You are on page 1of 1

BORING LOG

PROJECT NUMBER: P0018880-1 BORING No.: BH9

SITE LOCATION: - Alexandria DRILLING METHOD: Dry Rotary Drilling

PREPARED BY: Tarek Yasser DATE: 28/2/2020 to 28/2/2020


LENGTH: 3 m
Water Level in Borehole: 0.9 m
Weather Condition: Moderate weather, partially cloudy, No rain.

SAMPLE NUMBER
Moisture Content
DEPTH (m)

SOIL DESCRIPTION NOTES

ENV 1 A
ENV 1 B Dense, brown, fine to medium silty clayey 28/2/2020
Moist ENV 1 C SAND, traces of firm peat and organic 01:55 pm
ENV 1 D matter, traces of gravel, calcareous
ENV 1 E fragments

1.0

ENV 2 A
ENV 2 B Firm, brown, sandy SILT, traces of peat, 28/2/2020
Wet ENV 2 C organic matter, traces of gravel, calcareous 02:10 pm
ENV 2 D fragments
ENV 2 E

2.0

ENV 3 A
ENV 3 B Very stiff, brown, clayey sandy SILT, traces of 28/2/2020
Wet ENV 3 C peat, organic matter, traces of gravel, 02:30 pm
ENV 3 D calcareous fragments
ENV 3 E

3.0

You might also like