You are on page 1of 1

DATA PREDIKSI DAYA DUKUNG TIANG PANCANG BETON (HILEY FORMULA)

PEKERJAAN PEMBANGUNAN DERMAGA CURAH CAIR PELABUHAN GRESIK

Pile Location :
JETTY Hiley Formula:

Pile Type :
Spiral Steel Pipe Pile R pakai = ef . R . ( 1 / SF )

Pile Dimension: W (Weight of Ram) 8,50 ton


Do 1016,00 mm ef (Efisiensi palu) 0,85
t 19,00 mm SF (Safety Factor) 3,00
N (Koeff. Restitusi) 0,50
Berat Pile Shoe 0,30 ton
Hammer Type Berat Tiang 0,2358 ton/m

K R
Waktu Pemancangan Pile Length H P S PDA
Tanggal Rebound at Pile Bearing R pakai
No. Pile No. Ram Stroke Weight of Pile Final Pent blow Result
Pemancangan Final Blow Capacity (ton)
(cm) (ton) (cm) (ton)
Start Finish Bt Up Up+ Total (cm) (ton)

1 Rab, 02 Jun 21 11:00 wib 11:45 wib A.3 37 250,00 9,02 1,20 1,50 966,20 273,76 674,00
2 Sab, 05 Jun 21 10:55 wib 11:30 wib B.22 37 250,00 9,02 0,80 1,50 1.134,24 321,37
3 Sen, 07 Jun 21 10:00 wib 10:50 wib D.47 39 250,00 9,49 1,90 2,00 658,52 186,58
4 Sel, 08 Jun 21 13:00 wib 13:40 wib A.4 40 250,00 9,73 2,30 1,90 606,84 171,94
5 Kam, 10 Jun 21 11:00 wib 11:45 wib B.21 38 250,00 9,26 1,80 2,00 681,11 192,98

You might also like