Inspection Report: General Information
Inspection Report: General Information
INSPECTION REPORT
General Information
PSC: PM-3 South Report Number: BR-2018- 202
Platform: BTA Inspection Type: CVI
POUR POINT
Product / Service CP Material SS 316L
DEPRESSANT
Corrosion
Insulation No Type N/A Line Rating # N/A N/A
Allowance
Design Press. (kpag) No info in Credo Barg N/A Design Temp.(deg°C) 65
Inspection Results
Reason for Inspection-QM Minor Inspection Campaign 2018
The external close visual inspection carried out on listed equipment as part of minor inpection - NVES04CC00 programme
Results
1)General view of 09TK-3660.
2)Nameplate observed available
3)Nameplate found available.
4)Manhole and handle noted in satisfactory condition
5)Grounding cable found attach to earth boss.
6)Fill connection nozzle found in satisfactory condition.
7)Ladder rung noted in satisfactory condition.
8)Bottom tank and attached nozzle noted in satisfactory condition.
9)View top tank and attached nozzle found in satisfactory condition.
Summary of Inspection
Overall condition of equipment 09TK-3660 in satisfactory condition
Page 1 of 22
6 - PHOTO REPORT
Photo 1 Photo 2
General view of 09TK-3660 Nameplate observed available
Photo 3 Photo 4
Manhole and handle noted in satisfactory condition Grounding cable found attach to earth boss.
Photo 5 Photo 6
Fill connection nozzle found in satisfactory condition. Ladder rung noted in satisfactory condition.
Photo 7 Photo 8
Bottom tank and attached nozzle noted in satisfactory condition. View top tank and attached nozzle found in satisfactory condition.
Photo 9 Photo 10
Photo 11 Photo 12
General Information
PSC: PM-3 South Report Number: BR-2018-202
Platform: BTA Inspection Type: CVI
Inspection Company: Velosi WO Number:
Inspection Results
Recommendations by
Name:
Designation:
Page 4 of 22
1.1 OIE Recommendations
Signature:
Date:
General Information
PSC: Report Number:
Platform: Inspection Type:
Inspection Company: WO Number:
Inspection Results
Recommendations by Reviewed by
Name:
Designation: OIE
Signature:
Date:
Page 5 of 22
2. ANOMALY CLOSE OUT REPORT
Reinspection of the above anomalies after remedial actions had been completed was carried out.
OIE COMMENT
Results are as detailed below:-
Name: 0
Designation: 0
Signature: 0
Date: Sat 30 Dec 1899
RT
BR-2018-202
CVI
API-650
out.
3. Visual Inspection
Type of Inspection carried out: Close Visual Inspection ü General Visual Inspection
Equipment: 09TK-3660 0
Piping Component Degradation noted / Comments
Insulation - if present
(condition, seals, staining,
evidence of CUI)
Mechanical Damage
Vibration
Isometric Drawing
(conformance and
configuration as per sketch?,
deadlegs identified)
PID's (Conformance)
Small Bore
connections/offtakes (fitting
types, supports/clamps,
tagged, vibration)
Others
Inspected by: Mohd Shamsul (Velosi) Signed Mohd Shamsul (Velosi) Date: Sat 30 Jun 2018
Page 8 of 22
4. Ultrasonic Report
Report No.: BR-2018- 202
4. ULTRASONIC THICKNESS REPORT
Sht 1 of
Corrosion Circuit: CC-17A-CT Description: Pour Point Depressant Tank
Drawing No: PM3-OPS-BTA-DR-F-0032, SHEETLine
4 No: 09TK-3660 W/pack Ref:
Eqpt. Make and Model Olympus Epoch 600 Probes Type Freq. Ser No. Range Test Sensitivity
Couplant Grease 0 deg TC10-5 5MHz 78319 50 2nd BWE set to FSH
Calibration Blocks: Stainless Steel Step Wedge 45 deg - - - - - - -
Procedure Number: 60 deg - - - - - - -
Acceptance Standard: ASME VIII 70 deg - - - - - - -
Feature Feature
No. Item Dia Nom W.T MWT 1 MWT 2 MWT 3 MWT 4 No. Item Dia Nom W.T MWT 1 MWT 2 MWT 3 MWT 4
Page 9 of 22
4. Ultrasonic Report
Inspected by: Muhammad Hanif (Velosi) Signed: Muhammad Hanif (Velosi) Date: 30-Jun-2018
Page 10 of 22
SITE INSPECTION REPORT
MPI Report
GENERAL INFORMATION
DB1 (Upper) Acceptable No significant defect was observed during inspection time.
DB1 (Lower) Acceptable No significant defect was observed during inspection time.
DB2 (Upper) Acceptable No significant defect was observed during inspection time.
DB2 (Lower) Acceptable No significant defect was observed during inspection time.
DB3 (Starboard) Acceptable No significant defect was observed during inspection time.
DB3 (Port) Acceptable No significant defect was observed during inspection time.
DB4 (Starboard) Acceptable No significant defect was observed during inspection time.
DB4 (Port) Acceptable No significant defect was observed during inspection time.
INSPECTION RESULTS.
No significant defect was observed during inspection time. All welds was found to be acceptable as per AWS D1.1 specification.
OTHER COMMENTS
- Nil.
ANOMALIES
- Nil.
Inspected by Reviewed by
Name: Mohd Shamsul (Velosi)
Designation: Inspector
Signature: Mohd Solahudin (Velosi)
Date: 30-Jun-18
ATTACHMENT(S)
1. Photo report
2. Sketch
REPORT DISTRIBUTION
To: BRA OIE
Site Inspection Report - 534549625.xls - 11
SITE INSPECTION REPORT
DPI Report
GENERAL INFORMATION
Base:
Media:
Developer:
INSPECTION RESULTS & COMMENTS
DPI Result
INSPECTION RESULTS.
OTHER COMMENTS
None
ANOMALIES
Inspected by Reviewed by
Name: Mohd Shamsul (Velosi)
Designation: Inspector
Signature: Mohd Solahudin (Velosi)
Date: 6/30/2018
Photo 1 Photo 2
Photo 3 Photo 4
Photo 5 Photo 6
Photo 7 Photo 8
Photo 9 Photo 10
Photo 11 Photo 12
7. ATTACHMENTS
09TK-3660 Report Number: BR-2018-202
TP03
TP04
TP05
TP01 TP02
POINT OF UT EXAMINATION
Page 15 of 22
7. Attachments
Page 16 of 22
7. Attachments
18-202
Page 17 of 22
7. Attachments
Page 18 of 22
7. Attachments (1)
7. ATTACHMENTS
Drawing No 09TK-3660 Report Number: BR-2018-202
Page 19 of 22
7. Attachments (1)
Page 20 of 22
7. Attachments (2)
7. ATTACHMENTS
Drawing No 09TK-3660 Report Number: BR-2018-202
Page 21 of 22
7. Attachments (2)
Page 22 of 22