Professional Documents
Culture Documents
Normal 2
N-1 NA
Total 2
N-1 NA NA NA
N-1 NA NA NA
Total NA 150 NA
4) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 500/220KV &
220/132KV T/Fs)
Normal 207 6 6
N-1 NA NA NA
5) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 220/132KV
T/Fs)
N-1 NA NA
Form-4
Normal 6
N-1 NA
Total 6
N-1 NA NA NA
N-1 NA NA NA
Total NA 570 NA
4) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 500/220KV &
220/132KV T/Fs)
Normal 207 6 6
N-1 NA NA NA
5) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 220/132KV
T/Fs)
N-1 NA NA
Form-4
Name of T/Line:- 220KV Bund Road 1,2 At 500KV G/S NTDC Sheikhupura
Normal 3
N-1 NA
Total 3
N-1 NA NA NA
N-1 NA NA NA
Total NA 390 NA
4) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 500/220KV &
220/132KV T/Fs)
Normal 207 6 6
N-1 NA NA NA
5) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 220/132KV
T/Fs)
N-1 NA NA
Form-4
Name of T/Line:- 220KV Bund Road 3,4 At 500KV G/S NTDC Sheikhupura
Normal 2
N-1 NA
Total 2
N-1 NA NA NA
N-1 NA NA NA
Total NA 180 NA
4) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 500/220KV &
220/132KV T/Fs)
Normal 208 6 6
N-1 NA NA NA
5) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 220/132KV
T/Fs)
N-1 NA NA
Form-4
Normal 10
N-1 NA
Total 10
N-1 NA NA NA
N-1 NA NA NA
Total NA 780 NA
4) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 500/220KV &
220/132KV T/Fs)
Normal 204 6 6
N-1 NA NA NA
5) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 220/132KV
T/Fs)
N-1 NA NA
Form-4
Normal 1
N-1 NA
Total 1
N-1 NA NA NA
N-1 NA NA NA
Total NA 120 NA
4) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 500/220KV &
220/132KV T/Fs)
Normal 206 6 6
N-1 NA NA NA
5) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 220/132KV
T/Fs)
N-1 NA NA
Form-4
FORM-4
QUALITY OF SUPPLY VOLTAGE FOR THE PERIOD OF 4-2021 to 6-2021
Normal NILL
90
46
FORM-4
QUALITY OF SUPPLY VOLTAGE FOR THE PERIOD OF 4-2021 to 6-2021
46
FORM-4
QUALITY OF SUPPLY VOLTAGE FOR THE PERIOD OF 4-2021 to 6-2021
Normal
220KV BUND ROAD-1
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
to 6-2021
Remarks
Time
10:00
14:00
13:00
90
46
FORM-4
QUALITY OF SUPPLY VOLTAGE FOR THE PERIOD OF 4-2021 to 6-2021
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Deputy Manager
500KV Grid Station NTDC,
Sheikhupura
to 6-2021
Remarks
Time
14:00
13:30
uty Manager
KV Grid Station NTDC,
90
46
FORM-4
QUALITY OF SUPPLY VOLTAGE FOR THE PERIOD OF 4-2021 to 6-2021
46
FORM-4
QUALITY OF SUPPLY VOLTAGE FOR THE PERIOD OF 4-2021 to 6-2021
Normal
Normal
Normal
Normal
Normal
Normal
Ravi Road
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
90
46
Form-4
Normal 0
N-1 NA
Total 0
N-1 NA NA
N-1 NA NA
Total NA N/A
4) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 500/220KV & 220/132KV T/Fs)
N-1 NA NA
5) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 220/132KV T/Fs)
N-1 NA NA
Form-4
Normal
N-1 NILL
Total
Normal
NILL
N-1
Normal
N-1 NILL
Total
4) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 500/220KV & 220/132KV T/Fs)
Normal
NILL
N-1
5) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 220/132KV T/Fs)
Normal
NILL
N-1
Form-4
Normal
N-1 N/A
Total
Normal
N/A
N-1
Normal
N-1 N/A
Total
4) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 500/220KV & 220/132KV T/Fs)
Normal
N/A
N-1
5) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 220/132KV T/Fs)
Normal
N/A
N-1
Form-4
Normal
N-1 N/A
Total
Normal
N/A
N-1
Normal
N-1 N/A
Total
4) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 500/220KV & 220/132KV T/Fs)
Normal
N/A
N-1
5) Tap Position of Transformers at the Time of Voltage Beyond Permitted Value (For 220/132KV T/Fs)
Normal
N/A
N-1
Form-4
4-2021 to 6-2021)
4-2021 to 6-2021)
Date
N/A
NA
4-2021 to 6-2021)
%age of time
N/A
NA
NA
4-2021 to 6-2021)
N/A
NA
4-2021 to 6-2021)
N/A
NA
4-2021 to 6-2021)
4-2021 to 6-2021)
Date
4-2021 to 6-2021)
%age of time
4-2021 to 6-2021)
4-2021 to 6-2021)
4-2021 to 6-2021)
Date
4-2021 to 6-2021)
%age of time
4-2021 to 6-2021)
4-2021 to 6-2021)
4-2021 to 6-2021)
Date
4-2021 to 6-2021)
%age of time
4-2021 to 6-2021)
4-2021 to 6-2021)
SYSTEM RELIABILITY
FOR THE YEAR 2021-2022
500KV G/S NTDC SHEIKHUPURA
Quarterly (4.2021 To 6.2021)
A. SYSTEM DURATION OF INTERRUPTION
1 2 3 4
Total outages Total number of
Sr.No. Month hours recorded interconnection
at all points
interconnection
1 Apr-21 points 0 5
2 May-21 0
(excluding 5
3 Jun-21 132KV0 line 5
tripping )
4 Total 0 5
YEAR 2021-2022
terly (4.2021 To 6.2021)
PTION
5
System duration
of interruption
5 = 3/4
0.00
0.00
0.00
0.00
FORM -3
500KV G/S NTDC SHEIKHUPURA
1 2
1 2 3 4
1 Apr-21 (excluding
0 132KV 10
line
2 May-21 Trippings
0 ) 10
3 Jun-21 0 10
4 Total 0 10
PTION
YEAR 2021-2022
terly (4.2021 To 6.2021)
System frequency
of interruption
5=3/4
0.00
0.00
0.00
0.00
FORM - 5
SYSTEM FREQUENCY
Number of days /
Measurement
Months of
Sr. No. interval
measurement
( Minutes)
over a year
FORM - 5
FREQUENCY Remarks
Highest /
Lowest
Duration of %age
frequency / Date
Variation Variation
recorded /
measured
Remarks
Time
FORM-4
QUALITY OF SUPPLY VOLTAGE FOR THE PERIOD OF 4-2021 to 6-2021
Normal
220KV BUND ROAD-1
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
to 6-2021
Remarks
Time
10:00
14:00
13:00
90
46
FORM-4
QUALITY OF SUPPLY VOLTAGE FOR THE PERIOD OF 4-2021 to 6-2021
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Normal
Deputy Manager
500KV Grid Station NTDC,
Sheikhupura
to 6-2021
Remarks
Time
14:00
13:30
uty Manager
KV Grid Station NTDC,
90
46
FORM-4
QUALITY OF SUPPLY VOLTAGE FOR THE PERIOD 4-2021 to 6-2021
List of Highest/
VOLTAGE Transmission Lowest Duration of %age of Remarks
CLASS circuits violting voltage Variation variation
voltage criteria recorded Date Time
HVDC-I
500KV
Normal NILL
FORM-4
QUALITY OF SUPPLY VOLTAGE FOR THE PERIOD 4-2021 to 6-2021
List of Highest/
VOLTAGE Transmission Lowest Duration of %age of Remarks
CLASS circuits violting voltage Variation variation
voltage criteria recorded
500KV
Date Time
HVDC-II
Normal nill
Deputy Manager
500KV Grid Station NTDC,
Sheikhupura
FORM-4
QUALITY OF SUPPLY VOLTAGE FOR THE PERIOD 4-2021 to 6-2021
List of Highest/
VOLTAGE Transmission Lowest Duration of %age of Remarks
CLASS circuits violting voltage Variation variation
voltage criteria recorded
Date Time
Deputy Manager
500KV Grid Station NTDC
Shikhupura
FORM-4
QUALITY OF SUPPLY VOLTAGE FOR THE PERIOD 4-2021 to 6-2021
List of Highest/
VOLTAGE Transmission Lowest Duration of %age of Remarks
CLASS circuits violting voltage Variation variation
voltage criteria recorded
Date Time
Deputy Manager
500KV Grid Station NTDC
Shikhupura
FORM-1
SYSTEM RELIABILITY
SYSTEM DURATION OF INTERRUPTION
(04/2021 TO HOURS
TOTAL OUTAGES 06/2021)
RECORDED AT ALL
INTERCONNECTION
POINTS (EXCLUDING TOTAL No. OF
Month
132KV LINE TRIPPING) INTERCONNECTION.
FORM-3
THE GAZZETE OF PAKISTAN, EXTRA.
SYSTEM SECURITY
4/2021 TO 6/2021
PER CIRCUIT
Grid Station Name of Circuit ENERGY NOT SERVED
=PXT(MWH)
1 2
132KV Ataabad Circuit-1 P1
Sheikhupura (Lahore)
FORM 2
SYSTEM FREQUENCY OF INTERRUPTION
FOR 04-2021 to 06-2021
Total No. of outages
Total No. of 132KV
MONTH recorded at 132KV
circuits
outgoing
Apr-21 NIL 10
May-21 NIL 10
Jun-21 NIL 10
N
NIL NIL
NIL NIL
NIL NIL
Deputy Manager,
NTDC,Sheikhupura
3
STAN, EXTRA.
URITY
2021
TOTAL ENERGY
PER CIRCUIT SERVED
ENERGY NOT SERVED =P1+P2+P3+P4+P5+P6
=PXT(MWH) +P7+P8
(MWH)
3
0
0
0
0
0
0
0
0
0
0
0
0
Deputy Manager,
500KV Grid Station,
NTDC,Sheikhupura
10 NIL
10 NIL
10 NIL
Deputy Manager,
500KV Grid Station,
NTDC,Sheikhupura
Name of Transmission Line: 500KV New Lahore-II ,Bhikhi, New Lahore-I & Nokhar
at 500KV Grid Station Sheikhupura.
April 2020 to June 2020 April 2021 to June 2021
Month Condition Highest/l Duration of %age of Highest/l Duration of %age of
owest Variation in Variation owest Variation in Variation
voltage minutes voltage minutes
Normal 533 120 -6.60% NIL NIL NIL
Apr-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
May-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
Jun-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
Quarter N-1 NIL NIL NIL NIL NIL NIL
Deputy Manager,
500KV Grid Station,
NTDC,Sheikhupura
Name of Transmission Line: 500KV HVDC-1
at 500KV Grid Station Sheikhupura.
April 2020 to June 2020 April 2021 to June 2021
Month Condition Highest/l Duration of %age of Highest/l Duration of %age of
owest Variation in Variation owest Variation in Variation
voltage minutes voltage minutes
Normal 533
recorded 120 -6.60% NIL
recorded NIL NIL
Apr-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
May-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
Jun-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
Quarter N-1 NIL NIL NIL NIL NIL NIL
Deputy Manager,
500KV Grid Station,
NTDC,Sheikhupura
Name of Transmission Line: 500KV HVDC-2
at 500KV Grid Station Sheikhupura.
April 2020 to June 2020 April 2021 to June 2021
Month Condition Highest/l Duration of %age of Highest/l Duration of %age of
owest Variation in Variation owest Variation in Variation
voltage minutes voltage minutes
Normal 533
recorded 120 -6.60% NIL
recorded NIL NIL
Apr-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
May-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
Jun-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
Quarter N-1 NIL NIL NIL NIL NIL NIL
Deputy Manager,
500KV Grid Station,
NTDC,Sheikhupura
Name of Transmission Line: 500KV Bhikhi
at 500KV Grid Station Sheikhupura.
April 2020 to June 2020 April 2021 to June 2021
Month Condition Highest/l Duration of %age of Highest/l Duration of %age of
owest Variation in Variation owest Variation in Variation
voltage minutes voltage minutes
Normal 533
recorded 120 -6.60% NIL
recorded NIL NIL
Apr-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
May-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
Jun-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
Quarter N-1 NIL NIL NIL NIL NIL NIL
Deputy Manager,
500KV Grid Station,
NTDC,Sheikhupura
Name of Transmission Line: 500KV Nokhar
at 500KV Grid Station Sheikhupura.
April 2020 to June 2020 April 2021 to June 2021
Month Condition Highest/l Duration of %age of Highest/l Duration of %age of
owest Variation in Variation owest Variation in Variation
voltage minutes voltage minutes
Normal 533
recorded 120 -6.60% NIL
recorded NIL NIL
Apr-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
May-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
Jun-21 NIL NIL NIL NIL NIL NIL
N-1
Normal NIL NIL NIL NIL NIL NIL
Quarter N-1 NIL NIL NIL NIL NIL NIL
Deputy Manager,
500KV Grid Station,
NTDC,Sheikhupura
MONTHLY COMPARISON
Name of Transmission Line: 220KV KLP Line at 500KV G/S NTDC Skp.
Name of Transmission Line: 220KV Wapda Town at 500KV G/S NTDC Skp.
Name of Transmission Line: Bund Road 1,Bund Road 2 at 500KV G/S NTDC Skp.
Name of Transmission Line: 220KV Bund Road-3,Bund Road -4 Line at 500KV G/S NTDC Skp.
Name of Transmission Line: 220KV Atlas P/House at 500KV G/S NTDC Skp.
Name of Transmission Line: Ravi Road Line at 500KV G/S NTDC Skp.
Time
11:30
9:30
12:00
14:00
11:00
15:00
11:30
13:30
10:00
10:00
14:30
16:30
10:30
18:00
17:00
19:00
16:00
15:30
15:30
13:00
9:30
11:00
90
46