Precision SURVEY

D .No 70/2020, St. Antony’s Road ,kaloor, Ernakulam


Mob: 8593052147,8943318707,Email: precisionsurvey121@gmail.com

SOIL INVESTIGATION REPORT

CLIENT
M/s Milma, Kerala Co-operative Milk Marketing Federation Ltd
Milma Bhavan, Pattom Palace P.O., Trivandrum

SITE
Thrippunithura, Ernakulam

Period of Investigation:29/08/2022 to 5/09/2022

TOPOGRAPHICAL SURVEY, BOUNDARY,CONTOUR,ROAD,RAIL,BUILDING ,


PIPE LINE ,PILE POINT SETOUT,SOILTEST ,BUILDING DOCUMENTATION,
EARTH WORK QUANTITY CALCULATION
REPORT ON SOIL INVESTIGATION CARRIED OUT FOR
THE PROPOSED CONSTRUCTION OF SOLAR PANEL
FOUNDATION AT THRIPPUNITHURA, ERNAKULAM.

1. SCOPE OF WORK
The scope of the project envisages sub-surface investigation carried
out for the purpose of the design of foundation for the proposed project. The
scope of the work also involves executing Six Bore Holes with related field tests,
collection of disturbed SPT Soil Samples.

2. CODES AND STANDARDS


All works were carried our as per given specification. Where not
specified, the latest relevant IS codes were followed.

3. PURPOSE
The purpose of the proposed Geo-Technical Investigation was to obtain
the following:-

a. To perform the required field investigation including soil boring with


related field tests within the bore hole, collecting samples.

b. To determine the type, extent to the sub-surface material upto 8.70m &
10.50m depth.

4. FIELD WORKS / TESTS


The Field work consists of:-
a. Executing Six Bore Holes upto 8.70m & 10.50m depth.

b. Obtaining disturbed soil samples and finding out SPT ‘N’ values.
5 . PROGRAMME OF INVESTIGATION
Keeping in view of the type of structure and loading pattern Six Bore
Holes were proposed. The details of the boreholes are attached duly showing
the approximate dimensions with respect to the site. (Site Plan).

6. PROCEDURE
The Boreholes were executed using Auger Drilling method. Circulation
of bentonite slurry was used for advancing the boreholes and stabilizing the
side. Casing pipes were introduced to protect the first few meters. Standard
penetration tests were conducted at regular intervals and also at points where
change of strata was observed. Representative samples were collected and
sent all BH’s for laboratory analysis. Foundation recommendation obtained
from structural consultant.

7. LABORATORY INVESTIGATION

Laboratory tests consists of the following:-

a) Physical identification of soil

b) Determination of natural water content.

c) Specific Gravity

d) Atterberg’s limit (Liquid limit and plastic limit)

e) Mechanical analysis of finding sand, clay and soil fractions.


Project

Proposed Construction of Solar Panel Foundation


at Thrippunithura, Ernakulam.

Client

M/s Milma, Kerala Co-operative Milk Marketing Federation Ltd.,


Milma Bhavan, Pattom Palace P.O., Trivandrum.

BH-2
5.2
m
0

0m
.8
14

0m
18.2
Milma
BH-1 Parlor

Main Gate
Project

Proposed Construction of Solar Panel Foundation


at Thrippunithura, Ernakulam.

Client

M/s Milma, Kerala Co-operative Milk Marketing Federation Ltd.,


Milma Bhavan, Pattom Palace P.O., Trivandrum.

Gate
N Security
Office

BH-4
m

4.
5
0

0
.0

m
13

Milma
BH-3 Office Building
Project

Proposed Construction of Solar Panel Foundation


at Thrippunithura, Ernakulam.

Client

M/s Milma, Kerala Co-operative Milk Marketing Federation Ltd.,


Milma Bhavan, Pattom Palace P.O., Trivandrum.

5m

5m BH-6
Gate

13.80 m

19
.0
m

Plant Area
BH-5

Gate
N
PROJECT : Proposed Solar Panel Foundation DATE OF COMMENCE : 29-08-2022
SITE : Thrippunithura (Milma) DATE OF COMPLETION : 29-08-2022
1/1
BORE HOLE NO. : BH 01
GROUND WATER LEVEL : Apx.0.40m Below G/L
TYPE OF BORING : Rotary Drilling

BORE LOG CHART & DATA SHEET

Standard Penetration Test Data Graph of ‘N’


Depth Thickness
Soil Visual Description of Value
in of Layers Remarks
Profile Soil Depth ‘N’
Meter (M) 10 20 30 40 50 >50
(m) 15 30 45 Value

1.00

2.00 1 0 1 1
Clayey, Silty, 5.10
Fine SAND - (Grey) 3.00 1 0 0 0

4.50 1 1 0 1

5.10

Slightly Sandy, 6.00 4 5 5 10


Clayey, SILT 3.60
(Golden Brownish
Yellow) 7.50 6 7 8 15

8.70 8.70 >50 - - >50 Balance 45cm


Bore Hole Terminated SPT Rebounded W/o Sample
at 8.70m depth

Site-in-charge
PROJECT : Proposed Solar Panel Foundation DATE OF COMMENCE : 31-08-2022
SITE : Thrippunithura (Milma) DATE OF COMPLETION : 31-08-2022
1/1
BORE HOLE NO. : BH 02
GROUND WATER LEVEL : Apx.0.40m Below G/L
TYPE OF BORING : Rotary Drilling

BORE LOG CHART & DATA SHEET

Standard Penetration Test Data Graph of ‘N’


Depth Thickness
Soil Visual Description of Value
in of Layers Remarks
Profile Soil Depth ‘N’
Meter (M) 10 20 30 40 50 >50
(m) 15 30 45 Value
Slightly Clayey, Silty,
Gravelly, Medium SAND 1.70
1.00 1 1 0 1
(Yellowish Grey)
1.70
2.00 1 0 1 1

3.00 1 1 0 1
Slightly Sandy, 3.90
Clayey, SILT - (Grey)
4.50 1 1 0 1

5.60
6.00 4 5 6 11
Slightly Sandy, Clayey,
SILT - (Reddish Brown)
2.40
- Laterite Soil
7.50 7 7 8 15

8.00 8.70 >50 - - >50 Balance 45cm


Bore Hole Terminated SPT Rebounded W/o Sample
at 8.70m depth

Site-in-charge
PROJECT : Proposed Solar Panel Foundation DATE OF COMMENCE : 31-08-2022
SITE : Thrippunithura (Milma) DATE OF COMPLETION : 31-08-2022
1/1
BORE HOLE NO. : BH 03
GROUND WATER LEVEL : Apx.0.10m Below G/L
TYPE OF BORING : Rotary Drilling

BORE LOG CHART & DATA SHEET

Standard Penetration Test Data Graph of ‘N’


Depth Thickness
Soil Visual Description of Value
in of Layers Remarks
Profile Soil Depth ‘N’
Meter (M) 10 20 30 40 50 >50
(m) 15 30 45 Value

Slightly Clayey, Silty, 1.00 1 0 1 1


Fine SAND 2.60
(Whitish Yellow) 2.00 1 0 1 1
2.60
3.00 1 0 0 0
Slightly Sandy, 3.00
Clayey, SILT (Grey) 4.50 1 0 0 0

5.60
6.00 4 4 4 8
Clayey, Gravelly, Silty,
SAND (Yellow) 2.90
- Laterite Soil 7.50 5 7 6 13

8.50
Slightly Gravelly, 9.00 3 3 6 9
Clayey, Sandy, SILT 2.00
(Golden Yellow)
10.50 10.50 4 6 6 12

Bore Hole Terminated


at 10.50m depth

Site-in-charge
PROJECT : Proposed Solar Panel Foundation DATE OF COMMENCE : 01-09-2022
SITE : Thrippunithura (Milma) DATE OF COMPLETION : 01-09-2022
1/1
BORE HOLE NO. : BH 04
GROUND WATER LEVEL : Apx.0.0m Below G/L
TYPE OF BORING : Rotary Drilling

BORE LOG CHART & DATA SHEET

Standard Penetration Test Data Graph of ‘N’


Depth Thickness
Soil Visual Description of Value
in of Layers Remarks
Profile Soil Depth ‘N’
Meter (M) 10 20 30 40 50 >50
(m) 15 30 45 Value

Slightly Clayey, Silty,


Fine SAND 2.50 1.00 1 1 1 2
(Whiteish Yellow)
2.00 1 1 1 2
2.50
3.00 1 1 0 1
Sandy, Clayey, 2.70
SILT - (Grey)
4.50 1 0 1 1

5.20
Slightly Gravelly,
Clayey, Silty, SAND - 2.00 6.00 2 2 2 4
(Greyish Yellow)
- Laterite Soil
7.20
7.50 2 3 2 5
Slightly Gravelly, Sandy,
Clayey, SILT 2.30
(Greyish Yellow)
- Laterite Soil 9.00 4 5 5 10

9.50
Slightly Gravelly, Clayey, Sandy,
1.00
SILT - (Whiteish Yellow)
10.50 10.50 6 6 8 14

Bore Hole Terminated


at 10.50m depth

Site-in-charge
PROJECT : Proposed Solar Panel Foundation DATE OF COMMENCE : 02-09-2022
SITE : Thrippunithura (Milma) DATE OF COMPLETION : 02-09-2022
1/1
BORE HOLE NO. : BH 05
GROUND WATER LEVEL : Apx.0.20m Below G/L
TYPE OF BORING : Rotary Drilling

BORE LOG CHART & DATA SHEET

Standard Penetration Test Data Graph of ‘N’


Depth Thickness
Soil Visual Description of Value
in of Layers Remarks
Profile Soil Depth ‘N’
Meter (M) 10 20 30 40 50 >50
(m) 15 30 45 Value

1.00 1 2 1 3

2.00 1 0 1 1

3.00 1 0 0 0
Sandy, Clayey, 7.00
SILT - (Grey)
4.50 1 0 0 0

6.00 1 1 0 1

7.00
Slightly Gravelly,
Clayey, Silty, SAND 7.50 7 10 10 20
(Reddish Yellow) 1.70
- Laterite Soil
8.70
Slightly Gravelly, 9.00 9 9 9 18
Clayey, Silty, SAND 1.80
(Greyish Yellow)
- Laterite Soil
10.50 10.50 7 7 9 16

Bore Hole Terminated


at 10.50m depth

Site-in-charge
PROJECT : Proposed Solar Panel Foundation DATE OF COMMENCE : 02-09-2022
SITE : Thrippunithura (Milma) DATE OF COMPLETION : 02-09-2022
1/1
BORE HOLE NO. : BH 06
GROUND WATER LEVEL : Apx.0.20m Below G/L
TYPE OF BORING : Rotary Drilling

BORE LOG CHART & DATA SHEET

Standard Penetration Test Data Graph of ‘N’


Depth Thickness
Soil Visual Description of Value
in of Layers Remarks
Profile Soil Depth ‘N’
Meter (M) 10 20 30 40 50 >50
(m) 15 30 45 Value

Clayey, Silty, Fine SAND -(Golden 1.50


Yellow) - Laterite Soil 1.00 1 1 1 2
1.50
Clayey, Silty, Fine SAND - 1 1
1.30 2.00 0 1
(Yellowish Grey) - Laterite Soil
2.80
3.00 1 0 0 0

4.50 1 0 0 0
Slightly Sandy, 4.40
Clayey, SILT - (Grey)

6.00 1 0 0 0

7.20
7.50 8 9 8 17
Clayey, Gravelly, Silty,
SAND 3.30
(Yellowish Grey) 9.00 8 10 9 19
- Laterite Soil

10.50 10.50 9 12 11 23

Bore Hole Terminated


at 10.50m depth

Site-in-charge
STRUCTURAL DESIGN .GEOTECHNICAL .SOFTWARE DEVELOPMENT. PROJECT MANAGEMENT.
CONSTRUCTION ERP.TRAINING.SHOP DRAWING.QUANTITY SURVEY.QUALITY CONTROL. BIM

S&R/FNR/22/9382
Tuesday, September 06, 2022
Elamkulam
Prepared By : Ammu Jacob Varghese (+919947756138)
Checked By : Keerthi D S (+919074139665)

Site : Thrippunithura, Ernakulam.


Project : Proposed Construction of Solar Panel Foundation.
Client : M/s. Milma, Kerala Co-operative Milk Marketing Federation Ltd.
Soil Investigation : Precision Survey (+918593052147)
Bore-hole Details: 1 to 6 (29/08/2022 to 02/09/2022)

Borehole Details

In BH-3, From ground level to 2.6 m slightly clayey silty fine sand having N value 1
is found. Below this layer slightly sandy clayey silt with N value 0 is available
between 2.6 m to 5.6 m. Following the above layer 5.6 m to 8.5 m is found to be
clayey gravelly silty sand with N value varying 8 to 13. From 8.5 m to 10.5 m slightly
gravelly clayey sandy silt having N value varying from 9 to 12 was noted. Water table
was noted at a depth of 0.1 m from ground level in the borehole during the time of
investigation.

Recommendation

1.BH 1 & 2: For medium structures, tractor bored pile resting in slightly sandy clayey
silt with N Value > 50 at a depth of 8.7 m, can be provided with the following
capacities. Ensure the same strata is available up to a depth of 4 m from the pile tip.

Dia (cm) Axial Capacity (kN)


40 200
45 240
50 280

2.BH 3 & 4: For medium structures, tractor bored pile resting in slightly gravelly
clayey sandy silt with N Value > 12 at a depth of 10.5 m, can be provided with the
following capacities. Ensure the same strata is available up to a depth of 4 m from the
pile tip.

Dia (cm) Axial Capacity (kN)


40 90
45 110
50 130

3.BH 5 & 6: For medium structures, tractor bored pile resting in slightly gravelly
clayey silty sand / clayey gravelly silty sand with N Value > 17 at a depth of 7.5 m,
can be provided with the following capacities. Ensure the same strata is available
throughout the site.

Office: 2nd floor, S & R Building, Soonoro Church 1st Cross Road, Elamkulam , Kochi – 20,
Mob:+91 8281083000, GSTIN: 32AACPZ8566E1ZE, E-mail: srcgeotech@gmail.com,
www.sandrconsultants.com, www.aadspro.com
Powered by Construction Management software solution aadsproERP
STRUCTURAL DESIGN .GEOTECHNICAL .SOFTWARE DEVELOPMENT. PROJECT MANAGEMENT.
CONSTRUCTION ERP.TRAINING.SHOP DRAWING.QUANTITY SURVEY.QUALITY CONTROL. BIM

Dia (cm) Axial Capacity (kN)


40 100
45 120
50 140

4. Load test recommended.

5. Foundation to be constructed as per latest IS codes and to be certified by a


qualified site engineer.

6. Above recommendations are based on the soil investigation report and lab report.
Any difference in soil profile to be emailed to the consultant to modify the
recommendation or to the designer to change the design.

Reji Zachariah., B.Tech, M.S, IIT Chennai

Office: 2nd floor, S & R Building, Soonoro Church 1st Cross Road, Elamkulam , Kochi – 20,
Mob:+91 8281083000, GSTIN: 32AACPZ8566E1ZE, E-mail: srcgeotech@gmail.com,
www.sandrconsultants.com, www.aadspro.com
Powered by Construction Management software solution aadsproERP

You might also like