You are on page 1of 4

BASIL READ

Job Card No.

MININGG BASIL READ MINING CONTRACTORS


B 09741

Plant No:
Received By: Breakdowns: X Total Job Time
Time:
L13 Time:
T
Date
Service: Time Stop 22hoo
|13/O6 20 22 Smr End:
Reported By:SorgE dA Smr Start:
Preventive: Time Start:
13 S
Welding: Time Taken: ws/o
Smr:
S
Location:
2432 W/shop Hrs: Accidents:
L IaeeUCe Basil Read:
Contractor:

Reported Problem:NO r0tt7br7 and perla S[UT7

Work Carried Out:


Actual time spent on eachjob
Time Stop Time Started Time Stop
Keftiija9 usrceudh iS |/35O|/ o|
Jroape hoothg on neyelreelIL CirCoet /4: S|22 :00

Work Carried Out By: Time Machine


Company Number:
M Ready for Work:
erson Notified Machine Available:
By Radio: InPerson:
Signature,A Signature.
(MACHINE IN SAFE AND WORKING CONDITION)
BRM/B&E.PDEL.SFD.05033
Rev: 3
Date: 18.06.21
COrstaOe 40173
BASIL READ
MINING BASIL READ MINING CONTRACTORS Job Card No.

B 09740
Plant No: H2 162 Received By:
e
Time: lo Breakdowns:XX Total Job
Time
Date:
S Time: Service: Time Stop: /GSS
20 2 Smr End:
Preventive Time Start: rhS7
Reported By:Ae Smr Start:
Welding: Time Taken:
Smr: s 2m
237% Wishop Hrs: Accidents:
Location: crcelet Basil Read:

Contractor
Reported Problem: acune t_OE

Work Carried Out: Actual time spent on each job


TimeStop Time Stated Time Stop
roubesnoofiy Wlen an St Wathq_for glts_ /S O0|/6 :30|
|1 :BU|6:55S

Time Machine Ready for Work:


Work Caried Out By:fn (LeU
Company Number: Person Notified Machine Available:
By Radio: In Person:

Signature:
Signature:
SAFE AND WORKING CONDITION)
(MACHINE IN Rev: 3 Date: 18.06.21
Constable 40173
BRM/B&E.PDEL.SFD.05033
BASIL READb
Job Card No.

MINING BASIL READ MINING CONTRACTORS


B 09739
Plant No
HHR 162 Received By: a Breakdowns: Total Job Time
Time O4 23 Time Service: Time Stop
Date O8I O6 20 2-2 Smr End:
Reported By: SOngeio Preventive Time Start:
7420
Smr Start:
Welding: Time Taken: |/Uz9
Smr 231 Wishop Hrs: Accidents:
Location: |Corealet Basil Read:
Contractor:

Reported Problem: Pipe_pf_(ut_ Outt_oE tashia peal

Work Carried Out: Actual time spent each


on job
Time Stop Time Started Time Stop
fah Á PPe l07 2o |07 SO
lIzui Kohhg m ighA_ 2:S0OF :47

Work Carried Out By: oy Time Machine Ready for Work:


Company Number: 1OUY Person
Notified Machine Available:
By Radio: In
Person:
Signature: Signature:.
(MACHINE IN SAFE AND WORKING CONDITION)
BRM/B&E.PDEL.SFD.05033 Rev: 3
Date: 18.06.21
Constable 40173
BASIL READ
MINING BASIL READ MINING CONTRACTORS
B09738
Job Card No.

Plant No:
R 6z Received By: Breakdowns: X Total Job Time
Time:
Date:
20 Time: Service: Time Stop:
20wo\
|//1 O 6 /20zT Smr End: Preventive: Time Start: luo
Reported By:ndrew Smr Start: Welding: Time Taken:
1/Lrs
Smr: W/shop Hrs: Accidents:
Location: Basil Read:

Contractor
Reported Problem: rumi _pipe lec

Work Carried Out: Actual time spent on each job


TimeStop Time Started Time Stop

Secslsuqer Leak
Sipiq Malliae fe qet fo 1k_pipe_ /S :O1/4 :3O|
Kamoi 6 o | oo
Rema PiPE
ASSenbng ulldn

Time Machine Ready for Work:


Work Carried Out By| Sejpiso/ a Person Notified Machine Available:LAN
Company Number:
Mo'SeL Aoezp- By Radio: In Person:

Signature
Signature: WORKING CONDITION)
Date: 18.06.21
Constaba 40173

(MACHINE IN SAFE AND Rev:3

You might also like