□ As Built
Contractor
TABLE OF CONTENTS
1.0 PURPOSE………………………………………………………………….. 3
2.0 SCOPE……………………………………………………………………… 3
1.0 Purpose
This procedure is to establish guideline for the installation of embedded plate on the second floor
slab of CCB – Switchgear Room prior to slab concreting works.
2.0 Scope
This procedure shall apply to all employees responsible for planning, supervising, and execution of all
activities covered by this procedure.
3.1 VPCI Project Manager - shall be the overall responsible for the implementation of this
procedure ensuring that works are completed on schedule and in conformity with
drawings and specifications.
3.2 VPCI Project EHS Manager shall ensure safe implementation of this procedure promoting an
Incident and Injury Free environment.
3.3 VPCI & GTC Global Inc. QA/QC Engineer shall be responsible for the
implementation of construction specification and standards and see to it that this
written method statement of the work shall be carried out.
3.4 GTC Global Inc. Construction Manager – shall have the overall responsibility for the
direction, monitoring, coordination and control of all the construction activities
attached and related to concrete works and the overall Health and Safety procedure.
3.5 GTC Global Inc. HSE Engineer along with the Safety Officer shall ensure
implementation of all safety procedures, safety measures related to the nature of
works being carried out and in accordance with the HSE Plan.
3.6 GTC Global Site Supervisor shall be directly involved in the planning and execution
of the activities. He shall be responsible for the preparation of work plan, safety
action plan and safety.
4.0 Resources
4.1 Manpower
Construction 1
Manager
Site Manager 1
QA/QC Engineer 1
Site Engineer 1
Safety Supervisor 1
Safety Officer 1
First Aider 1
4.2 Equipment & Tools
Welding Machine 1
Welding Rod 50 kgs
Welding gloves and Apron
Welding Handle 1
.0 Procedure
Supervisors and workers performing welding, cutting, and/or bracing operations shall be trained
in hazard recognition, evaluation, and control; fire protection; and safe work practices; and shall
adhere to requirements in this procedure.
.2 HOT WORKS
3. The metal surface shall be free of all chlorinated solvents during any welding or
cutting operations.
6.1 All personnel must wear appropriate PPE at all times. Personnel are empowered to stop work
if safety precautions are not in place.
6.2 The Job Site Supervisor shall ensure that all Safety requirements are put in practice, copy of
MS and JHA (Attached) are available on site for guidance and consultation.
6.3 Contractor Safety Representative shall carry out the safety site inspection to ensure the safety
requirements laid out in the safe work plan are followed during and after the completion of the
works.
6.4 Job Site Supervisor and Safety Representative shall be present at all time while works are in
progress.
6.5 Appropriate PTW to be prepared and implemented, modification without OWNER approval is
prohibited.
6.6 Assessed risk as necessary and communicated to concerned parties prior to start of any
work.
6.7 Safety briefing / Tool box talk must be conducted by Supervisors prior to start of work in the
language of workforce.
6.8 Incidents and injuries, damaged to property or near misses should be reported.
6.10 A clear and good communication must be maintained by all personnel involved on the
activity.
6.11 Personnel must be trained/experienced and familiarized with the scope of works to be
undertaken. The location of marshalling point must be identified, emergency evacuation
procedure must be clear to all workers, exercises must be conducted.
6.12 Contractor Safety Manager / Representative shall review Safety Action Plan.
7.0 Attachment
Attachment # 01.
Embedded Plate Installation
Drawing
Attachment # 02.
Risk Assessment