Place MALAYSIA NPK FERTILIZER SDN

BHD
INSPECTION REPORT Inspector Mohd Shamsul Affendi
Date 03.08.2017

Component Description
Item Findings Recommendation Photo Line no./P&ID Dwg.
&
Inspection point no 1 Piping found not insulated and found in satisfactory To do touch up painting/To proper re-instate See inspection 2’’ CP line – From TK 219 to TK 220
1 condition. insulation window. report
Inspection point no 2 Piping connection found not insulated and found in To do touch up painting/To proper re-instate See inspection 2’’ CP line – From TK 219 to TK 220
2 satisfactory condition insulation window report
Inspection point no 3 Straight pipe found accumulated with brownish stain To closely monitored. See inspection 2’’ CP line – From TK 219 to TK 220
3 suspected from environmental condition. To do maintenance painting on pipe support. report
Pipe support found with rusty condition.
Inspection point no 4 Straight pipe found accumulated with brownish stain To closely monitored. See inspection 2’’ CP line – From TK 219 to TK 220
4 suspected from environmental condition. report
Inspection point no 5 Pipe support found with rusty condition To do maintenance painting on pipe support. See inspection 2’’ CP line – From TK 219 to TK 220
5 report
Place MALAYSIA NPK FERTILIZER SDN BHD

INSPECTION REPORT Inspector


Date
Mohd Shamsul Affendi
03.08.2017

VISUAL INSPECTION POINT (INSULATION WAS


OPEN DURING INSPECTION) Drawing Title:2’’ CP Line
Line No: from TK 219 to TK 220
Place MALAYSIA NPK FERTILIZER
SDN BHD
INSPECTION REPORT Inspector Mohd Shamsul Affendi
Date 03.08.2017

A FINDINGS:

A. General view of the line 2’’ CP line – from TK


220. (Refer drawing for Inspection point no.
1).
B. Piping found not insulated and found in
satisfactory condition.

RECOMMENDATIONS:

A. Nil.
B. Nil.
B
Place MALAYSIA NPK FERTILIZER
SDN BHD
INSPECTION REPORT Inspector Mohd Shamsul Affendi
Date 03.08.2017

A FINDINGS:

A. General view of the line 2’’ CP line – from TK


220. (Refer drawing for Inspection point no.
2).
B. Piping connection found not insulated and
found in satisfactory condition.

RECOMMENDATIONS:

A. Nil.
B. Nil.
B
Place MALAYSIA NPK FERTILIZER
SDN BHD
INSPECTION REPORT Inspector Mohd Shamsul Affendi
Date 03.08.2017

A FINDINGS:

A. General view of the line 2’’ CP line – from TK


220. (Refer drawing for Inspection point no.
3). Straight pipe found accumulated with
brownish stain suspected from
environmental condition.
B. Pipe support found with rusty condition.

RECOMMENDATIONS:

A. To closely monitored.
B. To do maintenance painting on pipe support.
B
Place MALAYSIA NPK FERTILIZER
SDN BHD
INSPECTION REPORT Inspector Mohd Shamsul Affendi
Date 03.08.2017

A FINDINGS:

A. General view of the line 2’’ CP line – from TK


220. (Refer drawing for Inspection point no.
4). Straight pipe found accumulated with
brownish stain suspected from
environmental condition.

RECOMMENDATIONS:

A-B. To closely monitored.

B
Place MALAYSIA NPK FERTILIZER
SDN BHD
INSPECTION REPORT Inspector Mohd Shamsul Affendi
Date 03.08.2017

A FINDINGS:

A. Pipe support found with rusty condition.


(Refer drawing for Inspection point no. 5).

RECOMMENDATIONS:

A. To do maintenance painting on pipe support.