Project : Assiut Hydrocracking Complex

Location : Flare Area Borehole No : BH-214-PZ


Project No : 5598 Standpipe Piezometer No :2 – Length 26.0 m

Coordinates : 300391/3009851
Ground elevation: m
Borehole dia. : 115 mm

0.00 m
Piezometer Installation details
Date installation starts:06/12/2020
Cement
1.00 m Date Installation completed: 06/12/2020

Sand

Type of protection and cover


Standpipe flush to ground/ Extending above ground
Metal casing with lockable lid : YES
Ht. of PVC standpipe above ground 0.50
m Ht. of metal casing above ground : 0.60
cm Ground Water Level ( GWL) : N/A
m

Details of Materials used in the Piezometer


0.00-14.00 m Layer 1: Top concrete/Bentonite
Plain PVC Lay er 2: San d/ G rav el b ackf ill

Lay er 3: B en t o ni t e Pell et s

Lay er 4: G r avel Pa ckin g


Layer 5: Bentonite pellets

14.00 m Top of Bentonite plug


Bentonite

14.00 m Slotted section, Top depth

Gravel Details of PVC standpipe Diameter 3”


23.00 m Bottom of Slotted section Width of slots: 1.00 mm
Covered with Geotextile membrane: Yes
Bent onite
26.00 m Base depth of standpipe
D etails of G eo tex tile me m br a ne

40.00 m
Borehole Depth N on W ov en , Tens ar T2 0

Prepared by: MH Reviewed by: Lorinzo