TEST CERTIFICATE OF MAIN BUS BAR AKSHAR LEEPANT


Client M/S. RELIANCE INDUSTRIES LTD., ASOJ Tested On 20/01/2022
Plant FIRE SUBSTATION Tested By MRUGESH
Location MAIN LT PANEL Comp. Code

1.0 CONTACT RESISTANCE TEST: (ALL VALUES IN µΩ)


JOINT (Values in µΩ) R Y B N
BUSBAR (2 joints) 37.0 42.3 48.0 51.0

2.0 INSULATION RESISTANCE TEST OF MAIN BUS BAR:


IR VOLTAGE APPLIED: 0.5 KV, Range : 0‐5T , Time (sec): 60
REFERENCE R‐Y Y‐B B‐R R‐E Y‐E B‐E
Values in G‐ 5.2 5.2 5.2 1.87 2.79 2.33

3.0 REMARKS : TESTED OK.

Date Date Date 20/01/2022


Witness by Witness by Prepared by NOEL
Sign Sign Sign
AKSHAR ELECINFRA PVT LTD