OCS ENGINEERING & CONSTRUCTION (INDIA) PVT LTD

DYE PENETRANT TEST REPORT

Report No. OCSI-2018-023/DP 01 Customer SCHUF FETTEROLF

P.O. No. NPO18-1853/ NPO18-1607 Project Title BODY GEHAUSE

Drg. No. E117300-S2 Project No OCSI 2018-023

EQUIP. NO: 2018-023-A TO 2018-023-Z, 2018-023-AA TO 2018-023-AZ &


QTY: 70 NOS
2018-023-BA TO 2018-023-BR

SL.NO INSPECTED COMPONENT OBSERVATION REMARKS

1 FLANGE TO BODY (CS1) No recordable defects observed Accepted

DESCRIPTION OF DP KIT
TITLE MAKE B.NO&DATE REF. STD. CONFORMS TO

PB 22 34094
PENETRANT Flaw Mech
Nov 2017 to Dec 2019
FTC 170430
REMOVER Flaw Test April 2017 to Mar ASME Sec V B16.34
2020
FTC 172715
DEVELOPER Flaw Test
July 2017 to Jun 2020

INSPECTION PROCEDURE
1 PRE CLEANING Done ( By using Remover )

2 APPLY PENETRANT Done

3 DWELLING TIME 10 minutes

4 CLEANING Done (By using Remover and Lint free Cloth)

5 APPLY DEVELOPER Done

6 DEVELOPING TIME 15 to 20 minutes

7 POST CLEANING Done ( By using Remover)

OCSI PVT LTD SCHUF FETTEROLF

Signature Signature

Name VINOTH KUMAR Name


Date 10/5/2018 Date