Professional Documents
Culture Documents
Plant No:
Received By: Breakdowns: X Total Job Time
Time:
L13 Time:
T
Date
Service: Time Stop 22hoo
|13/O6 20 22 Smr End:
Reported By:SorgE dA Smr Start:
Preventive: Time Start:
13 S
Welding: Time Taken: ws/o
Smr:
S
Location:
2432 W/shop Hrs: Accidents:
L IaeeUCe Basil Read:
Contractor:
B 09740
Plant No: H2 162 Received By:
e
Time: lo Breakdowns:XX Total Job
Time
Date:
S Time: Service: Time Stop: /GSS
20 2 Smr End:
Preventive Time Start: rhS7
Reported By:Ae Smr Start:
Welding: Time Taken:
Smr: s 2m
237% Wishop Hrs: Accidents:
Location: crcelet Basil Read:
Contractor
Reported Problem: acune t_OE
Signature:
Signature:
SAFE AND WORKING CONDITION)
(MACHINE IN Rev: 3 Date: 18.06.21
Constable 40173
BRM/B&E.PDEL.SFD.05033
BASIL READb
Job Card No.
Plant No:
R 6z Received By: Breakdowns: X Total Job Time
Time:
Date:
20 Time: Service: Time Stop:
20wo\
|//1 O 6 /20zT Smr End: Preventive: Time Start: luo
Reported By:ndrew Smr Start: Welding: Time Taken:
1/Lrs
Smr: W/shop Hrs: Accidents:
Location: Basil Read:
Contractor
Reported Problem: rumi _pipe lec
Secslsuqer Leak
Sipiq Malliae fe qet fo 1k_pipe_ /S :O1/4 :3O|
Kamoi 6 o | oo
Rema PiPE
ASSenbng ulldn
Signature
Signature: WORKING CONDITION)
Date: 18.06.21
Constaba 40173