Bongawan Bridge - Estimated Qty Steel Bar

RC bar, tonne
Boring Not Length of
Pile Total Length, Boring to Not Exceeding Exceeding Total Concreted Cut Off Pile, Permanent
Item Location Date through Exceeding Temporary
Dia., m m earth, m 20mm 20mm Tonnage, t Length, m nr Casing, m
Rock, m 20mm Casing, m
(main bar) (main bar)
(Helical)
1 Pier 1 Pile No.1 21.08.2019 1.20 27.90 19.90 8.00 0.00 4.30 0.86 5.16 27.90 0 14.50

A Total Remeasurement Qty 27.90 19.90 8.00 0.00 4.30 0.86 5.16 27.90 0 14.50 0.00