You are on page 1of 1

DOVWala

Narendra Kala, Contractors, Dehradu


columns ((M:
Columns
250 Concrete)
, D e s i g n
of
base

Total
loaa
at
column

1690 740 2430 aU


3/
LOBdp e r column
243 0 / 6 40
50 t
due to wind
moment load 1411 tm
overturning

1.54 x 80 x
4.28041 19.3 x 80x 21.18
91.7 tm
due to
Overturning
ent due
moment to seismic load, m, 4 35x 21.09 157 D
,

in leeward column
sitional thrust
=

Ad
.
4 X 141.1 ( 6 x 6.0)

in column 10.37 x 3.700 x 5 4.79 t


moment
Maximum
-

6X 2 2.1 w

esign of Column on Bending Axis


2XS:'6 5.80 tm
P
1.2 X 40.50 F 49.0 t Mu 1.2 X 4.79

49000 580000 = 0.036


40.02 0.123
250 x
fekD 250 x 40.0
From chart 56 of SP: 16 - 1980, corresponding p/fk 0.01

Hence, As 0.01x 25 X T x 40.0 1 400 = 3.142 Cm


Design of Leeward Column 60.75 t
(b)
40.50
Pu =
1.2 x( 40.50+15.7) 67.4t OrP =1.5 x 552.0 cm
67409 ( 0.4 x 250+ 0.008 x
067X 4150 35
As 0.008 X 552.0 4.42 cm c/c.
Provide 6 12 tor bars in each column throughout alongwith 8 tor ring

A: provided = 6.786 cm, OK. b 2 M S e c C a l k )

250
3°c 3e
3.3 Design of Braces (M: Concrete)
2x 3. 384A
Maximum moment in brace, M, 0.5M,(LJ) sec (t/n)
4.250 10.197 tm

Where Mo =
0.25 x 9.60x tm
7.654

2600
Hence, Mbu=1.5 M 1.5 x 0.5 x 10.197 3000 e( .38

and Fbu 2Mbu/L 2 Xx 7.654 2.6 =5.888 t


6
765400 =
D47
5.047 cm
, 0Umy
Ast = AsC =

0.87 X 4150 x 42 5.15 C


Ast provided
each brace.
o r dars on each face in
+1-
Provide 2 -16

58880
9

0.49 x 200 X 46U = 0.081 mm/mm


. y os
AsySy 0.87 x 415 x 460

0.4 x 200 ( 0.87 x 415)


= 0.222 mm /mm AscSU mv
(As/Syjmin 215 mm c/c.
Provide 12 8 otortwo legged, stirrups at. 63
FOUNDATION (M: 250 Concrete)

8.00 t/m LsM


Net bearing capacity of soil
=

243.0 t
otal load at column base
xtra surcharge 8.0 t

Total load 251.0 t

6
Designed by Prof. S.K. Agarwala, 23 C'v Lines, Rocrkee, (Phone: 01332 273190))