You are on page 1of 3

ITP No.

: EPCMD 2 QM 00 ITP CS 007


Rev. No. :
Inspection and Test Plan For
03
Date :
Manhole Construction,
30.09.2013
Sheet No.: 2 of 3
Erection & Testing
System Description: Area: Manhole Number:

System Number: Unit Number: Date:


Reliance Engineer
Sr. Controlling Acceptance Verifying
Activity description Contractor Construction
No. Document (s) Criteria Record QMD O&M/ CES
Disc. Lead

EPCMD
As per applicable As per applicable
Excavation, Base Compaction and Blinding 2QM00FMTCS003
1. drawing / procedure drawing / H H S S S
Concrete. EPCMD
Specification Specification
2QM00FMTCS005
As per applicable As per applicable
Pre-pour inspections. EPCMD
2. drawing / procedure drawing / H H H S S
(Rebar, formwork, embedded items etc.) 2QM00FMTCS014
Specification Specification
As per applicable
Check for proper installation of hydrophilic bars As per applicable
drawing / EPCMD
3. in construction joint as per vendor specified drawing / procedure H H S S S
procedure 2QM00FMTCS054
method. Specification
Specification

Release for Concrete manufacture and supply. Applicable procedure As per applicable EPCMD
4. H H H S S
(Pour Card) / Specification Specification 2QM00FMTCS015

Concrete Receival Inspection and Sampling for Applicable procedure As per applicable EPCMD
5. H W S S S
slump, temperature. (Prior to placement) / Specification Specification 2QM00FMTCS010

As per applicable
Concrete cube sampling & testing at CMTL As per applicable EPCMD Sampling-S
6. procedure / H W S Testing-H
S
(Civil Material Testing Laboratory). Specification 2QM00FMTCS009
Specification

Applicable procedure As per applicable EPCMD


7. Concrete Placement, Finishing and Curing. H S S S S
/ Specification Specification 2QM00FMTCS008

Legend: CES: Central Engineering Service - Inspection


Reliance Construction
Contractor Engineer Reliance QMD Reliance O&M / CES
Disc. Engineer Lead
Date
Name
Signature
ITP No. : EPCMD 2 QM 00 ITP CS 007
Rev. No. :
Inspection and Test Plan For
03
Date :
Manhole Construction,
30.09.2013
Sheet No.: 3 of 3
Erection & Testing
System Description: Area: Manhole Number:

System Number: Unit Number: Date:


Reliance Engineer
Sr. Controlling Acceptance Verifying
Activity description Contractor Construction
No. Document (s) Criteria Record QMD O&M/ CES
Disc. Lead

Applicable procedure As per applicable EPCMD


8. Concrete Surface Inspections and Repairs. H W S S S
/ Specification Specification 2QM00FMTCS043

Applicable procedure As per applicable EPCMD W%


3 9. Leak Testing of Manholes for Impermeability. H H S S
/ Specification Specification 2QM00FMTCS025 (CES)

As per applicable
Precast placement and release for backfill. Applicable procedure EPCMD
10. drawing / H H S S S
(Coordinates to be check by survey) / Specification 2QM00FMTCS053
Specification

As per applicable
Applicable procedure EPCMD
11. Backfill and compaction around Manhole. drawing / H W S S S
/ Specification 2QM00FMTCS004
Specification

Applicable construction procedures EPCMD 3 CONS JEP CS003, 004, 007, 008 & EPCMD 3 CONS JEP CS014, to be followed for execution of relevant
activities.

Note: No modification shall me made once leak test is completed and complied for all precast manholes / chambers.

Legend: CES: Central Engineering Service - Inspection


Reliance Construction
Contractor Engineer Reliance QMD Reliance O&M / CES
Disc. Engineer Lead
Date
Name
Signature

You might also like