Mandahan Bridge - Remeasurement for Bored Pile (based on Bore Pile Record)

RC bar, tonne
Boring Not Length of
Pile Total Length, Boring to Not Exceeding Exceeding Total Concreted Cut Off Pile,
Item Location Date through Exceeding Temporary
Dia., m m earth, m 20mm 20mm Tonnage, t Length, m nr
Rock, m 20mm Casing, m
(main bar) (main bar)
(Helical)
1 Abutment A, Pile No. 1 22.02.2021 0.90 34.00 26.80 7.20 2.87 0.75 3.62 34.00 1 19.50

2 Abutment A, Pile No. 2 02.03.2021 0.90 34.04 26.84 7.20 2.87 0.75 3.62 34.04 1 19.50

3 Abutment A, Pile No. 3 25.02.2021 0.90 34.04 26.84 7.20 2.87 0.75 3.62 34.04 1 19.50

4 Abutment A, Pile No. 4 7.11.2019 0.90 36.46 29.26 7.20 3.13 0.80 3.93 36.46 1 18.00

5 Abutment A, Pile No. 5 18.04.2019 0.90 32.26 26.26 6.00 2.73 0.71 3.44 32.26 1 22.00

6 Abutment A, Pile No. 6 09.01.2020 0.90 33.76 26.56 7.20 2.85 0.74 3.59 33.76 1 22.00

7 Abutment B, Pile No. 1 10.03.2021 0.90 34.07 18.87 15.20 2.87 0.75 3.62 34.07 1 20.50

8 Abutment B, Pile No. 2 17.03.2021 0.90 33.97 18.77 15.20 2.87 0.75 3.62 33.97 1 20.50

9 Abutment B, Pile No. 3 13.03.2021 0.90 34.17 18.97 15.20 2.88 0.75 3.63 34.17 1 20.50

10 Abutment B, Pile No. 4 17.01.2020 0.90 35.66 20.46 15.20 3.00 0.78 3.78 35.66 1 22.00

11 Abutment B, Pile No. 5 25.04.2019 0.90 34.08 20.08 14.00 2.87 0.75 3.62 34.08 1 19.50

12 Abutment B, Pile No. 6 09.01.2020 0.90 35.66 20.46 15.20 3.00 0.78 3.78 35.66 1 21.00

A Total Remeasurement Qty 412.17 280.17 132.00 0.00 34.81 9.06 43.87 412.17 12 244.50