You are on page 1of 190

AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal

Interchange

Castingyard

Marine

Others
The above described work was incorporated into this project
Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 01 Jan 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C
01 Jan 2020
Date

01 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal

Interchange
C1P30 intermediare pier cap checked..(rectification is in progress)
MP 52 S2 Pile protection cage checked…
MP 142 N2 CAGE CHECKED…

Castingyard
Marine

Others

The above described work was incorporated into this project


Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 02 Sep 2020


Day : wed
Work Shift : Day/Night

Dry Temperature 31 o
C

raju
raju
raju
raju
Harteg

mikhail
mikhail
raju
raju
raju
raju
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg

Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
Harteg

02 Sep 2020
Date

02 Sep 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall Dry

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP 25 NORTH PIR CAP PRE POUR INSPECTION DONE

Interchange
C1P 30TYPE 2 PIER CAP REINFORCEMENT CHECKED BUT AGAIN NOT CLEARED @4.50PM
Marine

Others

The above described work was incorporated into this project


Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 03 Sep 2020


Day : Thursday
Work Shift : Day/Night

Dry Temperature 31 o
C

MIKHAIL
Harteg
raju

Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
Harteg
raju
raju

Nagendra
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
raju
03 Sep 2020
Date

03 Sep 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP35 S1 CHSL started@10.07am
MP25 S Pier checking done@3.27pm
MP18 N Piercap Post-Pour checking done@4.32pm
MP36/N1 Pile sounding test & Pre pour
MP1 NN Pile cap concreting.
MP36/N1 Pileconcreting witnessed@1.58am
MP19N1 builtup conreting witneseed@3.16am

Interchange
AP43W,BP37SE,AP41A-S,AP41A-E,AP41A-W,AP41B-E CHSL test started@10.30am-End@3.31pm
LPN05 Pier reinforcement checking done@3.45pm
LPS11 Pier reinforcement checking done@3.47pm
C2P2 pilecap grouting started@4.34pm
C2P2 Pile cap pre-pour inspection
C2A1 pier post pour checking
C2BH2. GTI soil sampling
FPO3E flushing&concreting witnessed@5.45am
C2P2 pilecap concreting completed@3.54am

Castingyard
MP 17-18 NS01 Segment bottom checking done@9.55am
MP 16-17 NS01 Segment Post-Pour chceking done@10.07am
MP 19-20 NS15 Segment Cage checking done@11.54am
MP14-15 SS10 Segment reinforcement
MP22-23 NS14 Segment post pour inspection
MP 20-21 NS 15 segment Top PT profile & pre pour inspection
MP 22-23NS09 bottom profile inspetion done@3.34am
MP 22-23NS09 PRE POUR inspection done found okay@6.50am
MP 20-21 NS 15 segment concreting started@5am
MP17-18 NS1 PIER HEADsegment Top PT profile & pre pour inspection permitted for concreting@4.13am
MP 22-22NS05 Cage reinforcement checking done@2.00am
Marine
MP123 S2 cage reinforcement checking done@3.40am

Others

The above described work was incorporated into this project


Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 04 Jan 2020


Day : Saturday
Work Shift : Day/Night

Dry Temperature 31 o
C

Pudhvi
Pudhvi
Pudhvi
Harteg
Harteg
raju
raju

1pm Pudhvi
Pudhvi
Pudhvi
Pudhvi
Harteg
Harteg
Harteg
raju
raju

Pudhvi
Pudhvi
Pudhvi
Harteg
Harteg
Harteg
raju
raju
raju
@4.13am raju
raju

raju

04 Jan 2020
Date

04 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal

Interchange

Castingyard
Marine

Others

The above described work was incorporated into this project


Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 05 Jan 2020


Day : Sunday
Work Shift : Day/Night

Dry Temperature 31 o
C
43835
Date

05 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP25 S pier concreting witnessed@8.50pm
MP30 pile cap pre pour checking done@11.52pm
MP30 pile cap concreting started@3.30am
MP20 N pier cap pre pour checking done@5.25am

Interchange
C1P26 pier reinforcement checking done@ 4.08pm
LP05S PIER concreting witnessd@9.36PM
LP06 pilecap concreting witnessed@7.34pm
FP05 W pile concreting started@12.38am
FP05 W pile concreting completed@3.22am

Casting yard
MP16-17 NS19 Bulkhead checking done
MP16-17 NS19 PH segment cage reinforcement checking done listed observations@5.44pm
MP 14 15 NS10 pre pour inspection &permitted for concreting@5.31pm
MP 21-22 NS5 cage reinforcement checking done @7.00pm
MP 14-15 SS11cage reinforcement checking done @7.10pm
MP 20-21NS17 cage reinforcement checking done @7.15PM
MP 14-15 SS10 Concreting done @11.20pm
MP19-20 NS 15 bottom profile checking done@1.34Am
MP22-23 NS 08 bottom profile checking done@5.13Am
Marine

Others

The above described work was incorporated into this project


Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 06 Jan 2020


Day : MONDAY
Work Shift : Day/Night

Dry Temperature 31 o
C

RAJU
nagendra
nagendra
nagendra

RAJU
RAJU
RAJU
nagendra
nagendra

RAJU
RAJU
RAJU
RAJU
RAJU
RAJU
nagendra
nagendra
nagendra
06 Jan 2020
Date

06 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP20N Pier cap concreting completed@10.46pm
MP30 pile cap concreting completed@2.53am
MP25S post pour inspection done@7.52PM

Interchange
AP38 E cage checking Done @11.05pm
AP38 W cage checking Done @11.07pm
LPN06 pier starter reinforcement checking done@11.32pm
LP6 pile cap post pour checking done@2.01am

Castingyard
MP19-20 NS15 segment concreting started @10.43pm
MP20-21 NS16 concreting started@3.47am
MP20-21 NS16 concreting completed@6.15am
MP21-20 NS05 concreting started@6.45am
MP 19-20NS16 cage reinforcement checking done@3.52pm
MP19-20 NS15 pre pour inspection done @6.11pm
mp22-23ns08 segment concrete completed@10.13pm
Marine
MP133N2 cage checking donefound okay@6.54pm

Others

The above described work was incorporated into this project


Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 07 Jan 2020


Day : Tuesday
Work Shift : Day/Night

Dry Temperature 31 o
C

nagendra
nagendra
raju

nagendra
nagendra
nagendra
nagendra

nagendra
nagendra
nagendra
nagendra
raju
raju
raju
raju

07 Jan 2020
Date

07 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall Dry

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP25 N pier concreting started@11.29pm
MP25 N pier concreting completed@1.53am
MP38 S2 cage checking completed@1.54am

Interchange
C1P26 pier concreting completed@2.02am
FP04E concreting started@3.53am
FP04E concreting completed@4.53am
LPN-05 pier concreting started@12.35am
LPN-05 pier concreting completed@4.51am
LP N & S pier starter concreting started@5.05am
LP 6N&S pier starter pre pourinspection completed@6.37pm
LP5 pier pour inspection done@7.15pm

Castingyard
MP14-15 SS11 bottom profile checking done@10.49pm
MP14-15 SS11 pre pour checking done@3.24am
MP16-17 NS 19 concreting started@6.00am
MP 19-20 NS19 EJ Pier head segment reinforcement checking done@4.36pm
MP22-23NS06 cage reinforcement checking done@4.57pm
MP19-20NS19 bulk head checking done

Marine
Others

The above described work was incorporated into this project


Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 08 Jan 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

nagendra
nagendra
nagendra

nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
raju
raju

nagendra
nagendra
nagendra
raju
raju
raju
08 Jan 2020
Date

08 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP20N pedestral& shearkey CONCRETING WITNESSED@10.30pm
MP20 S pier cap reinforcement checking done@1.09am
MP5SS pier pre pour checking done@1.25am
MP4 SN pier started reinforcement checking done@2.44am
MP38 N1 pile cage checking done@3.41am
MP40N2 cage checking done @3.41am
MP5SS pier concreting started@2.45am
MP5SS pier concreting completed@6.06am

Interchange
LPS5& LPS11 pier post pour inspection done@3,07pm
AP42 pile cap PCC started@11.19pm
C2P26 pier post pour checking done@1.41am
LPN 11 pier concreting started@2.05am
LPN 11 pier concreting completed@6.05am

Castingyard
MP 19-20 NS1 pier head segment temp bulkhead profile cordinate@4.07pm
MP22-23NS07 BOTTOM profile checking done@6.10pm
MP 20-21 NS15 &NS16 post pour inspection completed@6.20pm
MP20-21 NS17 bottom profile checking done@10.51pm
MP22-23NS07 pre pour checking done@11.02pm
MP22-23 concreting started@12.28am
MP22-23 concreting completed@2.06am
MP21-22 NS05 post pour checking done@3.05am
MP20-21 NS17 top pofile and pre pour checking done@6.07am
MP19-20 bottom profile checking done@6.37am
Marine

Others

The above described work was incorporated into this project


Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 09 Jan 2020


Day : Thursday
Work Shift : Day/Night

Dry Temperature 31 o
C

raju
Nagendra
Nagendra
Nagendra
Nagendra
Nagendra
Nagendra
Nagendra

raju
Nagendra
Nagendra
Nagendra
Nagendra

raju
raju
raju
Nagendra
Nagendra
Nagendra
Nagendra
Nagendra
Nagendra
Nagendra
09 Jan 2020
Date

09 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP44 bore hole terminated checked@11.46pm
MP38N2 cage checking done@1.50am
MP16S pier cap reinforcement checking done @2.44am
MP25N PIER post pour inspection done@6.58pm
MP04SS PIER reinforcement checking done@7.26pm

Interchange
LP04 pile group grouting started@11.56pm
LP04 pile group grouting completed@3.00am

Castingyard
MP14-15 SS12 concreting started@2.43am
MP21-22 NS15 concreting started@5.06am
MP14-15 SS12 concreting completed@5.02am
MP21-22 NS15 concreting started@7.13am
MP21-22 NS15 top and pre pour checking done@2.27am
MP14-15 SS12 pre pour checking done@1.54am
MP 18-19 NS1 PHsegment reinforcement checking done@5.15PM
MP21-22 NS15 Bottom profile checking done@5.47pm
MP 19-20 NS16 PRE pour inspection done @6pm
MP 19-20 NS16 concreting witnessed@9.38pm
MP14-15 SS12 bottom profile checking done@9.37pm
MP 20-21 NS18 segment reinforcement checking done@8.28PM
Marine
MP122N2 cage checking done@1.49am

Others

The above described work was incorporated into this project


Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


ARY MMRDA

Date : 10 Jan 2020


Day : Friday
Work Shift : Day/Night

Dry Temperature 31 o
C

nagendra
nagendra
nagendra
raju
raju

nagendra
nagendra

nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
Raju
Raju
Raju
Raju
Raju
Raju
nagendra

10 Jan 2020
Date

10 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall Dry

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP27 PILECAP concrete witnessed@12.33pm
MP16N Piercap pre pour inspection done@11.24am
MP 37S1 flushing &sounding witnessed
MP4SN pier reinforcement checking done@2.43pm
MP05 Spier pier pre pour inspection done@ 3pm

Interchange
LPS01 Pier pre pour checking done @10.16pm
FP04W flushing started@11.13pm
LPS01 Pierconcreting started @11.37pm
AP42 pile group Grouting started@12.24am
FP04W concretinf started@3.14am
LPS01 Pier concreting completed @3.30am
FP04W concretinf completed@5.00am
LP02 pile cap PCC concreting Started@5.10am
LP02 pile cap PCC concreting completed@6.30am
FP08 E&W FPO9E&W chsl test witnessed@10.47am
FP04W flushing & soumding witnesed@11am

Castingyard
MP 20-21 NS18 bottom profile checking done@10.55pm
MP22-23 NS06 top profile & pre pour checking done@12.03am
MP22-23 NS06 concreting started@01.35am
MP 20-21 NS18 top and pre pour checking done @2.56am
MP22-23 NS06 concreting completed@3.25am
MP20-21 NS18 concreting started@3.52am
MP20-21 NS18 concreting completed@6.00am
MP14-15 SS11 post pourinspection done@2.24pm
MP22-23 NS06 bottom profile inspection done@4.15pm
MP 20-21ns4 cage reinforcement checking done
MP 14-15 SS13 cage reinforcement checking done
MP 21-22 NS17 CAGE reinforcement inspection
MP 19-20ns2 CAGE reinforcement inspection
Marine

Others

The above described work was incorporated into this project


Prepared By :
Vivekanand
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 11 Jan 2020


Day : Saturday
Work Shift : Day/Night

Dry Temperature 31 o
C

raju
raju
raju
raju
raju
raju

nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
raju
raju

nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
nagendra
raju
raju
raju
raju
raju
raju

11 Jan 2020
Date

11 Jan 2020
Date
BF43:BF68
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal

Interchange

Castingyard
MP19-20 NS17 pre pour &concreting witnessed@5.15pm

Marine
Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


ARY MMRDA

Date : 12 Jan 2020


Day : Sunday
Work Shift : Day/Night

Dry Temperature 31 o
C

raju
12 Jan 2020
Date

12 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP1SN PCC concrete
MP04 S2 pier concreting
MP20 N pedistal & Shearkey concreting
MP5 S2 pier concreting
MP5S1 PIER pre pour inspection done observations listed@11.51am

Interchange
AP42 Pile cap bottom reinforcement checking
LP-04 pile cap concreting
LPN-11 pier starter post pour inspection done@2.52pm

Castingyard
MP13-14 NS7 lifting in progress
MP19-20 NS19 EJ Segment Concreting
MP21-22 NS16 Segment Pre pour checking
MP21-22 NS16 Segment Concreting
MP14-15 SS 13 Segment Concreting
MP 21-22NS05 post pour inspection done
MP 22-23NS07 Post pour inspection done
MP 16-17NS19 Post pour inspection done
MP 20-21NS17 Post pour inspection done
MP 14-15SS12 Post pour inspection done
MP 22-230NS06 Post pour inspection done
MP 21-22NS15 post pour inspection done
mp 18-19 NS01 ph pre pour inspection done
Marine
Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


ARY MMRDA

Date : 13 Jan 2020


Day : Monday
Work Shift : Day/Night

Dry Temperature 31 o
C

Harteg
Harteg
Harteg
Harteg
raju

Harteg
Harteg
raju

Harteg
Harteg
Harteg
Harteg
Harteg
raju
raju
raju
raju
raju
raju
raju
raju
13 Jan 2020
Date

13 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP4 S1 pier pre pour inspection

Interchange
LP4 pile cap coal tar epoxy allowed
LP04 pile cap post pour inspection
C1P27 Pile cap PCC is in progress
LP-02 pile cap PCC concrete
LPN4 AND LPS4 PIER STARTER Reinforcement checking

Castingyard
MP-20-21/NS4 Segment pre pour inspection
MP-20-21/NS4 Segment bottom PT profile checking
MP 20-21 NS18 POST pour inspection done
MP 19-20 NS16 POST pour inspection done
MP 17-18 NS01 POST pour inspection done
MP 19-20 NS17 POST pour inspection done
mp 19-20 ns4 Bottom profile inspection

Marine
Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


ARY MMRDA

Date : 14 Jan 2020


Day : Tuesday
Work Shift : Day/Night

Dry Temperature 31 o
C

Harteg

Harteg
Harteg
Harteg
Harteg
Harteg

Harteg
Harteg
raju
raju
raju
raju
raju
14 Jan 2020
Date

14 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall Dry

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP 4O S1 cage reinforcement inspection
MP 4O N1 cage reinforcement inspection

Interchange
MP 42 pilecap pre pour inspection
AP 39SW cage reinforcement inspection

Castingyard
MP 20-21 ns4 concreting witnessed
MP 22-23NS05 pre pour inspection done
MP 21-22NS16 post pour inspection done
MP14-15 SS13 post pour inspection done
MP 22-23 NS05 segment concrete inspection

Marine
Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


MMRDA

Date : 15 Jan 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

RAJU
RAJU

RAJU
RAJU

RAJU
RAJU
RAJU
RAJU
RAJU
15 Jan 2020
Date

15 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall Dry

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP 37N2 CHSL TEST started
MP4S2 pier post pour inspection sone
MP 41 s1 cage reinforcement inspection
MP31 Pile group sonic pipe grouting
MP38/N2 Pile concreting
MP38 N2 Pile sounding checking
Interchange
BP 37 pilecap pcc inspection done
Coal tar application on AP-42 pile cap
AP42 Pile cap Surface Preparation for coal tar epoxy application
Sonic tube grouting of C1P25
AP42 Pilecap post pour inspection
C1P25 Pile group. Sonic tube Grouting

Castingyard
MP 21-23 NS4 segment cage reinforcement inspection
FP-10 E&W EP29E&W chsl test started
MP 19-20NS3 bottom profile & cover checking done
MP20-21 NS03 Segment concreting
MP-22-23/NS5 POST POUR INSPECTION
MP-20-21/NS3 Pre pour inspection
MP17-18 NS19 Pre pour inspection

Marine
MP 122 S2 cage reinforcement inspection
Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


MMRDA

Date : 16 Jan 2020


Day : Thursday
Work Shift : Day/Night

Dry Temperature 31 o
C

raju
raju
raju
Harteg
Harteg
Harteg

raju
Harteg
Harteg
Harteg
Harteg
Harteg

raju
raju
raju
Harteg
Harteg
Harteg
Harteg

raju
16 Jan 2020
Date

16 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall Dry

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP 38 N2 concreting witnessed@9.34am
mp 03 s1 pier reinforcement checking done
MP 39 S1 &S2 N1 cage reinforcement checking done
MP20 South Pedestal concreting
MP3 S2 pier concreting
MP30 North pier concreting

Interchange
ap 42 pier starter pre pour inspection done
C1P25 pilecap bottom reinforcement checking done
FP5 E&W CHSL TEST witnessed
INTERCHANGE LPN06 PIER Concreting
Sonic tube grouting of LP-02 pile cap
LP2 pile group sonic pipe grouting

Castingyard
MP 21-22NS17 [Post pour inspection done
MP14-15 ss14 Post pour inspection done
MP-14-15/SS9 Pre-pour inspection
MP-14-15/SS9 Bottom profile checking
MP-21-22/NS18 Top profile checking
MP-21-22/NS18 Pre-pour inspection
Marine

Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


MMRDA

Date : 17 Jan 2020


Day : Friday
Work Shift : Day/Night

Dry Temperature 31 o
C

raju
raju
raju
Harteg
Harteg
Harteg

raju
raju
raju
Harteg
Harteg
Harteg

raju
raju
Harteg
Harteg
Harteg
Harteg
17 Jan 2020
Date

17 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP 28N&s pier reinforcement checking done
MP16 S pedestral &shear key checking done
MP03 S2 pier pre pour inspection done
MP3 S1 Pier pre pour inspection
MP3S1 Pier concreting

Interchange
LPN06 pier concreting completed
C1P25 pilecap pre pour inspection done
LPS3 pier post pour inspection done
C1P25 pile cap concreting
LP02 pile cap bottom reinforcement checking
MP-19-20/NS2 Top profile checking
MP-19-20/NS2 Pre-pour inspection

Castingyard
MP 22-23 NS15 Segment pre pour &profile inspection concreting witnessed
MP 15-16 NS01 post pour after rectification work
MP 21-22 NS18 concreting witnessed
MP 14-15 SS09 concreting witnessed
MP 22-23 NS01 cage reinforcement checking done
MP 17 S PH reinforcement checking done
MP 19-20 NS3 post pour inspection
MP 15-16 SS11 cage reinforcement checking
MP 21-23 NS03 cage reinforcement checking done
MP-20-21/NS2 Bottom profile checking

Marine

Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


ARY MMRDA

Date : 18 Jan 2020


Day : Saturday
Work Shift : Day/Night

Dry Temperature 31 o
C

raju
raju
raju
Harteg
Harteg

raju
raju
raju
Harteg
Harteg
Harteg
Harteg

raju
raju
raju
raju
raju
raju
raju
raju
raju
Harteg

18 Jan 2020
Date

18 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall Dry

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal

Interchange

Castingyard
Marine

Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


MMRDA

Date : 19 Jan 2020


Day : Sunday
Work Shift : Day/Night

Dry Temperature 31 o
C
19 Jan 2020
Date

19 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall Dry

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP15 S piercap concreting witnessed
MP24 PILEGROUP grouting witnessed

Interchange
C1P25 pier starter reinforcement inspection done
LP1N PIER concreting witnessed
LP6s PIER concreting witnessed
AP37(N) Pile concreting
Ap 37N pile sounding check
Coal tar epoxy application on C1P25 pile cap started
C2BH6 GTI borehole inspection

Castingyard
MP 14-15SS8 Pre pour inspection & concreting
MP 21-22ns04 Pre pour inspection & concreting
MP-13-14/SS10 Rebar cage checking
MP14-15 SS9 Segment post pour inspection
MP21-22 NS18 Segment post pour inspection
MP22-23 NS15 Segment post pour inspection

Marine
Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


MMRDA

Date : 20 Jan 2020


Day : Monday
Work Shift : Day/Night

Dry Temperature 31 o
C

raju
raju

raju
raju
raju
Harteg
Harteg
Harteg
Harteg

raju
raju
Harteg
Harteg
Harteg
Harteg
20 Jan 2020
Date

20 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal

Interchange
LP2 pilecap concreting witnessed
BP37 pilegroup grouting witnessed
C1P25 pier starter pre pour &concreting
c1p27 pilecap bottom reinforcement checking done
LPS4 pier reinforcement checking done
Interchange AP37(S) Pile concreting
Ap 37S Pile Sounding check

Castingyard
raju
MP15-16ss10 Pre pour inspection & concreting witnessed
MP 13-14 SS10 Bottom& top profile & pre pour inspection
MP22-23 NS1 PH Segment top PT profile checked
MP22-23 NS1 PH Segment Pre pour check

Marine
Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


ARY MMRDA

Date : 21 Jan 2020


Day : Tuesday
Work Shift : Day/Night

Dry Temperature 31 o
C

raju
raju
raju
raju
raju
Harteg
Harteg

raju
raju
Harteg
Harteg
21 Jan 2020
Date

21 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall Dry

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP03 N2 pierconcreting witnessed
MP38 N1 pile concreting witnessed
mp18s piercap reinforcement inspecton
MP30 South pier pre pour inspection
MP38 N1 pile sounding check
MP31 Pile Cap concretring started
MP15 S pedestal & Shear key pre pour inspection
MP31 Pile cap Pre pour inspection
MP1 SN3 pile CHSL Test in progress
MP2 SN1 pile CHSL Test in progress
MP30 N2 pier post pour inspection

Interchange
AP39NW Pile sounding check
LPS6 Pier Post pour inspection done

Castingyard
MP 14-15SS7 pre pour &concreting witnessed
MP 21-23NS3 pre pour &concreting witnessed
MP-13-14/SS10 segment concreting
MP-13-14/SS10 segment concreting

Marine
Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


MMRDA

Date : 22 Jan 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

raju
raju
raju
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg

Harteg
Harteg

raju
raju
Harteg
Harteg
22 Jan 2020
Date

22 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP40S2 concreting witnessed
MP17S Piercap Concreting
MP40/S2 pile sounding check
MP42 N2 pile reinforcement cage checking

Interchange
raju
BP37 PILEgroup grouting started
C1P27 pilecap concreting started
AP39SE flushing &concreting witnessed
AP39SE Pile reinforcement cage checking

Castingyard
MP22-23NS17 pre pour& concreting witnessed
MP13-14 SS11 bottom profile inspection
MP15-16 SS11 bottom profile inspection
MP21-22 NS19 Down stand level checking
MP22-23 NS17 Segment reinforcement cage checking
MP19-20 NS1 segment concreting
MP-13-14/SS12 segment Rebar cage checking
Load transfer anchor block 13DP15 External reinforcement checking
Marine

Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


ARY MMRDA

Date : 23 Jan 2020


Day : Thursday
Work Shift : Day/Night

Dry Temperature 31 o
C

raju
Harteg
Harteg
Harteg

raju
raju
raju
raju
Harteg

raju
raju
raju
Harteg
Harteg
Harteg
Harteg
Harteg
23 Jan 2020
Date

23 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall Dry

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP39 N2 PILE concreting witnessed
BP 36 pilecap bottom reinforcement checking done
MP 28 S pier pre pour inspection done
MP 11 Spiercap reinforcement checking done
MP04 N1 pier reinforcement checking done

Interchange
LP2 N&S pier starter concreting witnessed
C1P27 pilecap post pour inspection done
MP04 N2 pier concreting witnessed
MP 17 S Pedsetral &shear key concreting witnessed

Castingyard
MP21-22 NS3 segment Post pour inspection
MP14-15 SS7 Segment post pour inspection
MP 15-16 SS11 concrete pouring in progress
MP23-24 NS11 Segment reinforcement cage checking
MP23-24 NS10 Segment reinforcement cage checking
MP 21-22 NS2 bottom profile witnessed& pre pour inspection ,concreting witnessed
MP 14-15SS6 pre pour inspection done&concreting witnessed
MP 21-22 NS19 concreting witnessed
Marine

Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


MMRDA

Date : 24 Jan 2020


Day : Friday
Work Shift : Day/Night

Dry Temperature 31 o
C

raju
raju
raju
raju
raju

raju
raju
raju
raju

Harteg
Harteg
Harteg
Harteg
Harteg
raju
raju
raju
24 Jan 2020
Date

24 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP33 pilegroup grouting witnessed

Interchange
LPN4 pier concreting witnessed
C1P27 PIERstarter concreting witnessed
C1P25 PIERstarter concreting witnessed

Castingyard
MP 15-16 SS12 top bottom & pre pour inspection done
MP 13-14 SS12 top bottom & pre pour inspection done
MP 22-23 NS18 bottom profile inspection done
MP 13-14 SS11 post pour inspection done

Marine
Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


ARY MMRDA

Date : 25 Jan 2020


Day : Saturday
Work Shift : Day/Night

Dry Temperature 31 o
C

raju

raju
raju
raju

raju
raju
raju
raju
raju
25 Jan 2020
Date

25 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall Dry

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal

Interchange

Castingyard
Marine

Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


MMRDA

Date : 26 Jan 2020


Day : Sunday
Work Shift : Day/Night

Dry Temperature 31 o
C
26 Jan 2020
Date

26 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP04N North Side pier Post-Pour outer checking done@3.58pm
MP17 South Pierhead Post-Pour checking done@6.32pm
MP18 Piercap Concreting started@6.35pm
MP20 SS N3 Pilecage checking done@6.37pm
MP46 S1 A-A Borehole samples checking done@6.38pm
MP24 Pilecap Pre-Pour Checking done@7.09pm
MP30 South Pier Post-Pour checking done@7.29pm
MP04N South Side pier Pre-Pour checking done@7.49pm
MP04N North Side pier Post-Pour inner checking done@7.56pm
NP05N North side pier Reinforcement checking done@10.17pm
MP04N North side pier concreting started@10.01pm
MP18 Piercap pre pour inspection done

Interchange
BP36 Pilecap Pre-Pour checking done@8.11pm
C2P1 Pier Pre-Pour checking done@8.34pm

Castingyard
MP13-14 SS12 concreting witnessed
MP13-14 SS13 cage reinforcement checking done
MP15-16 SS14 cage reinforcement checking done
MP23-24ns1 PH cage reinforcement checking done
MP 22-23 NS18 pre pour inspection done
MP15-16 SS12 concreting witnessed

Marine

Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


ARY MMRDA

Date : 27 Jan 2020


Day : Monday
Work Shift : Day/Night

Dry Temperature 31 o
C

Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi

raju

Prudhvi
Prudhvi
raju
raju
raju
raju
raju
raju

27 Jan 2020
Date

27 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
mp39 n1 pilecap concreting comleted
MP 38 S2&N2 ,MP 37 S1&N1 chsl test witnessed
MP 24 pilecap concreting started
MP 28 S pier post pour inspection done

Interchange
AP40S W cage checking done@5.40pm
C2P1 Pier Post-Pour checking done@6.42pm
AP40N Pile concrete started@7.04pm-End@7.48pm
BP36 pilecap concreting witnessed

Castingyard
MP 13-14 SS1 EJ segment Casting completed Start@2.01pm-End@5.25pm
MP 15-16 NS08 Segment Post-Pour checking done after retification@6.53pm
MP 15-16 NS06 Segment Post-Pour checking done after retification@6.57pm
MP 15-16 NS13 Segment Post-Pour checking done after retification@7.05pm
MP 20-21 NS03 Segment Post-Pour checking done@7.10pm
MP 22-23 NS4 cage reinforcement checking done found okay
MP 15-16ss9 cage reinforcement checking done found okay
Marine

Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


ARY MMRDA

Date : 28 Jan 2020


Day : Tuesday
Work Shift : Day/Night

Dry Temperature 31 o
C

raju
raju
raju
raju
raju

Prudhvi
Prudhvi
Prudhvi
raju

Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
raju
raju
28 Jan 2020
Date

28 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall Dry

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP29 South Pier Pre-Pour checking done@5.03pm
MP130 N1 Pile cage checking done@5.33pm
MP20 SS S1 Pile cage checking done@5.34pm
MP29 South Pier Concreting started@7.24pm
MP05N North Pier Pre-Pour checking done@7.25pm
MP11 South Piercap Pre-Pour Checking done@8.18pm
MP39 S2 Sounding checking done@10.01pm
MP5N2 pier Concreting started
MP32 pile cap checking
MP1SN pile cap CHSL Pipe grouting
MP39/S2Pile concreting
MP05 N1 pier reinforcement checking
MP11 South Pier cap concreting started
MP 39 S1 pile concreting witnessed
MP 33pilecap soffit slab checking done

Interchange
AP40 NW Pile cage checking done@5.34pm
AP44 Pilecap bottom reinforcement checked@6.10pm
BP36 Pier Starter chceking done@6.22pm
AP40 SW pile Sounding check
C1P27 pier pre pour inspection

Castingyard
MP22-23 NS04 Segment bottom profile checking done@4.30pm
MP22-23 NS01 Pierhead segment concreting started@5.41pm-End@8.20pm
MP13-14 SS12 Post-Pour inspection done@6.12pm
MP15-16 NS09 Post-Pour after retification done@6.12pm
MP15-16 NS07 Post-Pour after retification done@6.15pm
MP14-15 SS15 Segment rebar cage checking done@6.20pm
MP22-23 NS04 Segment Pre-Pour Inspection done@7.53pm
MP22-23 NS04 Segment Concreting started@9.42pm
MP 23-24 NS1 PH segment pre pour inspection done
MP 18-19 NS19 PH segment reinforcement checking done

Marine

Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


MMRDA

Date : 29 Jan 2020


Day : Wednesday
Work Shift : Day/Night

Dry Temperature 31 o
C

Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
raju
raju

Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg

Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
raju
raju

29 Jan 2020
Date

29 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall Dry

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP32 Pilecap Concreting Started@7.23pm
MP05/N1 Pre Pour inspection
MP11S pier cap Pedestal pre pour inspection
MP05/N1 pier Concrete Started@6:15AM
MP5 N2pier concreting witnessed
mp 32 pilecap pre pour inspection done
MP 29 N PIER reinforcement checking done
MP31 pilecap post pour inspection done
Interchange
AP44 Pilecap Concreting started@4.39pm
BP36 Pier starter checking done@6.34pm
AP43 PCC is aprroved@6.51pm
AP-43 pile cap pcc started@2:40am
LPN2 PIER pre pour checking
AP40sw PILE concreting completed

Castingyard
MP14-15 SS15 Segment Top Profile&Pre-Pour checking done@5.19pm
MP15-16 SS13 Segment Post-Pour inspection done@6.10pm
MP13-14 SS13 Segment Post-Pour inspection done@6.15pm
MP15-16 NS02 Segment Post-Pour inspection after retification done@6.20pm
MP22-23 NS11 Bottom Profile checking done@6.43pm
MP-13-14/SS14 Top profile checking
MP-13-14/SS14 Pre-pour inspection
MP-23-24 N-S11 Segment concreting@ 4:35 AM
MP14-15 S-S15 Segment Concrete Started@01:56 AM
MP-23-24/NS11 Pre-pour inspection
MP22-23 NS3 segment Reinforcement cage checking
MP-15-16/SS14 Bottom profile checking
MP 22-23 NS10 post pour inspection done
MP 13-14 SS14 cage reinforcement checking done
MP 23-24 ns3 cage reinforcement checking done
MP 14-15 SS5 post pour inspection done

Marine

Others

The above described work was incorporated into this project


Prepared By :
Name of Inspector Signature
Approved By :

Name and Designation Signature


MMRDA

Date : 30 Jan 2020


Day : Thursday
Work Shift : Day/Night

Dry Temperature 31 o
C

Prudhvi
Harteg
Harteg
Harteg
raju
raju
raju
raju

Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
raju
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Prudhvi
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
raju
raju
raju
raju
30 Jan 2020
Date

30 Jan 2020
Date
AECOM-PADECO-DAR-TYLIN INSPECTOR'S DAILY SITE DIARY

Project : Mumbai Trans Harbour Link Projecet (Package-1)

Contractor : L & T-IHI CONSORTIUM


Sub-Contractors :

Site Conditions : Weather Sunny Wind Puffy Rainfall

Description of works performed and inspected / Site Observations


Specify: Location, nature of works, part of the structure
Intertidal
MP32 Pilecap concrete completed@4.35pm
MP07 North Pierhead checking done and told them to rectify some points@6.25pm
MP27 North Pier reinforcement checking done and told them to rectify some points@6.48pm
MP18S Pierhead Post-Pour checking done@7.06pm
MP 11s pedestral concreting witnessed
MP 24 PILECAP post pour inspection done
MP 29 pier post pour inspection done
MP5 n pier post pour inspection done
MP29N Pier pre pour inspection

Interchange
LPN02 Pier concreting started@5.10pm
AP38S Pile Casting Completed@5.18pm
BP37 Pier Concrete started
LPS2 pier reinforcement checking done
Interchange BP36 PIER STARTER concreting
AP44 PILECAP post pour inspection
AP44 Pier starter reinforcement checking
LPN2 PIER concretring started
BP37 pier pre pour inspection

Castingyard
MP18-19 NS19 Pre-Pour and Top Profile checking done found okay@7.24pm
MP22-23 NS03 Segment bottom profile checked@7.35pm
MP18-19 NS19 Segment concreting started@10.04pm
MP15-16 SS14 Segment concreting WITnessed
MP -22-23-NS-03 Segment concrete
MP-22-23/NS3 Top profile checking
MP-22-23/NS3 Pre-pour inspection
MP18-19 NS19 (PH) Segment started

Marine
Others

The above described work was incorporated into this project


Prepared By :

Name of Inspector Signature


Approved By :

Name and Designation Signature


ARY MMRDA

Date : 31 Jan 2020


Day : Friday
Work Shift : Day/Night

Dry Temperature 31 o
C

Prudhvi
Prudhvi
Prudhvi
Prudhvi
raju
raju
raju
raju
Harteg

Prudhvi
Prudhvi
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg
Harteg

Prudhvi
Prudhvi
Prudhvi
raju
Harteg
Harteg
Harteg
Harteg
31 Jan 2020
Date

31 Jan 2020
Date

You might also like