You are on page 1of 1

Worklist No:

SCHEME OF EXAMINATION
Date : 30-Dec-99

SCHEME OF EXAMINATION FOR REPSOL PIPING SYSTEM


Corrosion Circuit: CC-05B-WG

Circuit Description: Wet Gas System (CS)

Inspection Code Description

√ Non Insulated pipework - UT


Non Insulated pipework - RT
Insulated pipework - UT
Insulated pipework - RT
Process Description

Applied Materials
API 5L GR. B & ASTM A106
Carbon steel
GR. B

Potential Degradation Problems


Atmospheric Corrosion
CO2 Corrosion
Corrosion Under Deposit
Sand Erosion
CUI for insulated pipework
Assessed corrosion rates
Expected internal corrosion rate -upto max. 0.65mm/yr (RBI assessment)
Erosion - Dependent on flow velocity, sand content and GOR - to be assessed by individual line.
Comments

Inspection Requirements (Select as required)


Inspection for CUI (if applicable), vibration, and any other external degradation. To be
Close Visual Inspection √ carried out in conjunction with other all other inspection surveys. CV inspection as per
procedure No. ………………………………………

Inspection for internal degradation from CO2, erosion and MIC. % inspection to be asigned
Ultrasonic Scanning by Integrity OA after assessment of previous history, degradation mechanisms and
Inspection √ operational information,and to include welds and fittings. Ultrasonic inspection as per
procedure number:………………………......................

Inspection of small bore pipework fittings and welds for CO2 and MIC on pipework <3". %
of inspection to be asigned by Integrity OA after assessment of previous history,
Radiography
degradation mechanisms and operational information. Radiographic inspection as per
procedure No. ………………………

Inspection of non-magnetic materials only, location of inspections to be asigned by


Integrity OA after assessment of previous history, degradation mechanisms (e.g. vibration,
DPT
CSCC) and any other relevant operational information. DPT inspection as per procedure
number: ………………………

MPT Not applicable

Other (e.g PAUT, EC, PEC,


To be assessed as required.
ACFM)

Historical Information (anomalies, repairs, previous loss of WT)

SPECIFIC Inspection Requirements (in conjunction with Inspection Procedure)

ATTACHMENTS

Name:
Date: