Professional Documents
Culture Documents
DATE March-31-2018
Termination Form
NAME: Hari B.K EMPLOYEE NO.: W172017
PREPARED BY:
Mr.Afshan Rimas
HR/Admin
APPROVED BY:
Clearance Form
NAME: IMRAN KHAN 15-Mar-18
PROJECT New Classic Store W172023
REF NO: Labour
2.
QR
3.
QR
2.
QR
3.
QR
An employee is required to handed over all the tools and personal protective equipment issued to him by the company and is
cleared of all liabilities to New Classic with regards to site work. He is instructed to bring this form to the various
Departments as stated below to obtain Clearance before collection of salary.
PREPARED BY:
Mr. Nasim Khan Mr. Mohammed Javed
HR/Admin Storekeeper
APPROVED BY:
Mr. Mahmut Baybara Mr. Mohammed Javed
C.E.O. Camp Boss
Resignation Letter
PROJECT: New Classic Store EMPLOYEE NO.: W172023
Respectfully your,
IMRAN KHAN
(signature)
A. Damage to Vehicle
INCIDENT REPORT NO. DATE AMOUNT
1.
QR
2. QR
3.
QR
4.
QR
5.
QR
An employee is required to pay over all the damages and violation issued to him by the company and authorities and will
be deducted to his salary. He must be cleared of all liabilities to UCC-KCT with regards to plant operation. He is
instructed to bring this form to the various Departments as stated below to obtain Clearance before collection of salary.
PREPARED BY:
Supervisor
APPROVED BY:
Leave Form
NAME: Joseph Johnson DATE FILLED: 28/12/2014
LEAVE PERIOD:
LEAVE TYPE:
Days Paid:
Days Unpaid:
APPROVED BY: