Keyplan

Notes

Key to symbols

Reference drawings

Rev Date Drawn Description Dsg'd Check App

Employer Representative:

APPROVED BY

SUB CONTRACTOR:

DRAWN BY ALW
APPROVED BY
CHECKED BY ZAINI

JAKARTA LRT PROJECT - CORRIDOR 1 (PHASE 1)


KELAPA GADING - VELODROME PACKAGE P102

Scale Scale Bar

Drawing Reference Rev Status

Drawing Number Rev Status


Keyplan

Notes

Key to symbols

Reference drawings

Rev Date Drawn Description Dsg'd Check App


Employer:

Employer Representative:

ICE:

DRAWN BY VERIFIED BY
CHECKED BY

APPROVED BY

JAKARTA LRT PROJECT - CORRIDOR 1 (PHASE 1)


KELAPA GADING - VELODROME PACKAGE P102

Scale Scale Bar

Drawing Reference Number Rev Status

Drawing Number Rev Status