PROJECT: JCT.

NHW (COTABATO - MARBEL ROAD) - KOLAMBOG - DUMAGUIL BYPASS Date: June 7, 2021
ROAD - STA. 3+850 TO STA. 7+100, NORALA, SOUTH COTABATO

LOCATION: NORALA, SOUTH COTABATO CONTROL NO.:


CLIENT: CH BEATISULA ENGINEERING CONSULTANCY SL20 - 0871(5-2)
Specifications: -
Type of Test: MODIFIED COMPACTION AND CALIFORNIA BEARING RATIO
Source: Borehole 5; 2m
Submitted By: CH BEATISULA ENGINEERING CONSULTANCY

TEST RESULTS
MODIFIED COMPACTION

Maximum Dry Density (kg/cu.m.) 1844.68


Optimal Moisture Content (%) 10.41

CALIFORNIA BEARING RATIO

CBR @ 0.1 in. (%) 23.02


CBR @ 0.2 in. (%) 32.27

Prepared by: Approved By:

Gerry "Bo" D. Bagtas Jr., C.E. Applegen Cavero-Joyo, MSCE, C.Doc Eng
Laboratory Engineer Operations Manager

NOTE: ANY REPRODUCTION OF THIS TEST AND OTHER PUBLISHED MATERIALS, WHETHER REPRODUCED ON PAPER OR
THIS REPORT IS NOT VALID
ELECTRONICALLY WITHOUT PRIOR WRITTEN CONSENT CONSTITUTES AN INFRINGEMENT OF THE COPYRIGHT IN THE
TEST AND PUBLISHED MATERIALS.
WITHOUT DRY SEAL