Professional Documents
Culture Documents
Report Huong Dong Nam 01 Nos BP92 Vs JA 405W (13 String 20)
Report Huong Dong Nam 01 Nos BP92 Vs JA 405W (13 String 20)
PVsyst TRIAL
Simulation variant :
Simulation parameters
Collector Plane Orientation
Huong Dong Nam 1 BP 92 vs JA 405 (13 string 20)
Simulation date
System type
Tilt
20/09/20 18h20
PVsyst TRIAL
PV Array Characteristics
PV module Si-mono Model JAM72S10-405/MR/1500V
Custom parameters definition Manufacturer JA Solar
Number of PV modules In series 20 modules In parallel 13 strings
Total number of PV modules Nb. modules 260 Unit Nom. Power 405 Wp
Array global power Nominal (STC) 105 kWp At operating cond. 94.2 kWp (55°C)
Array operating characteristics (50°C) U mpp 731 V I mpp 129 A
Total area Module area 522 m² Cell area 469 m²
PVsyst TRIAL
Pnom ratio 1.14
PVsyst TRIAL
PVsyst Evaluation mode
PVSYST V6.88 20/09/20 Page 2/5
PVsyst TRIAL
User's needs Unlimited load (grid)
Normalized productions (per installed kWp): Nominal power 105 kWp Performance Ratio PR
6 1.0
Lc : Collection Loss (PV-array losses) 0.68 kWh/kWp/day PR : Performance Ratio (Yf / Yr) : 0.852
0.9
Ls : System Loss (inverter, ...) 0.09 kWh/kWp/day
5 Yf : Produced useful energy (inverter output) 4.47 kWh/kWp/day
0.8
[kWh/kWp/day]
0.7
Performance Ratio PR
4
0.6
PVsyst TRIAL
Energy
3 0.5
0.4
Normalized
2
0.3
0.2
1
0.1
0 0.0
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
PVsyst TRIAL
GlobHor DiffHor T_Amb GlobInc GlobEff EArray E_Grid PR
kWh/m² kWh/m² °C kWh/m² kWh/m² MWh MWh
January 160.4 62.91 26.22 171.2 169.3 15.75 15.43 0.856
February 149.3 64.83 27.10 154.7 153.0 14.10 13.82 0.849
March 171.6 80.67 28.51 173.7 171.5 15.71 15.40 0.842
April 157.0 78.93 29.13 155.7 153.7 14.13 13.85 0.845
May 173.9 82.54 28.70 170.3 168.0 15.50 15.20 0.848
June 170.3 73.62 27.69 163.5 161.3 14.98 14.69 0.853
July 171.9 81.62 27.53 167.9 165.6 15.42 15.12 0.855
August 164.9 80.18 27.39 162.0 159.8 14.87 14.58 0.855
September 137.8 66.58 26.77 139.2 137.4 12.75 12.49 0.852
October 147.8 75.47 26.85 151.3 149.0 13.90 13.63 0.856
November 145.5 73.88 26.34 153.1 150.8 14.17 13.90 0.862
December 143.8 63.98 26.21 153.1 151.1 14.11 13.84 0.858
Legends: GlobHor
DiffHor
T_Amb
GlobInc
1894.3 885.21
GlobEff
EArray
E_Grid
PR
175.40 171.96 0.852
PVsyst TRIAL
User's needs Unlimited load (grid)
700
Values from 01/01 to 31/12
600
Energy injected into grid [kWh/day]
500
400
200
100
0
0 2 4 6 8 10
Global incident in coll. plane [kWh/m².day]
4000
3000
2000
0
0 20 40 60 80 100
Power injected into grid [kW]
PVsyst TRIAL
User's needs Unlimited load (grid)
PVsyst TRIAL
199.4 MWh Array nominal energy (at STC effic.)
-0.19% PV loss due to irradiance level
PVsyst TRIAL
0.00% Inverter Loss due to voltage threshold
-0.03% Night consumption
172.0 MWh Available Energy at Inverter Output
172.0 MWh Energy injected into grid
PVsyst TRIAL
PVsyst Evaluation mode
PVSYST V6.88 20/09/20 Page 5/5
PVsyst TRIAL
User's needs Unlimited load (grid)
The probability distribution variance is also depending on some system parameters uncertainties
Specified Deviation PV module modelling/parameters 1.0 %
PVsyst TRIAL
Inverter efficiency uncertainty 0.5 %
Soiling and mismatch uncertainties 1.0 %
Degradation uncertainty 1.0 %
Global variability (meteo + system) Variance 2.7 % (quadratic sum)
Probability distribution
0.50
0.40
0.35
0.30
P50 = 171961 kWh
E_Grid simul = 171961 kWh
Probability
0.25
0.20
P90 = 166024 kWh
0.15
0.05
0.00
PVsyst TRIAL
155000 160000 165000 170000 175000 180000 185000
E_Grid system production kWh