P a g e | 38

TEST CERTIFICATE OF O/C & E/F RELAY AKSHAR ELECINFRA PVT. LTD.
Client M/S. RELIANCE INDUSTRIES LTD., ASOJ Tested On 20/01/2022
Plant MAIN FIRE SUBSTATION Tested By MRUGESH
Location INCOMER‐1 Comp. code ‐

1.0 NAME PLATE DETAILS :


MAKE TYPE MODEL NO SR. NO. CT RATIO AUX. VOLT.
SIEMENS 7SR1206 2MA12‐CA0/FF GF2104500167 200/1 A 110V DC

2.0 SERVICE SETTING :


SETTING PARAMETER SERVICE SETTING
OVER CURRENT
50 Measurement RMS
51 Measurement RMS
51‐1 Directional Control Non‐Directional
51‐1 Element Enable
51‐1 Setting 0.80 In
51‐1 Characteristic IEC‐NI
51‐1 Time Setting Multiplier 0.50
51‐1 Minimum Operating Time 0.0 sec
50‐1 Element Enable
50‐1 Directional Control Non‐Directional
50‐1 Setting 5.00 In
50‐1 Delay 0.05 sec
EARTH FAULT
51G Measurement RMS
51G‐1 Element Enable
51G‐1 Directional Control Non‐Directional
51G‐1 Setting 0.10 In
51G‐1 Characteristic IEC‐NI
51G‐1 TMS 0.50
51G‐1 Minimum Operating Time 0.0 Sec
51G‐1 Element Enable
51G‐1 Directional Control Non‐Directional
51G‐1 Setting 0.25 In
51G‐1 TMS 0.04

Date 20/01/2022 Date 20/01/2022 Date 20/01/2022


DILIP
Witness by RIL Witness by MRUGESH SHAH Prepared by NOEL
PARMAR
Sign Sign Sign
AKSHAR ELECINFRA PVT. LTD.
P a g e | 39

2.1 TIME CURRENT CHARACTERISTICS TEST (I>) : NORMAL INVERSE


PS Operating time in seconds
RYB PSM TMS = 0.500
Amp R Y B
2 4.930 4.954 4.966
0.80 5 2.301 2.305 2.304
10 1.487 1.463 1.444

2.2 INSTANTANEOUS UNIT TEST (I>>) :


Current setting Operating Operating Operation
Set time in sec.
In Amp Current in Amp time in sec. indicator
R Y B R Y B R Y B R Y B R Y B
5.0 5.0 5.0 5.01 5.02 5.02 0.05 0.05 0.05 0.062 0.063 0.062 OK OK OK

2.4 TIME CURRENT CHARACTERISTICS TEST (Ie>) : NORMAL INVERSE


PS Operating time in seconds
PSM
(AMP) TMS = 0.50
2 5.01
0.1 5 2.14
10 1.49

2.5 INSTANTANEOUS UNIT TEST (Ie>>) :


SET CURRENT (AMP) OPR. CURRENT (AMP) SET TIME (SECS) OPR. TIME (SECS) OPER. INDI.
0.25 0.27 0.040 0.042 OK

3.0 GENERAL CHECK – UP :


3.1 INSPECTION FOR PHYSICAL DAMAGE NO
3.2 WIRING CHECK OK
3.3 CLEANING AND PRESSURE OF CONTACTS OK
3.4 SERVICE SETTING RESTORED OK
3.5 RE‐SETTING OF FLAGS WITH COVER OK
3.6 CT SHORTING CONTACT IN RELAY CASE OK

4.0 REMARKS : TESTED OK.

Date 20/01/2022 Date 20/01/2022 Date 20/01/2022


DILIP
Witness by RIL Witness by MRUGESH SHAH Prepared by NOEL
PARMAR
Sign Sign Sign
AKSHAR ELECINFRA PVT. LTD.