Professional Documents
Culture Documents
Interchange
Castingyard
Marine
Others
The above described work was incorporated into this project
Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :
Dry Temperature 31 o
C
01 Jan 2020
Date
01 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
C1P30 intermediare pier cap checked..(rectification is in progress)
MP 52 S2 Pile protection cage checked…
MP 142 N2 CAGE CHECKED…
Castingyard
Marine
Others
Dry Temperature 31 o
C
raju
raju
raju
raju
Harteg
mikhail
mikhail
raju
raju
raju
raju
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
Harteg
02 Sep 2020
Date
02 Sep 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
C1P 30TYPE 2 PIER CAP REINFORCEMENT CHECKED BUT AGAIN NOT CLEARED @4.50PM
Marine
Others
Dry Temperature 31 o
C
MIKHAIL
Harteg
raju
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
Harteg
raju
raju
Nagendra
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
raju
03 Sep 2020
Date
03 Sep 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
AP43W,BP37SE,AP41A-S,AP41A-E,AP41A-W,AP41B-E CHSL test started@10.30am-End@3.31pm
LPN05 Pier reinforcement checking done@3.45pm
LPS11 Pier reinforcement checking done@3.47pm
C2P2 pilecap grouting started@4.34pm
C2P2 Pile cap pre-pour inspection
C2A1 pier post pour checking
C2BH2. GTI soil sampling
FPO3E flushing&concreting witnessed@5.45am
C2P2 pilecap concreting completed@3.54am
Castingyard
MP 17-18 NS01 Segment bottom checking done@9.55am
MP 16-17 NS01 Segment Post-Pour chceking done@10.07am
MP 19-20 NS15 Segment Cage checking done@11.54am
MP14-15 SS10 Segment reinforcement
MP22-23 NS14 Segment post pour inspection
MP 20-21 NS 15 segment Top PT profile & pre pour inspection
MP 22-23NS09 bottom profile inspetion done@3.34am
MP 22-23NS09 PRE POUR inspection done found okay@6.50am
MP 20-21 NS 15 segment concreting started@5am
MP17-18 NS1 PIER HEADsegment Top PT profile & pre pour inspection permitted for concreting@4.13am
MP 22-22NS05 Cage reinforcement checking done@2.00am
Marine
MP123 S2 cage reinforcement checking done@3.40am
Others
Dry Temperature 31 o
C
Pudhvi
Pudhvi
Pudhvi
Harteg
Harteg
raju
raju
1pm Pudhvi
Pudhvi
Pudhvi
Pudhvi
Harteg
Harteg
Harteg
raju
raju
Pudhvi
Pudhvi
Pudhvi
Harteg
Harteg
Harteg
raju
raju
raju
@4.13am raju
raju
raju
04 Jan 2020
Date
04 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
Castingyard
Marine
Others
Dry Temperature 31 o
C
43835
Date
05 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
C1P26 pier reinforcement checking done@ 4.08pm
LP05S PIER concreting witnessd@9.36PM
LP06 pilecap concreting witnessed@7.34pm
FP05 W pile concreting started@12.38am
FP05 W pile concreting completed@3.22am
Casting yard
MP16-17 NS19 Bulkhead checking done
MP16-17 NS19 PH segment cage reinforcement checking done listed observations@5.44pm
MP 14 15 NS10 pre pour inspection &permitted for concreting@5.31pm
MP 21-22 NS5 cage reinforcement checking done @7.00pm
MP 14-15 SS11cage reinforcement checking done @7.10pm
MP 20-21NS17 cage reinforcement checking done @7.15PM
MP 14-15 SS10 Concreting done @11.20pm
MP19-20 NS 15 bottom profile checking done@1.34Am
MP22-23 NS 08 bottom profile checking done@5.13Am
Marine
Others
Dry Temperature 31 o
C
RAJU
nagendra
nagendra
nagendra
RAJU
RAJU
RAJU
nagendra
nagendra
RAJU
RAJU
RAJU
RAJU
RAJU
RAJU
nagendra
nagendra
nagendra
06 Jan 2020
Date
06 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
AP38 E cage checking Done @11.05pm
AP38 W cage checking Done @11.07pm
LPN06 pier starter reinforcement checking done@11.32pm
LP6 pile cap post pour checking done@2.01am
Castingyard
MP19-20 NS15 segment concreting started @10.43pm
MP20-21 NS16 concreting started@3.47am
MP20-21 NS16 concreting completed@6.15am
MP21-20 NS05 concreting started@6.45am
MP 19-20NS16 cage reinforcement checking done@3.52pm
MP19-20 NS15 pre pour inspection done @6.11pm
mp22-23ns08 segment concrete completed@10.13pm
Marine
MP133N2 cage checking donefound okay@6.54pm
Others
Dry Temperature 31 o
C
nagendra
nagendra
raju
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
raju
raju
raju
raju
07 Jan 2020
Date
07 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
C1P26 pier concreting completed@2.02am
FP04E concreting started@3.53am
FP04E concreting completed@4.53am
LPN-05 pier concreting started@12.35am
LPN-05 pier concreting completed@4.51am
LP N & S pier starter concreting started@5.05am
LP 6N&S pier starter pre pourinspection completed@6.37pm
LP5 pier pour inspection done@7.15pm
Castingyard
MP14-15 SS11 bottom profile checking done@10.49pm
MP14-15 SS11 pre pour checking done@3.24am
MP16-17 NS 19 concreting started@6.00am
MP 19-20 NS19 EJ Pier head segment reinforcement checking done@4.36pm
MP22-23NS06 cage reinforcement checking done@4.57pm
MP19-20NS19 bulk head checking done
Marine
Others
Dry Temperature 31 o
C
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
raju
raju
nagendra
nagendra
nagendra
raju
raju
raju
08 Jan 2020
Date
08 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
LPS5& LPS11 pier post pour inspection done@3,07pm
AP42 pile cap PCC started@11.19pm
C2P26 pier post pour checking done@1.41am
LPN 11 pier concreting started@2.05am
LPN 11 pier concreting completed@6.05am
Castingyard
MP 19-20 NS1 pier head segment temp bulkhead profile cordinate@4.07pm
MP22-23NS07 BOTTOM profile checking done@6.10pm
MP 20-21 NS15 &NS16 post pour inspection completed@6.20pm
MP20-21 NS17 bottom profile checking done@10.51pm
MP22-23NS07 pre pour checking done@11.02pm
MP22-23 concreting started@12.28am
MP22-23 concreting completed@2.06am
MP21-22 NS05 post pour checking done@3.05am
MP20-21 NS17 top pofile and pre pour checking done@6.07am
MP19-20 bottom profile checking done@6.37am
Marine
Others
Dry Temperature 31 o
C
raju
Nagendra
Nagendra
Nagendra
Nagendra
Nagendra
Nagendra
Nagendra
raju
Nagendra
Nagendra
Nagendra
Nagendra
raju
raju
raju
Nagendra
Nagendra
Nagendra
Nagendra
Nagendra
Nagendra
Nagendra
09 Jan 2020
Date
09 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
LP04 pile group grouting started@11.56pm
LP04 pile group grouting completed@3.00am
Castingyard
MP14-15 SS12 concreting started@2.43am
MP21-22 NS15 concreting started@5.06am
MP14-15 SS12 concreting completed@5.02am
MP21-22 NS15 concreting started@7.13am
MP21-22 NS15 top and pre pour checking done@2.27am
MP14-15 SS12 pre pour checking done@1.54am
MP 18-19 NS1 PHsegment reinforcement checking done@5.15PM
MP21-22 NS15 Bottom profile checking done@5.47pm
MP 19-20 NS16 PRE pour inspection done @6pm
MP 19-20 NS16 concreting witnessed@9.38pm
MP14-15 SS12 bottom profile checking done@9.37pm
MP 20-21 NS18 segment reinforcement checking done@8.28PM
Marine
MP122N2 cage checking done@1.49am
Others
Dry Temperature 31 o
C
nagendra
nagendra
nagendra
raju
raju
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
Raju
Raju
Raju
Raju
Raju
Raju
nagendra
10 Jan 2020
Date
10 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
LPS01 Pier pre pour checking done @10.16pm
FP04W flushing started@11.13pm
LPS01 Pierconcreting started @11.37pm
AP42 pile group Grouting started@12.24am
FP04W concretinf started@3.14am
LPS01 Pier concreting completed @3.30am
FP04W concretinf completed@5.00am
LP02 pile cap PCC concreting Started@5.10am
LP02 pile cap PCC concreting completed@6.30am
FP08 E&W FPO9E&W chsl test witnessed@10.47am
FP04W flushing & soumding witnesed@11am
Castingyard
MP 20-21 NS18 bottom profile checking done@10.55pm
MP22-23 NS06 top profile & pre pour checking done@12.03am
MP22-23 NS06 concreting started@01.35am
MP 20-21 NS18 top and pre pour checking done @2.56am
MP22-23 NS06 concreting completed@3.25am
MP20-21 NS18 concreting started@3.52am
MP20-21 NS18 concreting completed@6.00am
MP14-15 SS11 post pourinspection done@2.24pm
MP22-23 NS06 bottom profile inspection done@4.15pm
MP 20-21ns4 cage reinforcement checking done
MP 14-15 SS13 cage reinforcement checking done
MP 21-22 NS17 CAGE reinforcement inspection
MP 19-20ns2 CAGE reinforcement inspection
Marine
Others
Dry Temperature 31 o
C
raju
raju
raju
raju
raju
raju
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
raju
raju
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
raju
raju
raju
raju
raju
raju
11 Jan 2020
Date
11 Jan 2020
Date
BF43:BF68
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
Castingyard
MP19-20 NS17 pre pour &concreting witnessed@5.15pm
Marine
Others
Dry Temperature 31 o
C
raju
12 Jan 2020
Date
12 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
AP42 Pile cap bottom reinforcement checking
LP-04 pile cap concreting
LPN-11 pier starter post pour inspection done@2.52pm
Castingyard
MP13-14 NS7 lifting in progress
MP19-20 NS19 EJ Segment Concreting
MP21-22 NS16 Segment Pre pour checking
MP21-22 NS16 Segment Concreting
MP14-15 SS 13 Segment Concreting
MP 21-22NS05 post pour inspection done
MP 22-23NS07 Post pour inspection done
MP 16-17NS19 Post pour inspection done
MP 20-21NS17 Post pour inspection done
MP 14-15SS12 Post pour inspection done
MP 22-230NS06 Post pour inspection done
MP 21-22NS15 post pour inspection done
mp 18-19 NS01 ph pre pour inspection done
Marine
Others
Dry Temperature 31 o
C
Harteg
Harteg
Harteg
Harteg
raju
Harteg
Harteg
raju
Harteg
Harteg
Harteg
Harteg
Harteg
raju
raju
raju
raju
raju
raju
raju
raju
13 Jan 2020
Date
13 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
LP4 pile cap coal tar epoxy allowed
LP04 pile cap post pour inspection
C1P27 Pile cap PCC is in progress
LP-02 pile cap PCC concrete
LPN4 AND LPS4 PIER STARTER Reinforcement checking
Castingyard
MP-20-21/NS4 Segment pre pour inspection
MP-20-21/NS4 Segment bottom PT profile checking
MP 20-21 NS18 POST pour inspection done
MP 19-20 NS16 POST pour inspection done
MP 17-18 NS01 POST pour inspection done
MP 19-20 NS17 POST pour inspection done
mp 19-20 ns4 Bottom profile inspection
Marine
Others
Dry Temperature 31 o
C
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
raju
raju
raju
raju
raju
14 Jan 2020
Date
14 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
MP 42 pilecap pre pour inspection
AP 39SW cage reinforcement inspection
Castingyard
MP 20-21 ns4 concreting witnessed
MP 22-23NS05 pre pour inspection done
MP 21-22NS16 post pour inspection done
MP14-15 SS13 post pour inspection done
MP 22-23 NS05 segment concrete inspection
Marine
Others
Dry Temperature 31 o
C
RAJU
RAJU
RAJU
RAJU
RAJU
RAJU
RAJU
RAJU
RAJU
15 Jan 2020
Date
15 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Castingyard
MP 21-23 NS4 segment cage reinforcement inspection
FP-10 E&W EP29E&W chsl test started
MP 19-20NS3 bottom profile & cover checking done
MP20-21 NS03 Segment concreting
MP-22-23/NS5 POST POUR INSPECTION
MP-20-21/NS3 Pre pour inspection
MP17-18 NS19 Pre pour inspection
Marine
MP 122 S2 cage reinforcement inspection
Others
Dry Temperature 31 o
C
raju
raju
raju
Harteg
Harteg
Harteg
raju
Harteg
Harteg
Harteg
Harteg
Harteg
raju
raju
raju
Harteg
Harteg
Harteg
Harteg
raju
16 Jan 2020
Date
16 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
ap 42 pier starter pre pour inspection done
C1P25 pilecap bottom reinforcement checking done
FP5 E&W CHSL TEST witnessed
INTERCHANGE LPN06 PIER Concreting
Sonic tube grouting of LP-02 pile cap
LP2 pile group sonic pipe grouting
Castingyard
MP 21-22NS17 [Post pour inspection done
MP14-15 ss14 Post pour inspection done
MP-14-15/SS9 Pre-pour inspection
MP-14-15/SS9 Bottom profile checking
MP-21-22/NS18 Top profile checking
MP-21-22/NS18 Pre-pour inspection
Marine
Others
Dry Temperature 31 o
C
raju
raju
raju
Harteg
Harteg
Harteg
raju
raju
raju
Harteg
Harteg
Harteg
raju
raju
Harteg
Harteg
Harteg
Harteg
17 Jan 2020
Date
17 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
LPN06 pier concreting completed
C1P25 pilecap pre pour inspection done
LPS3 pier post pour inspection done
C1P25 pile cap concreting
LP02 pile cap bottom reinforcement checking
MP-19-20/NS2 Top profile checking
MP-19-20/NS2 Pre-pour inspection
Castingyard
MP 22-23 NS15 Segment pre pour &profile inspection concreting witnessed
MP 15-16 NS01 post pour after rectification work
MP 21-22 NS18 concreting witnessed
MP 14-15 SS09 concreting witnessed
MP 22-23 NS01 cage reinforcement checking done
MP 17 S PH reinforcement checking done
MP 19-20 NS3 post pour inspection
MP 15-16 SS11 cage reinforcement checking
MP 21-23 NS03 cage reinforcement checking done
MP-20-21/NS2 Bottom profile checking
Marine
Others
Dry Temperature 31 o
C
raju
raju
raju
Harteg
Harteg
raju
raju
raju
Harteg
Harteg
Harteg
Harteg
raju
raju
raju
raju
raju
raju
raju
raju
raju
Harteg
18 Jan 2020
Date
18 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
Castingyard
Marine
Others
Dry Temperature 31 o
C
19 Jan 2020
Date
19 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
C1P25 pier starter reinforcement inspection done
LP1N PIER concreting witnessed
LP6s PIER concreting witnessed
AP37(N) Pile concreting
Ap 37N pile sounding check
Coal tar epoxy application on C1P25 pile cap started
C2BH6 GTI borehole inspection
Castingyard
MP 14-15SS8 Pre pour inspection & concreting
MP 21-22ns04 Pre pour inspection & concreting
MP-13-14/SS10 Rebar cage checking
MP14-15 SS9 Segment post pour inspection
MP21-22 NS18 Segment post pour inspection
MP22-23 NS15 Segment post pour inspection
Marine
Others
Dry Temperature 31 o
C
raju
raju
raju
raju
raju
Harteg
Harteg
Harteg
Harteg
raju
raju
Harteg
Harteg
Harteg
Harteg
20 Jan 2020
Date
20 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
LP2 pilecap concreting witnessed
BP37 pilegroup grouting witnessed
C1P25 pier starter pre pour &concreting
c1p27 pilecap bottom reinforcement checking done
LPS4 pier reinforcement checking done
Interchange AP37(S) Pile concreting
Ap 37S Pile Sounding check
Castingyard
raju
MP15-16ss10 Pre pour inspection & concreting witnessed
MP 13-14 SS10 Bottom& top profile & pre pour inspection
MP22-23 NS1 PH Segment top PT profile checked
MP22-23 NS1 PH Segment Pre pour check
Marine
Others
Dry Temperature 31 o
C
raju
raju
raju
raju
raju
Harteg
Harteg
raju
raju
Harteg
Harteg
21 Jan 2020
Date
21 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
AP39NW Pile sounding check
LPS6 Pier Post pour inspection done
Castingyard
MP 14-15SS7 pre pour &concreting witnessed
MP 21-23NS3 pre pour &concreting witnessed
MP-13-14/SS10 segment concreting
MP-13-14/SS10 segment concreting
Marine
Others
Dry Temperature 31 o
C
raju
raju
raju
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
raju
raju
Harteg
Harteg
22 Jan 2020
Date
22 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
raju
BP37 PILEgroup grouting started
C1P27 pilecap concreting started
AP39SE flushing &concreting witnessed
AP39SE Pile reinforcement cage checking
Castingyard
MP22-23NS17 pre pour& concreting witnessed
MP13-14 SS11 bottom profile inspection
MP15-16 SS11 bottom profile inspection
MP21-22 NS19 Down stand level checking
MP22-23 NS17 Segment reinforcement cage checking
MP19-20 NS1 segment concreting
MP-13-14/SS12 segment Rebar cage checking
Load transfer anchor block 13DP15 External reinforcement checking
Marine
Others
Dry Temperature 31 o
C
raju
Harteg
Harteg
Harteg
raju
raju
raju
raju
Harteg
raju
raju
raju
Harteg
Harteg
Harteg
Harteg
Harteg
23 Jan 2020
Date
23 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
LP2 N&S pier starter concreting witnessed
C1P27 pilecap post pour inspection done
MP04 N2 pier concreting witnessed
MP 17 S Pedsetral &shear key concreting witnessed
Castingyard
MP21-22 NS3 segment Post pour inspection
MP14-15 SS7 Segment post pour inspection
MP 15-16 SS11 concrete pouring in progress
MP23-24 NS11 Segment reinforcement cage checking
MP23-24 NS10 Segment reinforcement cage checking
MP 21-22 NS2 bottom profile witnessed& pre pour inspection ,concreting witnessed
MP 14-15SS6 pre pour inspection done&concreting witnessed
MP 21-22 NS19 concreting witnessed
Marine
Others
Dry Temperature 31 o
C
raju
raju
raju
raju
raju
raju
raju
raju
raju
Harteg
Harteg
Harteg
Harteg
Harteg
raju
raju
raju
24 Jan 2020
Date
24 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
LPN4 pier concreting witnessed
C1P27 PIERstarter concreting witnessed
C1P25 PIERstarter concreting witnessed
Castingyard
MP 15-16 SS12 top bottom & pre pour inspection done
MP 13-14 SS12 top bottom & pre pour inspection done
MP 22-23 NS18 bottom profile inspection done
MP 13-14 SS11 post pour inspection done
Marine
Others
Dry Temperature 31 o
C
raju
raju
raju
raju
raju
raju
raju
raju
raju
25 Jan 2020
Date
25 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
Castingyard
Marine
Others
Dry Temperature 31 o
C
26 Jan 2020
Date
26 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
BP36 Pilecap Pre-Pour checking done@8.11pm
C2P1 Pier Pre-Pour checking done@8.34pm
Castingyard
MP13-14 SS12 concreting witnessed
MP13-14 SS13 cage reinforcement checking done
MP15-16 SS14 cage reinforcement checking done
MP23-24ns1 PH cage reinforcement checking done
MP 22-23 NS18 pre pour inspection done
MP15-16 SS12 concreting witnessed
Marine
Others
Dry Temperature 31 o
C
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
raju
Prudhvi
Prudhvi
raju
raju
raju
raju
raju
raju
27 Jan 2020
Date
27 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
AP40S W cage checking done@5.40pm
C2P1 Pier Post-Pour checking done@6.42pm
AP40N Pile concrete started@7.04pm-End@7.48pm
BP36 pilecap concreting witnessed
Castingyard
MP 13-14 SS1 EJ segment Casting completed Start@2.01pm-End@5.25pm
MP 15-16 NS08 Segment Post-Pour checking done after retification@6.53pm
MP 15-16 NS06 Segment Post-Pour checking done after retification@6.57pm
MP 15-16 NS13 Segment Post-Pour checking done after retification@7.05pm
MP 20-21 NS03 Segment Post-Pour checking done@7.10pm
MP 22-23 NS4 cage reinforcement checking done found okay
MP 15-16ss9 cage reinforcement checking done found okay
Marine
Others
Dry Temperature 31 o
C
raju
raju
raju
raju
raju
Prudhvi
Prudhvi
Prudhvi
raju
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
raju
raju
28 Jan 2020
Date
28 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
AP40 NW Pile cage checking done@5.34pm
AP44 Pilecap bottom reinforcement checked@6.10pm
BP36 Pier Starter chceking done@6.22pm
AP40 SW pile Sounding check
C1P27 pier pre pour inspection
Castingyard
MP22-23 NS04 Segment bottom profile checking done@4.30pm
MP22-23 NS01 Pierhead segment concreting started@5.41pm-End@8.20pm
MP13-14 SS12 Post-Pour inspection done@6.12pm
MP15-16 NS09 Post-Pour after retification done@6.12pm
MP15-16 NS07 Post-Pour after retification done@6.15pm
MP14-15 SS15 Segment rebar cage checking done@6.20pm
MP22-23 NS04 Segment Pre-Pour Inspection done@7.53pm
MP22-23 NS04 Segment Concreting started@9.42pm
MP 23-24 NS1 PH segment pre pour inspection done
MP 18-19 NS19 PH segment reinforcement checking done
Marine
Others
Dry Temperature 31 o
C
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
raju
raju
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
raju
raju
29 Jan 2020
Date
29 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Castingyard
MP14-15 SS15 Segment Top Profile&Pre-Pour checking done@5.19pm
MP15-16 SS13 Segment Post-Pour inspection done@6.10pm
MP13-14 SS13 Segment Post-Pour inspection done@6.15pm
MP15-16 NS02 Segment Post-Pour inspection after retification done@6.20pm
MP22-23 NS11 Bottom Profile checking done@6.43pm
MP-13-14/SS14 Top profile checking
MP-13-14/SS14 Pre-pour inspection
MP-23-24 N-S11 Segment concreting@ 4:35 AM
MP14-15 S-S15 Segment Concrete Started@01:56 AM
MP-23-24/NS11 Pre-pour inspection
MP22-23 NS3 segment Reinforcement cage checking
MP-15-16/SS14 Bottom profile checking
MP 22-23 NS10 post pour inspection done
MP 13-14 SS14 cage reinforcement checking done
MP 23-24 ns3 cage reinforcement checking done
MP 14-15 SS5 post pour inspection done
Marine
Others
Dry Temperature 31 o
C
Prudhvi
Harteg
Harteg
Harteg
raju
raju
raju
raju
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
raju
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
raju
raju
raju
raju
30 Jan 2020
Date
30 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY
Interchange
LPN02 Pier concreting started@5.10pm
AP38S Pile Casting Completed@5.18pm
BP37 Pier Concrete started
LPS2 pier reinforcement checking done
Interchange BP36 PIER STARTER concreting
AP44 PILECAP post pour inspection
AP44 Pier starter reinforcement checking
LPN2 PIER concretring started
BP37 pier pre pour inspection
Castingyard
MP18-19 NS19 Pre-Pour and Top Profile checking done found okay@7.24pm
MP22-23 NS03 Segment bottom profile checked@7.35pm
MP18-19 NS19 Segment concreting started@10.04pm
MP15-16 SS14 Segment concreting WITnessed
MP -22-23-NS-03 Segment concrete
MP-22-23/NS3 Top profile checking
MP-22-23/NS3 Pre-pour inspection
MP18-19 NS19 (PH) Segment started
Marine
Others
Dry Temperature 31 o
C
Prudhvi
Prudhvi
Prudhvi
Prudhvi
raju
raju
raju
raju
Harteg
Prudhvi
Prudhvi
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Prudhvi
Prudhvi
Prudhvi
raju
Harteg
Harteg
Harteg
Harteg
31 Jan 2020
Date
31 Jan 2020
Date