Arup Total Design:
municipal, structural, electromechanical, fire, lighting, facade,
traffic, risk control, acoustic design services
Arup
Total Design
Peabody Essex Museum Kauffman Center for the Performing Arts
SITE
Arup office
City of Mountain
Chongqing China
山之城 重庆
RCCQ
Raffles
Mainland
CitySTR
Chongqing
Design
- -Singapore
Hong Kong18th19Oct
th March
2019 2019
The 10th and the
largest Raffles
City in the world
• Transportation hub
with bus terminals,
ferry terminals, metro
stations
and
• Hybrid outrigger
system with South Towers
structural fuse • Curved towers
T2 T3S T4S T5
Soil Soil
Bed Rock
Foundation
Podium and Basement
Slope • Very large hand-dug caisson design and
• Very long concrete structures without MJ
• Slope stability construction
• Long span steelwork • Mixed use of hand-dug caisson &
analysis
• Anti-Sliding Piles machined bored pile
Hybrid outrigger system
with structural fuse
for tall buildings
CIC Construction Innovation Award 2019
How outriggers work
Completed in 1988
Traditional
outrigger
system
safe, easy
and
economical
to build
Efficiency Comparison Design
-The economic challenges from client
&
Experiment
Jerman,
Please
replace
with a
video
Performance
Objectives
Used in real project
For the
1st time
In
RCCQ
Length:300m
Width:30m
Height:22.5m
Top Level:220.93m
Max. Span:54m
Cantilever Span:26.8m
Height from Ground:193m
Link Bridge Comparison
MBS Sky park
• Connected Towers:3
• Length :340m
• Steelwork Tonnage: 7,700t
• Cantilever Length:65m
RCCQ Conservatory
• Connected Towers: 6
• Length :280m
• Steelwork Tonnage: 10,000t
• Cantilever Length:27.5m
• Deformation
magnified x10
Lab Experiment
Arup
Conservatory
Design
Combination Lab Experiment with
Digital
Construction simulation
BIM Multi-discipline Coordination
BIM
• Sub Truss
Main Truss
Sub Bridge
• Horizontal Brace Sub Truss
Horizontal Brace
• Sub bridge
Main Bridge
Main Bridge
Horizontal
Main Truss Sub Truss Sub Bridge
Brace
• Complex use
(Observatory, bar,
restaurant)
• High architectural
appearance
requirement
• high observatory
platform
• To propose tailored
acceptance criteria
of vibration for
different area
• TMD embedded in
steel beam to TMD
reduce vibration on TMD inside steel beam
glass observatory
platform
• To propose
management
control to meet the
acceptance criteria
• Tower Analysis:
Delete Tower Analysis:
intermediate small analysis cases:
Case 1 - to remove intermediate small gravity
gravity columns of columns and check the consequence on
tower then check surrounding elements during the extreme
conditions
surrounding
elements, or add Case 2 - to add an extreme large horizontal
load act accidental collision and check the
an extreme large safety of the corner mega columns
horizontal load
and check corner
mega columns
Tower Analysis Case 1 Tower Analysis Case 2
Raffles City Chongqing
- Singapore 18th Oct 2019
Global Network
& ONE
Local experience
Boston
(45/10) Chongqing Beijing
(40/20) (150/30)
Shanghai
New York (250/50)
(350/70)
Hong Kong
(1800/300)
The
Rising Symbol
of
West China