You are on page 1of 1

BAR BENDING SCHEDULE

M-701: 132 KV OHTL KUDMI TO SABYA: OPEN FOUNDATION


APPLICABLE FOR : GANTRY- 4/1 & 9/1

STEEL REQUIREMENT FOR PAD AND CHIMNEY


Length in No. of Bar/ No. of Bars/ No. of Unit Wt
S.No Item Description Shape Dia(mm) Total Wt (KG)
meter leg tower Tower Locs. (kg/m)

3550
LONGITUDINAL
1 Pedestal
BARS 3.850 20 128 384 2 2.470 7303.296

300

150

810
2 Pedestal TIE BARS 3.540 12 56 168 2 0.888 1056.223

810

5800
6.400 20 50 150 2 2.470 4742.400
3 Footing TOP BARS 300
300

4 Footing BOTTOM BARS 6.400 20 42 126 2 2.470 3983.616

5800

500
1.360 16 7 21 2 1.580 90.264
##

5 Footing CHAIRS
200
20 mm Total
Total No of Tower 2 16029.312
in KGs=
16 mm Total
90.264
in KGs=
12 mm Total
1056.223
in KGs=
Grand Total
17175.798
in KGs
Grand Total
17.176
1 In MT=