)


(a). M-15 Grade of Concrete : Cu.m 0.0893 4251.56 Per Cu,m 379.66
(b). HYSD Steel Reinforcement: Kgs. 4.65 64.65 Per Kg. 300.62
(c ).Transportation including loading &
unloading: 668.75
Rate per 5th KM Stone 1349.03 804.58 445.46 2599.00

4. GUARD STONES : (SIZE: 1200X200X200 MM)


(a). M-15 Grade of Concrete : Cu.m 0.048 4251.56 Per Cu,m 204.08
(b). HYSD Steel Reinforcement: Kgs. 3.017 64.65 Per Kg. 195.05
(c ).Transportation including loading &
unloading: 195.80
Rate per Guard Stone 594.92 591.48 1186.40

M-15 GRADE OF CONCRETE : [MoRT&H Sr.No. 12.8(A)]


Taking Out Put : 15 Cu.m

(a). Material:
40 mm Metal cu,m 8.10 766.55 6209.06
20 mm Metal cu,m 4.05 1222.80 4952.34
10 mm Metal cu,m 1.35 956.55 1291.34
Cement cu,m 4.13 4750.00 19617.50
Sand cu,m 6.75 1222.73 8253.43
40323.67
(b). Labour:
Mate Day 0.86 450.00 387.00
Mason Day 1.50 450.00 675.00
Mazdoor Day 20.00 425.00 8500.00
9562.00
(c ). Machinery:
Concrete Mixer Hr. 6.00 534.30 3205.80

(d). Form work @ 4% on (a+b+c) 2123.66

(e). Over Heads @ 5% on (a+b+c+d) 2760.76

(f). Contractor's Profit @ 10% on (a+b+c+d+e) 5797.59


Rate of M-15 Grade per 15 Cu.m(a+b+c+d+e+f) 63773.47
Rate of M-15 Grade per Cu.m (a+b+c+d+e+f)/15 4251.56

HYSD STEEL REINFORCEMENT [MoRT&H Sr.No. 13.6]


Taking Out Put: 1 M.T
47000.00
(a). Material: 2350
HYSD Steel including 5%
wastage: M.T 1.05 49350.00 51817.50 49350.00
Binding Wire Kg. 6.00 50.00 300.00
52117.50
(b). Labour: (for cutting,bending,tying,shifting to site & placing in position)
Mate Day 0.34 450.00 153.00
Black smith Day 2.00 470.00 940.00
Mazdoor Day 6.50 425.00 2762.50
3855.50

(c ). Over Heads @ 5% on (a+b) 2798.65

(d). Contractor's Profit @ 10% on (a+b+c) 5877.17

Rate of HYSD Steel Per M.T (a+b+c+d) 64648.82


Rate of HYSD Steel Per Kg. (a+b+c+d)/1000 64.65

CONCRETE AND STEEL QUANTITIES

250 mm
200 mm
115 mm

1350mm
900 mm 1100 mm
1100mm
785 mm 900 mm

225 mm 400 mm 450 mm

HM STONE KM STONE 5 th KM STONE

THICK NESS OF THESE STONES:150 MM 225/400/450mm

8mm
150mm
6mm

(i). HM STONES:

1). Concrete Quantity:


Straight portion: 0.785 0.225 0.15 0.0265
Semi-circle portion: 0.5 3.143 0.115 0.115 0.15 0.0031
Total: (Cu 0.0296

2). Steel Quantity:


a). Main Bars(8mm Dia.) - straight portion 4 0.785 0.395 1.240
Semi-Circle portion 2 0.5 3.143 0.085 0.395 0.106
b). Stirrups(6mm Dia.) @ 100 mm c/c 9 0.275 2 0.222 1.099
Total:(Kgs 2.445

(ii). KM STONES:

1). Concrete Quantity:


Straight portion: 0.900 0.400 0.150 0.054
Semi-circle portion: 0.5 3.143 0.200 0.200 0.15 0.009
Total: (Cu 0.063

2). Steel Quantity:


a). Main Bars(8mm Dia.) - straight portion 4 0.9 0.395 1.422
Semi-Circle portion 2 0.5 3.143 0.18 0.395 0.223
b). Stirrups(6mm Dia.) @ 100 mm c/c 11 0.45 2.00 0.222 2.198
Total:(Kgs 3.843

(iii). 5 th KM STONES:

1). Concrete Quantity:


Straight portion: 1.100 0.450 0.150 0.074
Semi-circle portion: 0.5 3.143 0.250 0.250 0.15 0.015
Total: (Cu 0.089

2). Steel Quantity:


a). Main Bars(8mm Dia.) - straight portion 4 1.1 0.395 1.738
Semi-Circle portion 2 0.5 3.143 0.200 0.395 0.248
b). Stirrups(6mm Dia.) @ 100 mm c/c 12 0.500 2.00 0.222 2.664
Total:(Kgs 4.650

(iv). GUARD STONES:

1). Concrete Quantity:


Straight portion: 1.200 0.200 0.200 0.048
Semi-Circle portion 0.000
Total: (Cu 0.048

2). Steel Quantity:


a). Main Bars(8mm Dia.) - straight portion 4 1.1 0.395 1.738
Semi-Circle portion 0.000
b). Stirrups(6mm Dia.) @ 100 mm c/c 12 4.000 0.12 0.222 1.279
Total:(Kgs 3.017
TRANSPORTATION OF HM,KM,5th KM & GUARD STONES

1). HM STONES: [MoRT&H Sr.No. 8.14(iii)]


Taking Out-put: 33 No.s

a). Labour:
Mazdoor for loading & Unloading; Day 7.00 425.00 2975.00

b). Machinery:
Tractor-trolley:(Page No 22 SSR 2014- Hr. 6.00 154.00 924.00

c). Over Heads @ 5% on (a+b) 194.95

d). Contractor's Profit @ 10% on (a+b+c) 409.395


Transportation per 33 No.s of HM stones (a+b+c+d) 4503.35
Rate of Transportation per HM stone (a+b+c+d)/33 136.47

2). KM STONES: [MoRT&H Sr.No. 8.14(iii)]


Taking Out-put: 14 No.s

a). Labour:
Mazdoor for loading & Unloading; Day 7.00 425.00 2975.00

b). Machinery:
Tractor-trolley:(Page No 22 SSR 2014- Hr. 6.00 154.00 924.00

c). Over Heads @ 5% on (a+b) 194.95

d). Contractor's Profit @ 10% on (a+b+c) 409.395


Transportation per 14 No.s of KM stones (a+b+c+d) 4503.35
Rate of Transportation per KM stone (a+b+c+d)/14 321.67

3). 5 th KM STONES: [MoRT&H Sr.No. 8.14(iii)]


Taking Out-put: 6 No.s

a). Labour:
Mazdoor for loading & Unloading; Day 6.00 425.00 2550.00

b). Machinery:
Tractor-trolley:(Page No 22 SSR 2014- Hr. 6.00 154.00 924.00

c). Over Heads @ 5% on (a+b) 173.7

d). Contractor's Profit @ 10% on (a+b+c) 364.77


Transportation per 6 No.s of 5th KM stones (a+b+c+d) 4012.47
Rate of Transportation per 5th KM stone (a+b+c+d)/6 668.75

4). GUARD STONES: [MoRT&H Sr.No. 8.14(iii)]


Taking Out-put: 23 No.s (Duly Interpolating the HM & KM stones Out-put and Quantities)

a). Labour:
Mazdoor for loading & Unloading; Day 7.00 425.00 2975.00

b). Machinery:
Tractor-trolley:(Page No 22 SSR 2014- Hr. 6.00 154.00 924.00

c). Over Heads @ 5% on (a+b) 194.95

d). Contractor's Profit @ 10% on (a+b+c) 409.395


Transportation per 23 No.s of Guard stones (a+b+c+d) 4503.35
Rate of Transportation per Guard stone (a+b+c+d)/23 195.80
ROAD METAL RATES 2015-16
Construction of road from Mullangi junction to Kulaspur thanda fromKm 0/0 to
NAME OF WORK ::-
1/500 in Nizamabad District
Deduct
Machine
Source of Lead in Blasting stacking Toal Cost
Sl.No Description of Metal Supply Kms
Conveyance Initial cost
charges
crushing
charges for per Cum
charges
conveyance
50 mm to 55 mm Metal IRC and
1 18 218.11 456.00 70.00 114.00 0.00 858.11
MORT&H HBG/HBT METALS

40 to 45 mm IRC and MoRTH


2 18 218.11 500.00 70.00 125.00 0.00 913.11
HBG M/C metal

25 to 27 mm IRC and MoRTH


3 18 218.11 824.00 70.00 206.00 0.00 1318.11
HBG M/C metal

19 to 22 mm IRC and MoRTH


4 18 218.11 864.00 70.00 216.00 0.00 1368.11
HBG M/C metal

12 to 14 mm IRC and MoRTH


5 18 218.11 717.00 70.00 179.25 0.00 1184.36
HBG M/C metal

9.5 to 11.20 mm IRC and MoRTH


6 18 218.11 656.00 70.00 164.00 0.00 1108.11
HBG M/C metal

5 to 7 mm IRC and MoRTH


7 18 218.11 504.00 70.00 126.00 0.00 918.11
HBG M/C metal

2.36 to 5 mm IRC and MoRTH


8 18 218.11 320.00 70.00 80.00 0.00 688.11
HBG M/C metal

HBG Stone chips 2.36mm


9 18 218.11 340.00 0.00 0.00 0.00 558.11
and below
B) FOR C.D. WORKS
10 40 mm SS-5 HBG M/C metal 18 218.11 620.00 70.00 155.00 0.00 1063.11
11 25 mm SS-5 HBG M/C metal 18 218.11 874.00 70.00 218.50 0.00 1380.61
12 20 mm SS-5 HBG M/C metal 18 218.11 916.00 70.00 229.00 0.00 1433.11
Deduct
Machine
Source of Lead in Blasting stacking Toal Cost
Sl.No Description of Metal Supply Kms
Conveyance Initial cost
charges
crushing
charges for per Cum
charges
conveyance
13 12 mm SS-5 HBG M/C metal 18 218.11 822.00 70.00 205.50 0.00 1315.61
14 10 mm SS-5 HBG M/C metal 18 218.11 692.00 70.00 173.00 0.00 1153.11
15 6 mm SS-5 HBG M/C metal 18 218.11 532.00 70.00 133.00 0.00 953.11
40 to 45 mm IRC and MoRTH
16 18 218.11 500.00 70.00 0.00 0.00 788.11
HBG HBT metal
50 mm to 55 mm Metal IRC and
17 18 218.11 456.00 70.00 0.00 0.00 744.11
MORT&H HBG/HBT METALS
60 mm to 63 mm Metal IRC and
18 18 218.11 419.00 70.00 0.00 0.00 707.11
MORT&H HBG/HBT METALS
19 SS 300mm (HBG) for revetment 18 218.11 164.00 70.00 0.00 0.00 452.11
20 Quarry spall( Field picked metal)
Av. Of rate 25mm & 40mm 18 218.11 45.00 0.00 0.00 0.00 263.11
21 150 mm soling stone HBG metal 18 218.11 95.00 70.00 0.00 0.00 383.11
Stone crusher dust finer than 3mm
22 with not more than 10% passing 18 218.11 357.00 0.00 0.00 0.00 575.11
0.075 sieve.
23 Sand for Motor 32 369.67 760.00 0.00 0.00 0.00 1129.67
24 Sand for concrete 32 369.67 560.00 0.00 0.00 0.00 929.67
50% sand 464.83
50% stone dust (2.36mm below) 279.05
50% sand + 50% Stone dust 743.89
26 Sand for Filling 32 369.67 560.00 0.00 0.00 0.00 929.67
27 Gravel 10 129.38 103.00 0.00 0.00 0.00 232.38
28 Cement 5600.00 5600.00
29 Steel HYSD Bars 31000.00 31000.00
30 Mild Steel Bars 37500.00 37500.00
31 6mm Steel 34000.00 34000.00
Deduct
Machine
Source of Lead in Blasting stacking Toal Cost
Sl.No Description of Metal Supply Kms
Conveyance Initial cost
charges
crushing
charges for per Cum
charges
conveyance
PIPE CULVERT
23 Hume pipes 800mm Dia., NP4 50 335 4598.10 4933.10
24 Hume pipes 900mm Dia., NP4 50 563.25 5723.27 6286.52
25 Hume pipes 1000mm Dia., NP4 50 595.25 7813.58 8408.83
26 Hume pipes 1200mm Dia., NP4 50 647.25 10688.58 11335.83
FIXING OF HM,KM,5th KM,GUARD STONES & SIGN BOARDS

1). HM STONES: [MoRT&H Sr.No. 8.14(iii)


Taking Out-put: 33 No.s
a). Labour:
Mate Day 0.34 450.00 153
Mason Day 1.50 450.00 675
828

b). Over Heads @ 5% on (a) 41.40

c). Contractor's Profit @ 10% on (a+b) 86.94

Labour charges per 33 No.s of HM stones (a+b+c) 956.34

Labour charges per HM stone (a+b+c)/33 28.98

(i). Labour charges per HM stone: 28.98


(ii). Earth work excavation: Cu.m 0.142 392.52 55.74
(iii). PCC (1:4:8): Cu.m 0.126 3761.84 473.99
Rate for Fixing of HM Stone: 558.71

say 559.00

2). KM STONES: [MoRT&H Sr.No. 8.14(ii)


Taking Out-put: 14 No.s
a). Labour:
Mate(Page No 8 of SSR 2014-15) Day 0.32 450.00 144
Mason(page No 6 SSR 2014-15) Day 1.00 450.00 450
594

b). Over Heads @ 5% on (a) 29.70

c). Contractor's Profit @ 10% on (a+b) 62.37

Labour charges per 14 No.s of KM stones (a+b+c) 686.07

Labour charges per KM stone (a+b+c)/14 49.01

(i). Labour charges per KM stone: 49.01


(ii). Earth work excavation: Cu.m 0.189 392.52 74.19
(iii). PCC (1:4:8): Cu.m 0.162 3761.84 609.42
Rate for Fixing of KM Stone: 732.61
say 733.00

3). 5th KM STONES: [MoRT&H Sr.No. 8.14(i)


Taking Out-put: 6 No.s
a). Labour:
Mate(Page No 8 of SSR 2014-15) Day 0.26 450.00 117
Mason(page No 6 SSR 2014-15) Day 0.60 450.00 270
387

b). Over Heads @ 5% on (a) 19.35

c). Contractor's Profit @ 10% on (a+b) 40.64

Labour charges per 6 No.s of 5th KM stones (a+b+c) 446.99


Labour charges per 5th KM stone (a+b+c)/6 74.50

(i). Labour charges per 5th KM stone: 74.50


(ii). Earth work excavation: Cu.m 0.202 392.52 79.29
(iii). PCC (1:4:8): Cu.m 0.173 3761.84 650.80
Rate for Fixing of 5th KM Stone: 804.58

4). GUARD STONES: [MoRT&H Sr.No. 8.14(i)


Taking Out-put: 23 No.s
a). Labour:
Mate(Page No 8 of SSR 2014-15) Day 0.33 450.00 148.5
Mason(page No 6 SSR 2014-15) Day 1.25 450.00 562.5
711

b). Over Heads @ 6% on (a) 42.66

c). Contractor's Profit @ 10% on (a+b) 75.37

Labour charges per 23 No.s of Guard stones (a+b+c) 829.03

Labour charges per Guard stone (a+b+c)/23 36.04

(i). Labour charges per Guard stone: 36.04


(ii). Earth work excavation: Cu.m 0.150 392.52 58.88
(iii). PCC (1:4:8): Cu.m 0.132 3761.84 496.56
Rate for Fixing of Guard Stone: 591.48

5). SIGN BOARDS: [MoRT&H Sr.No. 8.14(iii)


Taking Out-put: 33 No.s

a). Labour: Mate(Page No 8 of SSR 2014-15)Day 0.34 450.00 153


Mason(page No 6 SSR 2014-15) Day 1.50 450.00 675
828

b). Over Heads @ 5% on (a) 41.40

c). Contractor's Profit @ 10% on (a+b) 86.94

Labour charges per 33 No.s of Sign Boards (a+b+c) 956.34

Labour charges per Sign Board (a+b+c)/33 28.98

(i). Labour charges per Sign Board: 28.98


(ii). Earth work excavation: Cu.m 0.054 392.52 21.20
(iii). PCC (1:4:8): Cu.m 0.054 3761.84 203.14
Rate for Fixing of One Sign Board: 253.32

EARTH WORK EXCAVATION [MoRT&H Sr.No. 3.13]

Taking Out-put : 10 Cu.m

a). Labour:
Mate Day 0.32 370.00 118.4
Mazdoor Day 8.00 410.00 3280
3398.4

b). Over Heads @ 5% on (a) 169.92

c). Contractor's Profit @ 10% on (a+b) 356.83


Earth work per 10 Cu.m (a+b+c) 3925.15
Rate of Earth work per One Cu.m (a+b+c)/10 392.52

P.C.C (1:4:8)

Taking Out-put : 1 Cu.m

a). Material:
40mm Metal: Cu.m 0.9 766.55 689.90
Sand: Cu.m 0.45 1222.73 550.23
Cement: Cu.m 0.116 4750.00 551.00
1791.12
b). Labour:
Mason 1st. Class No.s 0.06 500 30.00
Mason 2nd Class No.s 0.14 450 63.00
Man Mazdoor No.s 1.8 425 765.00
Women Mazdoor No.s 1.4 425 595.00
1453.00
c). Hand Mixing: Cu.m 0.46 28 12.88

d). Over Heads @ 5% on (a+b+c) 162.85

e). Contractor's Profit @ 10% on (a+b+c+d) 341.99

Rate of PCC (1:4:8) per Cu.m (a+b+c+d+e) 3761.84

FOUNDATION QUANTITIES- EARTH WORK & PCC(1:4:8) FOR FIXING OF HM,KM,5th


KM, GUARD STONES AND SIGN BOARDS

1). HM STONES:

115mm

335mm

150mm 450mm G L

450mm
225mm
525mm 600mm

PCC(1:4:8) 225mm
150mm

525mm

(i). Earth work:


0.525 0.450 0.600 0.142
(ii).PCC(1:4:8):
Bottom 0.525 0.450 0.150 0.035
Around Stone 0.525 0.450 0.450 0.106
Deduct Stone portion 0.225 0.150 0.450 0.015
Total (cu.m): 0.127

2). KM STONES:
200mm

450mm
150mm 450mm G L

400 mm
450mm
700mm

400 mm
PCC(1:4:8) 150mm

700mm

(i). Earth work:


0.700 0.450 0.600 0.189
(ii).PCC(1:4:8):
Bottom 0.700 0.450 0.150 0.047
Around Stone 0.700 0.450 0.450 0.142
Deduct Stone portion 0.400 0.150 0.450 0.027
Total (cu.m): 0.162

3). 5th KM STONES:


250mm

650mm

150mm 450mm G L

450 mm
450mm
750mm

450 mm
PCC(1:4:8) 150mm

750mm

(i). Earth work:


0.750 0.450 0.600 0.203
(ii).PCC(1:4:8):
Bottom 0.750 0.450 0.150 0.051
Around Stone 0.750 0.450 0.450 0.152
Deduct Stone portion 0.450 0.150 0.450 0.030
Total (cu.m): 0.172
4). GUARD STONES:

750mm

200mm 500mm G L

200mm
450mm
500mm

200mm
PCC(1:4:8) 150mm

500mm

(i). Earth work:


0.500 0.500 0.600 0.150
(ii).PCC(1:4:8):
Bottom 0.500 0.500 0.150 0.038
Around Stone 0.500 0.500 0.450 0.113
Deduct Stone portion 0.200 0.200 0.450 0.018
Total (cu.m): 0.132

5)SIGN BOARDS:

(i). Earth work: cu.m


0.300 0.300 0.600 0.054
(ii).PCC(1:4:8):
Around the Post: cu,m 0.300 0.300 0.600 0.054
PAINTING TWO COATS ON NEW CONCRETE SURFACE [MoRT&H Sr. No. 8.8]

Taking Out-put: 40 Sq.m

a). Labour:
Mate Day 0.12 450.00 54.00
Painter Day 2.00 540.00 1080.00
Mazdoor Day 1.00 425.00 425.00
1559.00
b). Material:
Paint(M-131 BSR 2015-16) Litre 6.00 255.00 1530.00

c). Add 5% on (a+b) to cover Primer coat etc., 154.45

d).Over Heads @ 5% on (a+b+c) 162.17

e). Contractor's Profit @ 10% on (a+b+c+d) 340.56

Two coats of Painting Rate per 40 sq.m (a+b+c+d+e) 3746.18

Two coats of Painting Rate per sq.m (a+b+c+d+e)/40 93.65

LETTERING [MoRT&H Sr.No. 8.3 (ii)

Taking Out-put: 1600 cm

a). Labour:
Mate Day 0.07 450.00 31.50
Painter Day 1.25 540.00 675.00
Mazdoor Day 0.50 425.00 212.50
919.00
b). Material:
Paint(M-131 BSR 2015-16) Litre 0.50 255.00 127.50

c).Over Heads @ 5% on (a+b) 52.33

d). Contractor's Profit @ 10% on (a+b+c) 109.88

Lettering Rate per cm. ht. per letter 1600 sq.m (a+b+c+d) 1208.71

Lettering Rate per cm. ht. per letter (a+b+c+d)/1600 0.76

SURFACE AREAS OF HM,KM & 5th KM STONES:

1). HM STONES:
2 0.335 0.225 0.151
2 0.335 0.150 0.101
2 3.143 0.115 0.115 0.500 0.042
1 3.143 0.115 0.150 0.054
Surface Area of HM Stone (Sq.m): 0.347

2). KM STONES:
2 0.450 0.400 0.360
2 0.450 0.150 0.135
2 3.143 0.200 0.200 0.500 0.126
1 3.143 0.200 0.150 0.094
Surface Area of KM Stone (Sq.m): 0.715

3). 5th KM STONES:


2 0.650 0.450 0.585
2 0.650 0.150 0.195
2 3.143 0.250 0.250 0.500 0.196
1 3.143 0.250 0.150 0.118
Surface Area of 5th KM Stone (Sq.m): 1.094

Painting Areas

5th KM stones 1.094 x 93.65 = 102.46


KM stones 0.715 x 93.65 = 66.96
HM stones 0.347 x 93.65 = 32.50

Amount for Lettering


5th KM stones 49 Nos x 7.00 = 343.00
KM stones 28 Nos x 5.30 = 148.40
HM stones 6 Nos x 5.30 = 31.80

Total Rate for Painiting


5th KM stones 102.46 + 343.00 = 445.46
KM stones 66.96 + 148.40 = 215.36
HM stones 32.50 + 31.80 = 64.30
"A.M to Guthpa village to NH-16 (Via) Ramchandrapally road from Km 0/0 to
Name of Work:- 3/7 in Nizamabad district Year 2018-19"

(A) .WEIGHTED AVERAGE LEAD FOR CRUSHER

(i) On Gundaram road at Km 1/5

a) Cart Track 1.10 x 0.20 = 0.22 km


b) On NH-16 road km 12.20 to km 14.40 = 2.20 km
km
d) Site Spreads in km 0.00 to km 3.70
e) Site average Lead (3.7 - 0) /2 = 1.85 km
Total Lead = 4.27 km
.WEIGHTED AVERAGE LEAD SAY = 4.00 km
(B). WEIGHTED AVERAGE LEAD FOR BITUMEN ( REFINERY AT MUMBAI)

(i) Mubai
a) Mubai to NN road 0.00 to km 676.00 = 676.00 km
b) NH -16 road 0.00 to km 14.40 = 14.40 km

c) Site Spreads in km 0.00 to km 3.70


d) Site average Lead (3.7 - 0) /2 = 1.85 km
Total Lead = 692.25 km
.WEIGHTED AVERAGE LEAD SAY = 692.00 km
(B). WEIGHTED AVERAGE LEAD FORSAND

(i) NN road atKm 40/2


a) Cart Track 1.10 x 0.20 = 0.22 km
b) On NN road 0.00 to km 40.20 = 40.20 km
On NH- 16 road 0.00 to km 14.40 = 14.40 km

c) Site Spreads in km 0.00 to km 3.70


d) Site average Lead (3.7 - 0) /2 = 1.85 km
Total Lead = 56.67 km
.WEIGHTED AVERAGE LEAD SAY = 57.00 km

0
0
Assistant Engineer Dy. Executive Engineer Executive Engineer (R&B)
R&B Section, Makloor. R&B Sub-Division,Armoor (R&B)Division, Nizamabad