AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 01 Feb 2020


Day : Saturday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
01 Feb 2020
Date

01 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory :

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 02 Feb 2020


Day : Sunday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
02 Feb 2020
Date

02 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 03 Feb 2020


Day : Monday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)

0.0151
03 Feb 2020
Date

03 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 04 Feb 2020


Day : Tuesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)

0.0151
04 Feb 2020
Date

04 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 05 Feb 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)

0.0151
05 Feb 2020
Date

05 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Sampling of segmental glue (Fosroc nitobond PC-40)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 06 Feb 2020


Day : Thursday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)

0.0151
06 Feb 2020
Date

06 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 07 Feb 2020


Day : Friday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)

0.0151
07 Feb 2020
Date

07 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory :

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 08 Jan 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
08 Jan 2020
Date

08 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory :

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 09 Feb 2020


Day : Sunday
Work Shift : Day/Night

Dry Temperature 31 o
C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
09 Feb 2020
Date

09 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory ;

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 10 Feb 2020


Day : Monday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

0.0151
10 Feb 2020
Date

10 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
Witness Batching plant calibration STP (PB1 & PB2)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 11 Feb 2020


Day : Tuesday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)

0.0151
11 Feb 2020
Date

11 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Witness batching plant Calibration at Belapur (PB-02)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 12 Feb 2020


Day : Wednesday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

02) Ankit (ME)


Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
12 Feb 2020
Date

12 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Witness Batching plant calibration at Belapur (PB-01)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 13 Feb 2020


Day : Thursday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
13 Feb 2020
Date

13 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 14 Feb 2020


Day : Friday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
14 Feb 2020
Date

14 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)
CTM calibration (3000 Kn) witness

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 15 Feb 2020


Day : Saturday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
15 Feb 2020
Date

15 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testing a
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 17 Feb 2020


Day : Monday
Work Shift : Day/Night

Dry Temperature 31 o
C

ther material testing at lab) Ankit (ME)


Ankit (ME)
egisters) Ankit (ME)
Ankit (ME)

0.0151
17 Feb 2020
Date

17 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory : Routine material testing work ( Cube test ,sieve analysis and other material testin
Checking of concrete dispatched from Batcing plant to site
Checking of material testing records (As per Master list of Registers)

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 18 Jan 2020


Day : Saturday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

nd other material testing at lab) Ankit (ME)


te Ankit (ME)
f Registers) Ankit (ME)
Ankit (ME)

0.0151
18 Jan 2020
Date

18 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 19 Feb 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
19 Feb 2020
Date

19 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory :

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 20 Feb 2020


Day : Thursday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
20 Feb 2020
Date

20 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory :

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 21 Feb 2020


Day : Friday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
21 Feb 2020
Date

21 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory :

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 22 Feb 2020


Day : Saturday
Work Shift : Day/Night

Dry Temperature 31 o
C

Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
22 Feb 2020
Date

22 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory :

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 23 Feb 2020


Day : Sunday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
23 Feb 2020
Date

23 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory :

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 24 Feb 2020


Day : Monday
Work Shift : Day/Night

Dry Temperature 31 o
C

Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
24 Feb 2020
Date

24 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 25 Feb 2020


Day : Tuesday
Work Shift : Day/Night

Dry Temperature 31 o
C

0.0151
25 Feb 2020
Date

25 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory:

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 26 Feb 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
26 Feb 2020
Date

26 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory :

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 27 Feb 2020


Day : Thursday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
27 Feb 2020
Date

27 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 28 Feb 2020


Day : Friday
Work Shift : Day/Night

Dry Temperature 31 o
C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
28 Feb 2020
Date

28 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory :

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 29 Feb 2020


Day : Saturday
Work Shift : Day/Night

Dry Temperature 31 o
C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
29 Feb 2020
Date

29 Feb 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory :

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 30 Jan 2020


Day : Thursday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
30 Jan 2020
Date

30 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN DAILY DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Site Laboratory :

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Ankit Bisalpure
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 31 Jan 2020


Day : Friday
Work Shift : Day/Night

Rainfall Dry Temperature 31 o


C

Ankit (ME)
Ankit (ME)
Ankit (ME)
Ankit (ME)

0.0151
31 Jan 2020
Date

31 Jan 2020
Date

You might also like