You are on page 1of 202

Republic of the Philippines

Department of Public Works and Highways


OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

STATEMENT OF TEST PERFORMED


(Materials Testing Fund)

January 30, 2023

STP Report :
Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
PROJECT : Mindoro
Location : Baco, Oriental Mindoro
Under Contract with : MIDR CONSTRUCTION & SUPPLIES

TEST
DESCRIPTION OF MATERIALS UNIT RATE TOTAL COST
PERFORMED

Compressive/Flexural Test:
Conc. Beam Sample 2 pcs 210.00 420.00
Trial Mix (311) 1 pcs 140.00 140.00
Conc. Cylinder Sample 1 pcs 180.00 180.00

Quality Test
CBR 1 pc 1390.00 1,390.00
Abrasion 1 pc 720.00 720.00
Fine Aggregates 1 pc 2620.00 2,620.00
Coarse Aggregates(Natural) 2 pc 2920.00 5,840.00
RSB 25mm plain 1 pc 1140.00 1,140.00
RSB 16mm def. 1 pc 1320.00 1,320.00
RSB 12mm def. 1 pc 1320.00 1,320.00

TOTAL: Eleven Thousand Three Hundred Twenty Pesos Only 15,090.00


NOTE: Report of Test covered by this statement are on file with this office.

CHECKED BY: APPROVED:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES

QUALITY CONTROL PROGRAM

Contract ID: 23ED0006

Contract Name: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
LIMITS: LOCATION: Baco, Oriental Mindoro

APPROPRIATION/CONTRACT COST P 19,266,428.54 SOURCE : Tigkan River

A. TEST TO BE PERFORMED: DATE : February 12, 2023


Pay Item No. Description UNIT QUANTITY NO. OF TEST (MIN.)
PART A FACILITIES FOR THE ENGINEER
A.1.1(3) Construction of Field Office for the Engineer (Area = 4m x 3m) l.s. 1.00 Inspection Report
Provision of Furniture/Fixtures & Appliances for the living
A.1.1.(22) month 4.53 Inspection Report
Quarters for the Engineer (Rental Basis)
Provision of 4x2 Pick-up Type Service Vehicle for the Engineer on
A.1.2(4) Vehicle-Month 4.53 Inspection Report
Bare Rental Basis
Operation and Maintenance of 4x2 Pick-up Type Service Vehicle
A.1.2(6) Vehicle-Month 4.53 Inspection Report
for the Engineer
PART B OTHER GENERAL REQUIREMENTS

B.5 Project Billboard/Signboard each 2.00 Inspection Report

B.7 (1) Occupational Safety & Health Program Months 4.53 Inspection Report

B.8 (2) Traffic Management l.s. 1.00 Inspection Report

B.9 Mobilization/Demobilization l.s. 1.00 Inspection Report

B.12 Removal and Relocation of Utilities l.s. 1.00 Inspection Report

PART C EARTHWORKS
Individual Removal of Trees (small b,above 150mm dia.Up to
100 (3) a1 each 90.00 Engineer's Certification
300mm dia)
Individual Removal of Trees(small b, above 301mm dia Up to
100 (3) a2 each 18.00 Engineer's Certification
500 mm dia.)
100(3)a3 Individual Removal of Trees (Small, 501-750mm dia) each 6.00 Engineer's Certification

101(3)b1 Removal of Existing Concrete Pavement (0.15m thk PCCP) sq.m. 80.10 Engineer's Certification

102(2) Surplus Common Roadway Excavation cu.m. 3813.54 Engineer's Certification

103(3) Foundation Fill cu.m. 7.44 GPC-1, D-1

103(6) a Pipe Culvert and Drain Excavation, Common Soil cu.m. 112.46 Engineer's Certification

104(1) a Embankment from roadway excavation, Common Soil cu.m. 596.76 GPC - 1 , D - 18

105 (1) a Subgrade Preparation,Common Material sq.m. 949.60 GPC -1, D-5
PART D SUBBASE AND BASE COURSE
200(1) Aggregate Subbase Course cu.m. 2079.40 GP-7,C-2,ABR-2,CBR-1,D-63
PART E SURFACE COURSES

311 (1) b1 Portland Cement Concrete Pavement (Unreinforced) 0.20 m thick sq.m. 6257.00

a. Concrete cu.m. 1251.40 ##-1/PD Approx-17 sets

b. Reinforcing Steel Bar kgs 2440.23 1-QT/10000 kgs/size

c. Curing Compound L 1814.53 1-QT/per shipment

d. Asphalt Sealant L 750.84 1-QT/40 M.T.

e. Steel Forms (Rental ) - 23cm width m 2878.22 Inspection Report


f. Sand cu.m. 688.27 G-10, 1-Q**
g. Crushed Gravel cu.m. 1251.40 Q-1,G-17
h. Cement bags 11888.30 Q-6
i. Concrete Saw (Diamond Blade 14" diam.) pc 0.94 Inspection Report
j. Pipe Sleeve, 2" diam. G.I. Pipe S40 m 53.81 Inspection Report
k. Grease/Tar L 35.04 Inspection Report
l. Water ltr 1.00 Engineer's Certification
m.Design Mix with Trial Mix ltr 1.00 ##-1
n. Completed Pavement sq.m. 6257.00 T-5/Km/lane

311 (1) f1 Portland Cement Concrete Pavement (Unreinforced) 0.15 m thick sq.m. 637.04
a. Concrete cu.m. 95.56 ##-1/PD Approx-2 sets
b. Reinforcing Steel Bar kg 210.22 Q-1/10,000 kgs/size
c. Curing Compound L 184.74 1-QT/per shipment
d. Asphalt Sealant L 76.44 1-QT/40 M.T.
d. Steel Forms (Rental ) - 20cm width m 293.04 Inspection Report
f. Sand cu.m. 52.56 G-1;1-QT**
g. Crushed Gravel cu.m. 95.56 G-2;1-QT***
h. Cement bags 910.97 1-QT
i. Concrete Saw (Diamond Blade 14" diam.) pc 0.10 Inspection Report
j. Pipe Sleeve, 2" diam. G.I. Pipe S40 m 4.97 Inspection Report
k. Grease/Tar L 0.96 Inspection Report
l. Water ltr 1.00 Engineer's Certification
m.Design Mix with Trial Mix ltr 1.00 ##-1
n. Completed Pavement sq.m. 637.04 T-5/Km/lane
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES
404 (1) a Reinforcing Steel, Grade 40 kgs 4199.35 1-QT/10000kgs/size
405 (2) c Structural Concrete Class B (18 Mpa) - Wheel Guard cu.m. 56.77
a. Lumber, Good - 4 uses bd-ft 451.32 Inspection Report
b. Marine Plywood (1/2" x 4' x 8') 4 uses pc 55.63 Inspection Report
c. Assorted CWN (1kg/100 bd-ft of Lumber) kg 4.54 Inspection Report
d. Cement bag 454.16 1-QT*
e. Sand cu.m. 28.39 G-1;1-QT**
f. Gravel cu.m. 56.77 G-1;1-QT
500 (1) b3 Pipe Culverts, RCPC, 910 mm dia, Class IV L.m. 54.00 1-Q
506 (1) Stone Masonry cu.m. 1045.56
a. Cement bags 5750.58 3-QT
b. Sand cu.m. 1725.17 G-24;2-QT
c. Gravel Fill cu.m. 20.91 G-1
d. Wheep Holes (3" PVC) m 265.57 Inspection Report
e. Filter Cloth sq.m. 13.59 Inspection Report
f. Boulders cu.m. 1097.84 Inspection Report/Sp.Gr.
PART H MISCELLANEOUS STRUCTURES
611 (1) Trees Furnishing and Transplanting each 3500.00 Inspection Report

x-x-x-x
NOTE
* Test included in Item 311 (1) f1 - h
** Test included in Item 311(1)b1-g
*** Test included in Item 506(1) - b

PREPARED BY:

MARK IAN M. DELOS REYES


Materials Engineer
MIDR CONSTRUCTION & SUPPLIES
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro
REVIEWED BY: APPROVED:

GRACE M. MANONGSONG ERWIN DG. UMALI


Materials Engineer I OIC-District Engineer
DPWH DPWH
February 12,2023
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

STATUS O F TEST
As of APRIL 2023
Physical Accomplishment: 50.86%
CONTRACT ID: 23ED0006
CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
LOCATION: Baco, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION & SUPPLIES

Contract No. of Test % of Work


Pay
Description/Materials Unit Min. # Total Required
Item No. Quantity On File Balance
Accomplished

``
PART A FACILITIES FOR THE ENGINEER

Construction of Field Office for the Engineer l.s. Inspection Report IR IR


A.1.1(3) (Area = 4m x 3m) 1.00 50.00%
Provision of Furniture/Fixtures & Appliances
for the living Quarters for the Engineer month Inspection Report IR IR
A.1.1.(22) (Rental Basis) 4.53 50.11%
Provision of 4x2 Pick-up Type Service V-
Vehicle for the Engineer on Bare Rental Inspection Report IR IR
Month
A.1.2(4) Basis 4.53 50.11%

V- IR
Operation and Maintenance of 4x2 Pick-up Inspection Report IR
Month
A.1.2(6) Type Service Vehicle for the Engineer 4.53 50.11%

PART B OTHER GENERAL REQUIREMENTS

each Inspection Report IR


B.5 Project Billboard/Signboard 2.00 100.00%

Months Inspection Report IR IR


B.7 (1) Occupational Safety & Health Program 4.53 50.11%

l.s. Inspection Report IR IR


B.8 (2) Traffic Management 1.00 42.00%

l.s. Inspection Report IR IR


B.9 Mobilization/Demobilization 1.00 50.00%

l.s. Inspection Report IR


B.12 Removal and Relocation of Utilities 1.00

PART C EARTHWORKS

Individual Removal of Trees (small b,above each Engineer's Certification EC


100 (3) a1150mm dia.Up to 300mm dia) 90.00

Individual Removal of Trees(small b, above each Engineer's Certification EC


100 (3) a2301mm dia Up to 500 mm dia.) 18.00

Individual Removal of Trees (Small, 501- each Engineer's Certification EC


100(3)a3 750mm dia) 6.00

Removal of Existing Concrete Pavement sq.m. Engineer's Certification EC


101(3)b1 (0.15m thk PCCP) 80.10

cu.m. Engineer's Certification EC EC 42.89%


102(2) Surplus Common Roadway Excavation 3,813.54

cu.m. GPC-1, D-1 GPC-1, D-1


103(3) Foundation Fill 7.44 100.00%

Pipe Culvert and Drain Excavation, Common cu.m. Engineer's Certification EC


103(6) a Soil 112.46

Embankment from roadway excavation, cu.m. GPC - 1 , D - 18 GPC - 1 , D - 18


104(1) a Common Soil 596.76

sq.m. GPC -1, D-5 GPC - 1 , D-2 D-3


105 (1) a Subgrade Preparation,Common Material 949.60 53.11%
PART D SUBBASE AND BASE COURSE
200(1) Aggregate Subbase Course 2,079.40 cu.m. GP-7,C-2,ABR-2,CBR-1,D-63 GP-2, C-1, ABR-1,CBR-1, D-16 GP-5, C-1, ABR-1, D-47 53.19%
PART E SURFACE COURSES
Portland Cement Concrete Pavement sq.m.
311 (1) b1(Unreinforced) 0.20 m thick 6,257.00 57.17%

a. Concrete 1,251.40 cu.m. ##-1/PD Approx-17 sets ##-1/PD Approx-5 sets ##-1/PD Approx-12 sets 57.17%

b. Reinforcing Steel Bar 2,440.23 kgs 1-QT/10000 kgs/size 1-QT/10000 kgs/size 100.00%

c. Curing Compound 1,814.53 L 1-QT/per shipment 1-QT/per shipment 100.00%

d. Asphalt Sealant 750.84 L 1-QT/40 M.T. 1-QT/40 M.T. 100.00%

e. Steel Forms (Rental ) - 23cm width 2,878.22 m Inspection Report IR IR 57.17%

f. Sand 688.27 cu.m. G-10, 1-Q** **Q-1, G-2 G-8 57.17%

g. Crushed Gravel 1,251.40 cu.m. Q-1,G-17 Q-1,G-4 G-13 57.17%

h. Cement 11,888.30 bags Q-6 Q-6 100.00%


pc Inspection Report IR IR
i. Concrete Saw (Diamond Blade 14" diam.) 0.94 57.17%

j. Pipe Sleeve, 2" diam. G.I. Pipe S40 53.81 m Inspection Report IR IR 57.17%

k. Grease/Tar 35.04 L Inspection Report IR IR 57.17%

l. Water 1.00 ltr Engineer's Certification EC 100.00%

m. Design Mix with trial mix 1.00 ltr ##-1 ##-1 100.00%

n. Completed pavement 6,257.00 sq.m. T-5/Km/lane T-5/Km/lane 0.00%

Portland Cement Concrete Pavement sq.m.


311 (1) f1 (Unreinforced) 0.15 m thick 637.04
a. Concrete 95.56 cu.m. ##-1/PD Approx-2 sets ##-1/PD Approx-2 sets

b. Reinforcing Steel Bar 210.22 kgs Q-1/10,000 kgs/size Q-1/10,000 kgs/size

c. Curing Compound 184.74 L 1-QT/per shipment 1-QT/per shipment

d. Asphalt Sealant 76.44 L 1-QT/40 M.T. 1-QT/40 M.T.

d. Steel Forms (Rental ) - 20cm width 293.04 m Inspection Report Inspection Report

f. Sand 52.56 cu.m. G-1;1-QT** G-1;1-QT**

g. Crushed Gravel 95.56 cu.m. G-2;1-QT*** G-2;1-QT***

h. Cement 910.97 bags 1-QT 1-QT

pc Inspection Report Inspection Report


i. Concrete Saw (Diamond Blade 14" diam.) 0.10
j. Pipe Sleeve, 2" diam. G.I. Pipe S40 4.97 m Inspection Report Inspection Report

k. Grease/Tar 0.96 L Inspection Report Inspection Report

l. Water 1.00 ltr Engineer's Certification Engineer's Certification

m. Design Mix with trial mix 1.00 ltr ##-1 ##-1

n. Completed pavement 637.04 sq.m. T-5/Km/lane T-5/Km/lane


DRAINAGE AND SLOPE PROTECTION
PART G STRUCTURES
404 (1) a Reinforcing Steel, Grade 40 4,199.35 kgs 1-QT/10000kgs/size 1-QT 100.00%
Structural Concrete Class B (18 Mpa) - Wheel cu.m.
405 (2) c Guard 56.77 19.69%
a. Lumber, Good - 4 uses 451.32 bd-ft Inspection Report IR IR 19.69%

b. Marine Plywood (1/2" x 4' x 8') 4 uses 55.63 pc Inspection Report IR IR 19.69%
c. Assorted CWN (1kg/100 bd-ft of Lumber) 4.54 kg Inspection Report IR IR 19.69%

d. Cement 454.16 bag 1-QT* 1-QT* 100.00%

e. Sand 28.39 cu.m. G-1;1-QT** 1-QT**, 1-G 100.00%

f. Gravel 56.77 cu.m. G-1;1-QT G-1, 1-QT 100.00%


L.m. 1-Q 1-Q
500 (1) b3Pipe Culverts, RCPC, 910 mm dia, Class IV 54.00
506 (1) Stone Masonry 1,045.56 cu.m. 60.25%
a. Cement 5,750.58 bags 3-QT 3-QT 100.00%
b. Sand 1,725.17 cu.m. G-24;2-QT QT-1,G-2 QT-1,G-22 60.25%

c. Gravel Fill 20.91 cu.m. G-1 G-1 100.00%

d. Wheep Holes (3" PVC) 265.57 m Inspection Report Inspection Report IR 60.25%

e. Filter Cloth 13.59 sq.m. Inspection Report Inspection Report IR 60.25%

f. Boulders 1,097.84 cu.m. Inspection Report/Sp.Gr. Inspection Report/Sp.Gr. IR 60.25%


PART H MISCELLANEOUS STRUCTURES
611 (1) Trees Furnishing and Transplanting 3,500.00 each Inspection Report IR
Prepared by Submitted By:

GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer Chief, Quality Assurance Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

WEEKLY CERTIFICATE OF QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0006


Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
CONTRACT NAME:
Mindoro
LOCATION: Baco, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION & SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned project for the
period of APRIL 2023.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to the
quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

PAY ITEM CONTRACT


PAY ITEM DESCRIPTION QUANTITY
UNIT APRIL 1-7 APRIL 8-14 APRIL 15-21 APRIL 22- 28
NO. TOTAL

Construction of Field Office for the


A.1.1(3) 1.00 l.s.
Engineer (Area = 4m x 3m)
0.053 0.053 0.053 0.053 0.21
Provision of Furniture/Fixtures &
A.1.1.(22) Appliances for the living Quarters for the 4.53 month
Engineer (Rental Basis) 0.827 0.83
Provision of 4x2 Pick-up Type Service
A.1.2(4) Vehicle for the Engineer on Bare Rental 4.53 Vehicle-
Basis Month 0.827 0.83
Operation and Maintenance of 4x2 Pick-up
A.1.2(6) 4.53 Vehicle-
Type Service Vehicle for the Engineer
Month 0.827 0.83

B.7 (1) Occupational Safety & Health Program 4.53 Months


0.21 0.207 0.207 0.207 0.83
B.8 (2) Traffic Management 1.00 l.s.
0.045 0.045 0.045 0.045 0.18
B.9 Mobilization/Demobilization 1.00 l.s. 0.00
B.12 Removal and Relocation of Utilities 1.00 l.s. 0.00
102(2) Surplus Common Roadway Excavation 3813.54 cu.m. 0.00
103(3) Foundation Fill 7.44 cu.m. 0.00
Pipe Culvert and Drain Excavation,
103(6) a 2.00 l.s.
Common Soil 0.00
Embankment from roadway excavation,
104(1) a 3.00 l.s.
Common Soil 0.00
102(2) Surplus Common Roadway Excavation 3813.54 cu.m. 0.00
105 (1) a Subgrade Preparation,Common Material 949.60 sq.m.
0.00
200(1) Aggregate Subbase Course 2079.40 cu.m. 600.00 600.00
Portland Cement Concrete Pavement
311 (1) b1 6257.00 sq.m.
(Unreinforced) 0.20 m thick 938.50 938.50 1877.00
404 (1) a Reinforcing Steel, Grade 40 4199.35 kgs 0.00

500 (1) b3 Pipe Culverts, RCPC, 910 mm dia, Class IV 4200.35 kgs
16.00 16.00
506 (1) Stone Masonry 1045.56 cu.m. 0.00
611 (1) Trees Furnishing and Transplanting 1046.56 cu.m. 0.00
GRACE M. MANONGSONG MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

MONTHLY CERTIFICATE QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0006


CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
LOCATION: Baco, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION & SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned project for the period of FEBRUARY 2023.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to the quantity accomplished conforms with the plans,
standard specifications and provisions of the Contract, viz:

QUANTITY
CONTRACT
PAY ITEM NO. PAY ITEM DESCRIPTION UNIT
QUANTITY
PREVIOUS THIS PERIOD TOTAL BALANCE

PART A FACILITIES FOR THE ENGINEER


A.1.1(3) Construction of Field Office for the Engineer (Area = 4m x 3m) 1.00 l.s. 0.060 0.060 0.94
Provision of Furniture/Fixtures & Appliances for the living Quarters for the Engineer
A.1.1.(22)
(Rental Basis) 4.53 month 0.270 0.270 4.26
A.1.2(4) Provision of 4x2 Pick-up Type Service Vehicle for the Engineer on Bare Rental Basis 4.53 Vehicle-Month 0.270 0.270 4.26
A.1.2(6) Operation and Maintenance of 4x2 Pick-up Type Service Vehicle for the Engineer 4.53 0.270 0.270 4.26
Vehicle-Month
PART B OTHER GENERAL REQUIREMENTS

B.5 Project Billboard/Signboard 2.00 each 2.000 2.000 -


B.7 (1) Occupational Safety & Health Program 4.53 Months 0.270 0.270 4.26
B.8 (2) Traffic Management 1.00 l.s. 0.060 0.060 0.94
B.9 Mobilization/Demobilization 1.00 l.s. 0.250 0.250 0.75
B.12 Removal and Relocation of Utilities 1.00 l.s. - - 1.00
PART C EARTHWORKS

100 (3) a1 Individual Removal of Trees (small b,above 150mm dia.Up to 300mm dia) 90.00 each - - 90.00
100 (3) a2 Individual Removal of Trees(small b, above 301mm dia Up to 500 mm dia.) 18.00 each - - 18.00
100(3)a3 Individual Removal of Trees (Small, 501-750mm dia) 6.00 each - - 6.00
101(3)b1 Removal of Existing Concrete Pavement (0.15m thk PCCP) 80.10 sq.m. - - 80.10
102(2) Surplus Common Roadway Excavation 3,813.54 cu.m. 635.570 635.570 3,177.97
103(3) Foundation Fill 7.44 cu.m. - - 7.44
103(6) a Pipe Culvert and Drain Excavation, Common Soil 112.46 cu.m. - - 112.46
104(1) a Embankment from roadway excavation, Common Soil 596.76 cu.m. - - 596.76
105 (1) a Subgrade Preparation,Common Material 949.60 sq.m. 182.300 182.300 767.30
PART D SUBBASE AND BASE COURSE - - - - -
200(1) Aggregate Subbase Course 2,079.40 cu.m. 206.010 206.010 1,873.39
PART E SURFACE COURSES - - - - -
311 (1) b1 Portland Cement Concrete Pavement (Unreinforced) 0.20 m thick 6,257.00 sq.m. 1,200.000 1,200.000 5,057.00
311 (1) f1 Portland Cement Concrete Pavement (Unreinforced) 0.15 m thick 637.04 sq.m. - - 637.04
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES - - - - -
404 (1) a Reinforcing Steel, Grade 40 4,199.35 kgs 577.200 577.200 3,622.15
405 (2) c Structural Concrete Class B (18 Mpa) - Wheel Guard 56.77 cu.m. - - 56.77
500 (1) b3 Pipe Culverts, RCPC, 910 mm dia, Class IV 54.00 L.m. - - 54.00
506 (1) Stone Masonry 1,045.56 cu.m. 209.990 209.990 835.57
PART H MISCELLANEOUS STRUCTURES - - - - -
611 (1) Trees Furnishing and Transplanting 3,500.00 each - - 3,500.00

Note : The aforementioned quantities may serve as reference for payment/billing purposes but may not be equal to the Statement of Work Accomplished for billing depending on the
intended/requested quantity to be billed by the Contractor evaluated as reasonable for payment

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

MONTHLY CERTIFICATE QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0006

CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

LOCATION: Baco, Oriental Mindoro


CONTRACTOR : MIDR CONSTRUCTION & SUPPLIES
We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned project for the period of MARCH 2023.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to the quantity accomplished conforms with the plans,
standard specifications and provisions of the Contract, viz:

PAY ITEM NO. PAY ITEM DESCRIPTION CONTRACT QUANTITY


QUANTITY UNIT PREVIOUS THIS PERIOD TOTAL BALANCE

PART A FACILITIES FOR THE ENGINEER

A.1.1(3) Construction of Field Office for the Engineer (Area = 4m x 3m) 1.00 l.s. 0.060 0.228 0.288 0.712
Provision of Furniture/Fixtures & Appliances for the living Quarters for the Engineer
A.1.1.(22)
(Rental Basis) 4.53 month 0.270 1.173 1.443 3.087

A.1.2(4) Provision of 4x2 Pick-up Type Service Vehicle for the Engineer on Bare Rental Basis
4.53 Vehicle-Month 0.270 1.173 1.443 3.087

A.1.2(6) Operation and Maintenance of 4x2 Pick-up Type Service Vehicle for the Engineer
4.53 Vehicle-Month 0.270 1.173 1.443 3.087
PART B OTHER GENERAL REQUIREMENTS -
B.5 Project Billboard/Signboard 2.00 each 2.000 - 2.000 -
B.7 (1) Occupational Safety & Health Program 4.53 Months 0.270 1.173 1.443 3.087
B.8 (2) Traffic Management 1.00 l.s. 0.060 0.180 0.240 0.760
B.9 Mobilization/Demobilization 1.00 l.s. 0.250 0.250 0.500 0.500
B.12 Removal and Relocation of Utilities 1.00 l.s. - - - 1.000
PART C EARTHWORKS - - - - - -
100 (3) a1 Individual Removal of Trees (small b,above 150mm dia.Up to 300mm dia) 90.00 each - 7.000 7.000 83.000
100 (3) a2 Individual Removal of Trees(small b, above 301mm dia Up to 500 mm dia.) 18.00 each - 2.000 2.000 16.000
100(3)a3 Individual Removal of Trees (Small, 501-750mm dia) 6.00 each - 1.000 1.000 5.000
101(3)b1 Removal of Existing Concrete Pavement (0.15m thk PCCP) 80.10 sq.m. - 80.100 80.100 -
102(2) Surplus Common Roadway Excavation 3,813.54 cu.m. 635.570 1,000.000 1,635.570 2,177.970
103(3) Foundation Fill 7.44 cu.m. - 2.000 2.000 5.440
103(6) a Pipe Culvert and Drain Excavation, Common Soil 112.46 cu.m. - 25.000 25.000 87.460
104(1) a Embankment from roadway excavation, Common Soil 596.76 cu.m. - 293.090 293.090 303.670
105 (1) a Subgrade Preparation,Common Material 949.60 sq.m. 182.300 322.010 504.310 445.290
PART D SUBBASE AND BASE COURSE - - - - - -
200(1) Aggregate Subbase Course 2,079.40 cu.m. 206.010 300.000 506.010 1,573.390
PART E SURFACE COURSES - - - - - -
311 (1) b1 Portland Cement Concrete Pavement (Unreinforced) 0.20 m thick 6,257.00 sq.m. 1,200.000 500.000 1,700.000 4,557.000
311 (1) f1 Portland Cement Concrete Pavement (Unreinforced) 0.15 m thick 637.04 sq.m. - - - 637.040
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES - - - - - -
404 (1) a Reinforcing Steel, Grade 40 4,199.35 kgs 577.200 713.420 1,290.620 2,908.730
405 (2) c Structural Concrete Class B (18 Mpa) - Wheel Guard 56.77 cu.m. - 11.180 11.180 45.590
500 (1) b3 Pipe Culverts, RCPC, 910 mm dia, Class IV 54.00 L.m. - - - 54.000
506 (1) Stone Masonry 1,045.56 cu.m. 209.990 420.000 629.990 415.570
PART H MISCELLANEOUS STRUCTURES - - - - - -
611 (1) Trees Furnishing and Transplanting 3,500.00 each - - - 3,500.000

Note : The aforementioned quantities may serve as reference for payment/billing purposes but may not be equal to the Statement of Work Accomplished for billing depending on the
intended/requested quantity to be billed by the Contractor evaluated as reasonable for payment

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

MONTHLY CERTIFICATE QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0006


CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
LOCATION: Baco, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION & SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned project for the period of APRIL 2023.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to the quantity accomplished conforms with the plans,
standard specifications and provisions of the Contract, viz:

PAY ITEM NO. PAY ITEM DESCRIPTION CONTRACT QUANTITY


QUANTITY UNIT PREVIOUS THIS PERIOD TOTAL BALANCE

PART A FACILITIES FOR THE ENGINEER


A.1.1(3) Construction of Field Office for the Engineer (Area = 4m x 3m) 1.00 l.s. 0.288 0.212 0.50 0.50
Provision of Furniture/Fixtures & Appliances for the living Quarters for the Engineer
A.1.1.(22) 4.53 month 1.443 0.827 2.27 2.26
(Rental Basis)
A.1.2(4) Provision of 4x2 Pick-up Type Service Vehicle for the Engineer on Bare Rental Basis
4.53 Vehicle-Month 1.443 0.827 2.27 2.26
A.1.2(6) Operation and Maintenance of 4x2 Pick-up Type Service Vehicle for the Engineer
4.53 Vehicle-Month 1.443 0.827 2.27 2.26
PART B OTHER GENERAL REQUIREMENTS - - -
B.5 Project Billboard/Signboard 2.00 each 2.000 2.00 -
B.7 (1) Occupational Safety & Health Program 4.53 Months 1.443 0.827 2.27 2.26
B.8 (2) Traffic Management 1.00 l.s. 0.240 0.180 0.42 0.58
B.9 Mobilization/Demobilization 1.00 l.s. 0.500 0.50 0.50
B.12 Removal and Relocation of Utilities 1.00 l.s. - - - 1.00
PART C EARTHWORKS - - - - -
100 (3) a1 Individual Removal of Trees (small b,above 150mm dia.Up to 300mm dia) 90.00 each 7.000 7.00 83.00
100 (3) a2 Individual Removal of Trees(small b, above 301mm dia Up to 500 mm dia.) 18.00 each 2.000 2.00 16.00
100(3)a3 Individual Removal of Trees (Small, 501-750mm dia) 6.00 each 1.000 1.00 5.00
101(3)b1 Removal of Existing Concrete Pavement (0.15m thk PCCP) 80.10 sq.m. 80.100 80.10 -
102(2) Surplus Common Roadway Excavation 3,813.54 cu.m. 1,635.570 1,635.57 2,177.97
103(3) Foundation Fill 7.44 cu.m. 2.000 2.00 5.44
103(6) a Pipe Culvert and Drain Excavation, Common Soil 112.46 cu.m. 25.000 25.00 87.46
104(1) a Embankment from roadway excavation, Common Soil 596.76 cu.m. 293.090 293.09 303.67
105 (1) a Subgrade Preparation,Common Material 949.60 sq.m. 504.310 504.31 445.29
PART D SUBBASE AND BASE COURSE - - - - -
200(1) Aggregate Subbase Course 2,079.40 cu.m. 506.010 600.000 1,106.01 973.39
PART E SURFACE COURSES - - - - -
311 (1) b1 Portland Cement Concrete Pavement (Unreinforced) 0.20 m thick 6,257.00 sq.m. 1,700.000 1,877.000 3,577.00 2,680.00
311 (1) f1 Portland Cement Concrete Pavement (Unreinforced) 0.15 m thick 637.04 sq.m. - - 637.04
PART G DRAINAGE AND SLOPE PROTECTION STRUCTURES - - - - -
404 (1) a Reinforcing Steel, Grade 40 4,199.35 kgs 1,290.620 1,290.62 2,908.73
405 (2) c Structural Concrete Class B (18 Mpa) - Wheel Guard 56.77 cu.m. 11.180 11.18 45.59
500 (1) b3 Pipe Culverts, RCPC, 910 mm dia, Class IV 54.00 L.m. - 16.000 16.00 38.00
506 (1) Stone Masonry 1,045.56 cu.m. 629.990 629.99 415.57
PART H MISCELLANEOUS STRUCTURES - - - - -
611 (1) Trees Furnishing and Transplanting 3,500.00 each - - 3,500.00

Note : The aforementioned quantities may serve as reference for payment/billing purposes but may not be equal to the Statement of Work Accomplished for billing depending on the
intended/requested quantity to be billed by the Contractor evaluated as reasonable for payment

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

WEEKLY CERTIFICATE OF QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0006


Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
CONTRACT NAME:
Mindoro
LOCATION: Baco, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION & SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned project for the
period of FEBRUARY 2023.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to the
quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

PAY ITEM CONTRACT


PAY ITEM DESCRIPTION QUANTITY UNIT February 12-15 February 16-22 February 23-28
NO. TOTAL

Construction of Field Office for the


A.1.1(3) 1.00 l.s. 0.06 0.060
Engineer (Area = 4m x 3m)

Provision of Furniture/Fixtures &


A.1.1.(22) Appliances for the living Quarters for the 4.53 month 0.090 0.090 0.090 0.270
Engineer (Rental Basis)
Provision of 4x2 Pick-up Type Service
V-
A.1.2(4) Vehicle for the Engineer on Bare Rental 4.53 0.090 0.090 0.090 0.270
Month
Basis

Operation and Maintenance of 4x2 Pick-


A.1.2(6) 4.53 Vehicle- 0.090 0.090 0.090 0.270
up Type Service Vehicle for the Engineer
Month

B.5 Project Billboard/Signboard 2.00 each 2.000 2.000

B.7 (1) Occupational Safety & Health Program 4.53 Months 0.090 0.090 0.090 0.270

B.8 (2) Traffic Management 1.00 l.s. 0.030 0.030 0.060

B.9 Mobilization/Demobilization 1.00 l.s. 0.250 0.250

102(2) Surplus Common Roadway Excavation 3813.54 cu.m. 317.785 317.785 635.570

105 (1) a Subgrade Preparation,Common Material 949.60 sq.m. 91.150 91.150 182.300

200(1) Aggregate Subbase Course 2079.40 cu.m. 206.010 206.010

Portland Cement Concrete Pavement


311 (1) b1 6257.00 sq.m. 200.000 1,000.000 1200.000
(Unreinforced) 0.20 m thick

404 (1) a Reinforcing Steel, Grade 40 4199.35 kgs 577.200 577.200

506 (1) Stone Masonry 1045.56 cu.m. 109.990 100.000 209.990

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
Masipit, Calapan City, Oriental Mindoro

WEEKLY CERTIFICATE OF QUALITY CONTROL ASSURANCE

CONTRACT ID: 23ED0006


Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
CONTRACT NAME:
Mindoro
LOCATION: Baco, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION & SUPPLIES

We hereby certify that we have conducted an inspection and verification on the work accomplishment on the above mentioned project for the
period of MARCH 2023.

We further certify that we have found that the quality of materials and workmanship on the following items of work corresponding to the
quantity accomplished conforms with the plans, standard specifications and provisions of the Contract, viz:

PAY ITEM CONTRACT


PAY ITEM DESCRIPTION QUANTITY UNIT
NO. MARCH 1-6 MARCH 7-14 MARCH 15-21 MARCH 22- 31 TOTAL

Construction of Field Office for the


A.1.1(3) 1.00 l.s.
Engineer (Area = 4m x 3m) 0.06 0.076 0.076 0.076 0.23
Provision of Furniture/Fixtures &
A.1.1.(22) Appliances for the living Quarters for the 4.53 month
Engineer (Rental Basis) 0.27 0.346 0.346 0.211 1.173
Provision of 4x2 Pick-up Type Service
A.1.2(4) Vehicle for the Engineer on Bare Rental 4.53 Vehicle-
Basis Month 0.27 0.346 0.346 0.211 1.173
Operation and Maintenance of 4x2 Pick-
A.1.2(6) 4.53 Vehicle-
up Type Service Vehicle for the Engineer
Month 0.27 0.346 0.346 0.211 1.173
B.7 (1) Occupational Safety & Health Program 4.53 Months 0.27 0.346 0.346 0.211 1.173
B.8 (2) Traffic Management 1.00 l.s. 0.06 0.050 0.050 0.02 0.18
B.9 Mobilization/Demobilization 1.00 l.s. 0.25 0.25
B.12 Removal and Relocation of Utilities 1.00 l.s. 0.00
Individual Removal of Trees (small
100 (3) a1 90.00 ea.
b,above 150mm dia.Up to 300mm dia) 7.00 7.00
Individual Removal of Trees(small b,
100 (3) a2 18.00 ea.
above 301mm dia Up to 500 mm dia.) 2.00 2.00
Individual Removal of Trees (Small, 501-
100(3)a3 6.00 ea.
750mm dia) 1.00 1.00
Removal of Existing Concrete Pavement
101(3)b1 80.10 sq.m.
(0.15m thk PCCP) 80.10 80.10
102(2) Surplus Common Roadway Excavation 3813.54 sq.m. 0.00
103(3) Foundation Fill 7.44 cu.m. 2.000 2.00
Pipe Culvert and Drain Excavation,
103(6) a 112.46 cu.m.
Common Soil 25.000 25.00
Embankment from roadway excavation,
104(1) a 3.00 l.s.
Common Soil 146.545 146.545 293.09
102(2) Surplus Common Roadway Excavation 3813.54 cu.m. 1,000.00 1000.00
105 (1) a Subgrade Preparation,Common Material 949.60 sq.m. 182.30 139.71 322.01
200(1) Aggregate Subbase Course 2079.40 cu.m. 300.00 300.00
Portland Cement Concrete Pavement
311 (1) b1 6257.00 sq.m.
(Unreinforced) 0.20 m thick 500.00 500.00
404 (1) a Reinforcing Steel, Grade 40 4199.35 kgs 713.42 713.42
Pipe Culverts, RCPC, 910 mm dia, Class
500 (1) b3 54.00 L.M.
IV 0.00
506 (1) Stone Masonry 1045.56 cu.m. 200.00 220.00 420.00
GRACE M. MANONGSONG MARK LESTER B. CABRAL
Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: April 8, 2023

Pouring Permit Report


Name of Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Location : Baco, Oriental Mindoro
Contractor : MIDR CONSTRUCTION & SUPPLIES
Part of Structure Estimated Volume : 75.00 cu.m.
to be Poured : Conc. Pavement L/S Date of Pouring :
Station Limits/Section: 0+325.00 to 0+400.00 April 08, 2023

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Beam/Cylinder Molds
X Warning Signs/Barricades/Flagmen X Curing Materials
X Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
X Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
X broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

GRACE M. MANONGSONG MERCEDES G. ASPI April 8, 2023


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

RAMIR G. BASA April 8, 2023


Project Inspector : Date
REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

MARK LESTER B. CABRAL


Project Engineer
Acc No. : 4646
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: April 10, 2023

Pouring Permit Report


Name of Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Location : Baco, Oriental Mindoro
Contractor : MIDR CONSTRUCTION & SUPPLIES
Part of Structure Estimated Volume : 75.00 cu.m.
to be Poured : Conc. Pavement L/S Date of Pouring :
Station Limits/Section: 0+400.00 to 0+475.00 April 10, 2023

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Beam/Cylinder Molds
X Warning Signs/Barricades/Flagmen X Curing Materials
X Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
X Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
X broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

GRACE M. MANONGSONG MERCEDES G. ASPI April 10, 2023


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

RAMIR G. BASA April 10, 2023


Project Inspector : Date
REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

MARK LESTER B. CABRAL


Project Engineer
Acc No. : 4646
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: April 11, 2023

Pouring Permit Report


Name of Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Location : Baco, Oriental Mindoro
Contractor : MIDR CONSTRUCTION & SUPPLIES
Part of Structure Estimated Volume : 75.00 cu.m.
to be Poured : Conc. Pavement R/S Date of Pouring :
Station Limits/Section: 0+475.00 to 0+550.00 April 11, 2023

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Beam/Cylinder Molds
X Warning Signs/Barricades/Flagmen X Curing Materials
X Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
X Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
X broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

GRACE M. MANONGSONG MERCEDES G. ASPI April 11, 2023


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

RAMIR G. BASA April 11, 2023


Project Inspector : Date
REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

MARK LESTER B. CABRAL


Project Engineer
Acc No. : 4646
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: April 12, 2023

Pouring Permit Report

Name of Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Location : Baco, Oriental Mindoro
Contractor : MIDR CONSTRUCTION & SUPPLIES
Part of Structure Estimated Volume : 75.00 cu.m.
to be Poured : Conc. Pavement R/S Date of Pouring :
Station Limits/Section: 0+550.00 to 0+625.00 April 12, 2023

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Beam/Cylinder Molds
X Warning Signs/Barricades/Flagmen X Curing Materials
X Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
X Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
X broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

GRACE M. MANONGSONG MERCEDES G. ASPI April 12, 2023


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

RAMIR G. BASA April 12, 2023


Project Inspector : Date
REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

MARK LESTER B. CABRAL


Project Engineer
Acc No. : 4646
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: April 15,2023

Pouring Permit Report

Name of Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Location : Baco, Oriental Mindoro
Contractor : MIDR CONSTRUCTION & SUPPLIES
Part of Structure Estimated Volume : 75.40 cu.m.
to be Poured : Conc. Pavement R/S Date of Pouring :
Station Limits/Section: 0+625.00 to 0+700.40 April 15,2023

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator X Field Density Test
X Protective Covering Materials X Beam/Cylinder Molds
X Warning Signs/Barricades/Flagmen X Curing Materials
X Concrete Saw X Slump Cone
X Concrete Block Spacers X Plumbness
X Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test
X broom etc.) Mix, Test Reports, etc.)
X Line and Grade alignment (form setting, Lighting System
X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)
X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)
X Rebars installation requirements X Falseworks Formworks adequacy
Checked by:

GRACE M. MANONGSONG MERCEDES G. ASPI April 15,2023


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

RAMIR G. BASA April 15,2023


Project Inspector : Date
REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :
MARK LESTER B. CABRAL
Project Engineer
Acc No. : 4646
23ED0091
EFFECTIVITY : 30-Mar-23
ORIG/REV EXPIRY: 07/31/2023/ 09/29/2023
ORIG/REV AMOUNT: 9,746,587.99/ 9,899,952.33
ORIG CD/ REV CD : 124/184
TIME EXTENSION: 60 DAYS
L.N. SALVADOR CONSTRUCTION CORP.
REPORT ON CONCRETE WORKS

Lab. Number: RCW-RAB-311-01

Project: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: Concrete Pavement R/S

Station/Station Limits: 0+000.00 to 0+400.00

==================================================================

Date & Time of Pouring: 04/08/23 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : 20 Baggers _________________
Method of Mixing: Concrete Mixer Designed Cement Factor: 9.5 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 21.89 liters
Fine Aggregates: 92.84 cu.m. Coarse Aggregates: 108.98 cu.m.
Cement used(TOTAL): 713 Bags Vol. of Concrete Poured: 75.00 cu.m.
Admixture: None cc/ bag of cement

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - 9.51 9.50
Water, L/bag - - - - - - - - - - - - - - . 21.89 liters 22.00
Slump, mm - - - - - - - - - - - - - - - 75.00 75.00

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Beam Sample Sample Identification: RAB-FT-01-A,B & C


Quantity Represented: 75.00 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES April 8, 2023
(Name and Designation) (Office) (Date)

==================================================================

CHECKED BY: SUBMITTED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-RAB-311-02

Project: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: Conc. Pavement

Station/Station Limits: 0+400.00 to 0+475.00

==================================================================

Date & Time of Pouring: 04/10/23 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : 20 Baggers _________________
Method of Mixing: Concrete Mixer Designed Cement Factor: 9.5 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 21.89 liters
Fine Aggregates: 92.84 cu.m. Coarse Aggregates: 108.98 cu.m.
Cement used(TOTAL): 713 Bags Vol. of Concrete Poured: 75.00 cu.m.
Admixture: None cc/ bag of cement

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - 9.51 9.50
Water, L/bag - - - - - - - - - - - - - - . 21.89 liters 22.00
Slump, mm - - - - - - - - - - - - - - - 75.00 75.00

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Beam Sample Sample Identification: RAB-FT-02-A,B & C


Quantity Represented: 75.00 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES April 10, 2023
(Name and Designation) (Office) (Date)

==================================================================

CHECKED BY: SUBMITTED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-RAB-311-03

Project: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: Conc. Pavement R/S

Station/Station Limits: 0+475.00 to 0+550.00

==================================================================

Date & Time of Pouring: 04/11/23 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : 20 Baggers _________________
Method of Mixing: Concrete Mixer Designed Cement Factor: 9.5 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 21.89 liters
Fine Aggregates: 92.84 cu.m. Coarse Aggregates: 108.98 cu.m.
Cement used(TOTAL): 713 Bags Vol. of Concrete Poured: 75.00 cu.m.
Admixture: None cc/ bag of cement

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - 9.51 9.50
Water, L/bag - - - - - - - - - - - - - - . 21.89 liters 22.00
Slump, mm - - - - - - - - - - - - - - - 75.00 75.00

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Beam Sample Sample Identification: RAB-FT-03-A,B & C


Quantity Represented: 75.00 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES April 11, 2023
(Name and Designation) (Office) (Date)

==================================================================

CHECKED BY: SUBMITTED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-RAB-311-04

Project: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: Conc. Pavement R/S

Station/Station Limits: 0+475.00 to 0+550.00

==================================================================

Date & Time of Pouring: 04/12/23 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : 20 Baggers _________________
Method of Mixing: Concrete Mixer Designed Cement Factor: 9.5 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 21.89 liters
Fine Aggregates: 92.84 cu.m. Coarse Aggregates: 108.98 cu.m.
Cement used(TOTAL): 713 Bags Vol. of Concrete Poured: 75.00 cu.m.
Admixture: None cc/ bag of cement

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - 9.51 9.50
Water, L/bag - - - - - - - - - - - - - - . 21.89 liters 22.00
Slump, mm - - - - - - - - - - - - - - - 75.00 75.00

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Beam Sample Sample Identification: RS-RAB-FT-04-A,B & C


Quantity Represented: 75.00 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES April 12, 2023
(Name and Designation) (Office) (Date)

==================================================================

CHECKED BY: SUBMITTED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
REPORT ON CONCRETE WORKS

Lab. Number: RCW-RAB-311-05

Project: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name of Project) 625 12-Apr-23
Structure & Part of Structure Concrete: Conc. Pavement R/S

Station/Station Limits: 0+550.00 to 0+700.40

==================================================================

Date & Time of Pouring: April 15,2023 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : 20 Baggers _________________
Method of Mixing: Concrete Mixer Designed Cement Factor: 9.5 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 21.89 liters
Fine Aggregates: 92.84 cu.m. Coarse Aggregates: 108.98 cu.m.
Cement used(TOTAL): 717 Bags Vol. of Concrete Poured: 75.40 cu.m.
Admixture: None cc/ bag of cement

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - 9.51 9.50
Water, L/bag - - - - - - - - - - - - - - . 21.89 liters 22.00
Slump, mm - - - - - - - - - - - - - - - 75.00 75.00 MM

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Beam Sample Sample Identification: RS-RAB-C-FT-05-A,B & C


Quantity Represented: 75.40 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES April 15,2023
(Name and Designation) (Office) (Date)

==================================================================

CHECKED BY: SUBMITTED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: May 06, 2023

LAB. NUMBER: RAB-FT-01


PROJECT: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 4.50 Mpa .
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION & SUPPLIES April 8, 2023
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH May 6, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH May 6, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
MPA MPA
RAB'-FT-01-A 0+325.00 to 0+400.00 April 8, 2023 28 4.73 4.50
RAB-FT-01-B 0+325.00 to 0+400.00 April 8, 2023 28 4.59 4.50
RAB-FT-01-C 0+325.00 to 0+400.00 April 8, 2023 28 4.61 4.50
X-X-X-X

==========================================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel. 475 4/10/2023

PREPARED BY: SUBMITTED BY:

AARON LOUIE C. ALULOD MERCEDES G. ASPI


Laboratory Technician II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: May 8, 2023


LAB. NUMBER: RAB-FT-02
PROJECT: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 4.50 Mpa .
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION & SUPPLIES April 10, 2023
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH May 8, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: R.S. Romasanta DPWH May 8, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
MPA MPA
RAB-FT-02-A 400 to 475 April 10, 2023 28 4.74 4.50
RAB-FT-02-B 0+400.00 to 0+475.00 April 10, 2023 28 4.80 4.50
RAB-FT-02-C 0+400.00 to 0+475.00 April 10, 2023 28 4.75 4.50
X-X-X-X

==========================================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

AARON LOUIE C. ALULOD MERCEDES G. ASPI


Laboratory Technician II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: May 09, 2023


LAB. NUMBER: RAB-FT-03
PROJECT: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 4.50 Mpa .
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION & SUPPLIES April 11, 2023
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH May 09, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH May 09, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
MPA MPA
ITS-FT-03-A 0+475.00 to 0+550.00 April 11, 2023 28 4.61 4.50
ITS-FT-03-B 0+475.00 to 0+550.00 April 11, 2023 28 4.79 4.50
ITS-FT-03-C 0+475.00 to 0+550.00 April 11, 2023 28 4.65 4.50
X-X-X-X
==========================================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

AARON LOUIE C. ALULOD MERCEDES G. ASPI


Laboratory Technician II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: May 10, 2023


LAB. NUMBER: RAB-FT-04
PROJECT: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 4.50 Mpa .
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION & SUPPLIES April 12, 2023
(Name and Designation) 625 (Date)
TESTED BY: QAS PERSONNEL DPWH May 10, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH May 10, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
MPA MPA
RS-RAB-FT-04-A 0+550.00 to 0+625.00 April 12, 2023 28 4.79 4.50
RS-RAB-FT-04-B 0+550.00 to 0+625.00 April 12, 2023 28 4.60 4.50
RS-RAB-FT-04-C 0+550.00 to 0+625.00 April 12, 2023 28 4.70 4.50
X-X-X-X

==========================================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

AARON LOUIE C. ALULOD MERCEDES G. ASPI


Laboratory Technician II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: May 11, 2023


LAB. NUMBER: RAB-FT-05
PROJECT: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 4.50 Mpa .
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION & SUPPLIES April 15,2023
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH May 11, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH May 11, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
MPA MPA
RS-RAB-FT-05-A 0+625.00 to 0+700.40 April 15,2023 28 4.76 4.50
RS-RAB-FT-05-B 0+625.00 to 0+700.40 April 15,2023 28 4.61 4.50
RS-RAB-FT-05-C 0+625.00 to 0+700.40 April 15,2023 28 4.85 4.50
X-X-X-X

===========================================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

AARON LOUIE C. ALULOD MERCEDES G. ASPI


Laboratory Technician II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: April 3, 2023


LAB. NUMBER: RAB-FT-06
PROJECT: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 4.50 Mpa .
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION & SUPPLIES March 6, 2023
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH April 3, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH April 3, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
MPA MPA
RS-RAB-FT-06-A 0+700.40 to 0+325.00 3/6/2023 28 4.81 4.50
RS-RAB-FT-06-B 0+700.40 to 0+325.00 3/6/2023 28 4.68 4.50
RS-RAB-FT-06-C 0+700.40 to 0+325.00 3/6/2023 28 4.62 4.50
X-X-X-X

===============================================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

AARON LOUIE C. ALULOD MERCEDES G. ASPI


Laboratory Technician II Engineer III
311 STATION AGE SPECS VOL
1-Apr NO POURING
2-Apr NO POURING
3-Apr NO POURING
4-Apr NO POURING
5-Apr NO POURING
6-Apr NO POURING
7-Apr NO POURING
8-Apr 0+000.00 to 0+400.00 28 4.5 75.00
9-Apr
10-Apr 0+400.00 to 0+475.00 28 4.5 75.00
11-Apr 0+475.00 to 0+550.00 28 4.5 75.00
12-Apr 0+475.00 to 0+550.00 28 4.5 75.00
13-Apr NO POURING
14-Apr NO POURING 28
15-Apr 0+550.00 to 0+700.40 28 4.5 75.4
16-Apr 28 3000
17-Apr 28 3000 3234 3232 3244
18-Apr 28 3000 3236 3238 3245
19-Apr 28 3000 3238 3231 3239
20-Apr
21-Apr
22-Apr
23-Apr
24-Apr
25-Apr
26-Apr
27-Apr
28-Apr
29-Apr
30-Apr
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

CONTRACT ID: 23ED0006


CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

LOCATION : Baco, Oriental Mindoro


KIND OF MATERIALS: Construction of Field Office for the Engineer (Area = 4m x 3m)

ITEM NO. INSPECTED: A.1.1(3) DATE: February 13, 2023

PROPOSED USED: temporary office space on your construction site

REMARKS/RECOMMENDATION:

Inspected by:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

CONTRACT ID: 23ED0006


CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

LOCATION : Baco, Oriental Mindoro


KIND OF MATERIALS: Provision of Furniture/Fixtures & Appliances for the living Quarters for the Engineer (Rental Basis)

ITEM NO. INSPECTED: A.1.1.(22) DATE: February 13, 2023

PROPOSED USED:

REMARKS/RECOMMENDATION:

Inspected by:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

CONTRACT ID: 23ED0006


CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

LOCATION : Baco, Oriental Mindoro


KIND OF MATERIALS: Provision of 4x2 Pick-up Type Service Vehicle for the Engineer on Bare Rental Basis

ITEM NO. INSPECTED: A.1.2(4) DATE: February 13, 2023

PROPOSED USED: for the service of the engineer

REMARKS/RECOMMENDATION:

Inspected by:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

CONTRACT ID: 23ED0006


CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

LOCATION : Baco, Oriental Mindoro


KIND OF MATERIALS: Operation and Maintenance of 4x2 Pick-up Type Service Vehicle for the Engineer

ITEM NO. INSPECTED: A.1.2(6) DATE: February 13, 2023

PROPOSED USED: for the maintenance of the vehicle of the engineer

REMARKS/RECOMMENDATION:

Inspected by:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

CONTRACT ID: 23ED0006


CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

LOCATION : Baco, Oriental Mindoro


KIND OF MATERIALS: Project Billboard/Signboard

ITEM NO. INSPECTED: B.5 DATE: February 13, 2023

PROPOSED USED:

REMARKS/RECOMMENDATION:

Inspected by:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

CONTRACT ID: 23ED0006


CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

LOCATION : Baco, Oriental Mindoro


KIND OF MATERIALS: Occupational Safety & Health Program

ITEM NO. INSPECTED: B.7 (1) DATE: February 13, 2023

PROPOSED USED: for safety purposes

REMARKS/RECOMMENDATION:

Inspected by:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

CONTRACT ID: 23ED0006


CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

LOCATION : Baco, Oriental Mindoro


KIND OF MATERIALS: Traffic Management

ITEM NO. INSPECTED: B.8 (2) DATE: February 16, 2023

PROPOSED USED: attaining maximum efficiency from the existing road network
while minimising adverse impacts of traffic

REMARKS/RECOMMENDATION:

Inspected by:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

CONTRACT ID: 23ED0006


CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

LOCATION : Baco, Oriental Mindoro


KIND OF MATERIALS: Mobilization/Demobilization

ITEM NO. INSPECTED: B.9 DATE: February 13, 2023

PROPOSED USED:

REMARKS/RECOMMENDATION:

Inspected by:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

CONTRACT ID: 23ED0006


CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

LOCATION : Baco, Oriental Mindoro


KIND OF MATERIALS: Portland Cement Concrete Pavement (Unreinforced) 0.20 m thick
Concrete Saw, Pipe Sleeve, 2" diam. G.I. Pipe S40, Grease/Tar, Steel Forms

ITEM NO. INSPECTED: 311 (1) b1 DATE: February 22, 2023

PROPOSED USED: for the maintenance of the vehicle of the engineer

REMARKS/RECOMMENDATION:

Inspected by:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

CONTRACT ID: 23ED0006


CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

LOCATION : Baco, Oriental Mindoro


KIND OF MATERIALS: Stone Masonry
Wheep Holes, Filter Cloth, Boulders

ITEM NO. INSPECTED: 506 (1) DATE: February 15, 2023

PROPOSED USED:

REMARKS/RECOMMENDATION:

Inspected by:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

CONTRACT ID: 23ED0006


CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

LOCATION : Baco, Oriental Mindoro


KIND OF MATERIALS: Stone Masonry
Structural Concrete Class B (18 Mpa) - Wheel Guard

ITEM NO. INSPECTED: 405 (2) c DATE: March 01, 2023

PROPOSED USED:

REMARKS/RECOMMENDATION:

Inspected by:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
MINDORO ORIENTAL DISTRICT ENGINEERING OFFICE

STATUS O F TEST
As of FEBRUARY 2023
Physical Accomplishment: 15.18%
CONTRACT ID: 23ED0006
CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
LOCATION: Baco, Oriental Mindoro
CONTRACTOR : MIDR CONSTRUCTION & SUPPLIES

Pay Item Contract No. of Test % of Work


Description/Materials Unit Min. # Total Required
No. Quantity On File Balance Accomplished

PART A FACILITIES FOR THE ENGINEER

Construction of Field Office for the Inspection Report IR IR


A.1.1(3) Engineer (Area = 4m x 3m) 1.00 l.s. 6.00%
Provision of Furniture/Fixtures &
Appliances for the living Quarters Inspection Report IR IR
A.1.1.(22) for the Engineer (Rental Basis) 4.53 month 5.96%
Provision of 4x2 Pick-up Type
Service Vehicle for the Engineer on V- Inspection Report IR IR
A.1.2(4) Bare Rental Basis 4.53 Month 5.96%
Operation and Maintenance of 4x2
Pick-up Type Service Vehicle for the V- Inspection Report IR IR
A.1.2(6) Engineer 4.53 Month 5.96%

PART B OTHER GENERAL REQUIREMENTS

Inspection Report IR
B.5 Project Billboard/Signboard 2.00 each 100.00%

Occupational Safety & Health Inspection Report IR IR


B.7 (1) Program 4.53 Months 5.96%

Inspection Report IR IR
B.8 (2) Traffic Management 1.00 l.s. 6.00%

Inspection Report IR IR
B.9 Mobilization/Demobilization 1.00 l.s. 25.00%

Inspection Report IR
B.12 Removal and Relocation of Utilities 1.00 l.s.

PART C EARTHWORKS
Individual Removal of Trees (small
b,above 150mm dia.Up to 300mm Engineer's Certification EC
100 (3) a1 dia) 90.00 each
Individual Removal of Trees(small
b, above 301mm dia Up to 500 mm Engineer's Certification EC
100 (3) a2 dia.) 18.00 each

Individual Removal of Trees (Small, Engineer's Certification EC


100(3)a3 501-750mm dia) 6.00 each

Removal of Existing Concrete Engineer's Certification EC


101(3)b1 Pavement (0.15m thk PCCP) 80.10 sq.m.

Surplus Common Roadway Engineer's Certification EC EC 16.67%


102(2) Excavation 3,813.54 cu.m.

GPC-1, D-1 GPC-1, D-1


103(3) Foundation Fill 7.44 cu.m.

Pipe Culvert and Drain Excavation, Engineer's Certification EC


103(6) a Common Soil 112.46 cu.m.

Embankment from roadway GPC - 1 , D - 18 GPC - 1 , D - 18


104(1) a excavation, Common Soil 596.76 cu.m.

Subgrade Preparation,Common GPC -1, D-5 GPC - 1 , D-1 D-4


105 (1) a Material 949.60 sq.m. 19.20%
PART D SUBBASE AND BASE COURSE
200(1) Aggregate Subbase Course 2,079.40 cu.m. GP-7,C-2,ABR-2,CBR-1,D-63 GP-1, C-1, ABR-1,CBR-1, D-7 GP-6, C-1, ABR-1, D-56 9.91%
PART E SURFACE COURSES
Portland Cement Concrete
Pavement (Unreinforced) 0.20 m
311 (1) b1 thick 6,257.00 sq.m. 19.18%

a. Concrete 1,251.40 cu.m. ##-1/PD Approx-17 sets ##-1/PD Approx-5 sets ##-1/PD Approx-13 sets 19.18%

b. Reinforcing Steel Bar 2,440.23 kgs 1-QT/10000 kgs/size 1-QT/10000 kgs/size 100.00%

c. Curing Compound 1,814.53 L 1-QT/per shipment 1-QT/per shipment 100.00%

d. Asphalt Sealant 750.84 L 1-QT/40 M.T. 1-QT/40 M.T. 100.00%


Inspection Report IR IR
e. Steel Forms (Rental ) - 23cm width 2,878.22 m 19.18%

f. Sand 688.27 cu.m. G-10, 1-Q** **Q-1, G-2 G-8 19.18%

g. Crushed Gravel 1,251.40 cu.m. Q-1,G-17 Q-1,G-4 G-13 19.18%

h. Cement 11,888.30 bags Q-6 Q-6 100.00%


i. Concrete Saw (Diamond Blade 14" Inspection Report IR IR
diam.) 0.94 pc 19.18%

Inspection Report IR IR
j. Pipe Sleeve, 2" diam. G.I. Pipe S40 53.81 m 19.18%

k. Grease/Tar 35.04 L Inspection Report IR IR 19.18%

l. Water 1.00 ltr Engineer's Certification EC 100.00%

m. Design Mix with trial mix 1.00 ltr ##-1 ##-1 100.00%

n. Completed pavement 6,257.00 sq.m. T-5/Km/lane T-5/Km/lane

Portland Cement Concrete


Pavement (Unreinforced) 0.15 m
311 (1) f1 thick 637.04 sq.m.
a. Concrete 95.56 cu.m. ##-1/PD Approx-2 sets ##-1/PD Approx-2 sets

b. Reinforcing Steel Bar 210.22 kgs Q-1/10,000 kgs/size Q-1/10,000 kgs/size

c. Curing Compound 184.74 L 1-QT/per shipment 1-QT/per shipment

d. Asphalt Sealant 76.44 L 1-QT/40 M.T. 1-QT/40 M.T.

Inspection Report Inspection Report


d. Steel Forms (Rental ) - 20cm width 293.04 m
f. Sand 52.56 cu.m. G-1;1-QT** G-1;1-QT**

g. Crushed Gravel 95.56 cu.m. G-2;1-QT*** G-2;1-QT***

h. Cement 910.97 bags 1-QT 1-QT

i. Concrete Saw (Diamond Blade 14" Inspection Report Inspection Report


diam.) 0.10 pc
Inspection Report Inspection Report
j. Pipe Sleeve, 2" diam. G.I. Pipe S40 4.97 m
k. Grease/Tar 0.96 L Inspection Report Inspection Report

l. Water 1.00 ltr Engineer's Certification Engineer's Certification

m. Design Mix with trial mix 1.00 ltr ##-1 ##-1

n. Completed pavement 637.04 sq.m. T-5/Km/lane T-5/Km/lane


DRAINAGE AND SLOPE
PART G PROTECTION STRUCTURES
404 (1) a Reinforcing Steel, Grade 40 4,199.35 kgs 1-QT/10000kgs/size 1-QT 100.00%
Structural Concrete Class B (18 Mpa) -
405 (2) c Wheel Guard 56.77 cu.m.
a. Lumber, Good - 4 uses 451.32 bd-ft Inspection Report `
b. Marine Plywood (1/2" x 4' x 8') 4 Inspection Report IR
uses 55.63 pc
c. Assorted CWN (1kg/100 bd-ft of Inspection Report IR
Lumber) 4.54 kg
d. Cement 454.16 bag 1-QT* 1-QT*

e. Sand 28.39 cu.m. G-1;1-QT** 1-QT**, 1-G


f. Gravel 56.77 cu.m. G-1;1-QT G-1, 1-QT
Pipe Culverts, RCPC, 910 mm dia, 1-Q 1-Q
500 (1) b3 Class IV 54.00 L.m.
506 (1) Stone Masonry 1,045.56 cu.m. 20.08%
a. Cement 5,750.58 bags 3-QT 3-QT 100.00%
b. Sand 1,725.17 cu.m. G-24;2-QT QT-1,G-2 QT-1,G-22 20.08%
c. Gravel Fill 20.91 cu.m. G-1 G-1 100.00%
d. Wheep Holes (3" PVC) 265.57 m Inspection Report Inspection Report IR 20.08%
e. Filter Cloth 13.59 sq.m. Inspection Report Inspection Report IR 20.08%

f. Boulders 1,097.84 cu.m. Inspection Report/Sp.Gr. Inspection Report/Sp.Gr. IR 20.08%


PART H MISCELLANEOUS STRUCTURES
611 (1) Trees Furnishing and Transplanting 3,500.00 each Inspection Report IR
Prepared by Submitted By:
GRACE M. MANONGSONG MERCEDES G. ASPI
Materials Engineer Chief, Quality Assurance Section
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

CONTRACT ID: 23ED0006

CONTRACT NAME: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
Mindoro

LOCATION: Baco, Oriental Mindoro


CONTRACTOR: MIDR CONSTRUCTION & SUPPLIES
ITEM NO.: 102(2) Surplus Common Roadway Excavation
KIND OF MATERIALS:

CERTIFICATION

THIS IS TO CERTIFY that the 1,635.57 cu.m. waste materials for the Item

of the afformentioned project, was disposed properly, hence no test is required.

This certification/inspection report is being used upon for the absence of

Quality Test as per Quality Control Program for the said project.

CERTIFIED BY:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
REPORT ON CONCRETE WORKS

Lab. Number: RCW-RAB-405-01

Project: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name of Project) (Town/City/Province)
Structure & Part of Structure Concrete: Concrete Pavement R/S

Station/Station Limits:
Time : 8:00am - 10:00am
==================================================================

Date & Time of Pouring: 03/01/23 Weather : Fair


Class of Concrete: Class "A" Capacity of Mixer : 20 Baggers _________________
Method of Mixing: Concrete Mixer Designed Cement Factor: 9.5 bags/cu.m.
Cement Brand: Fortune Computed Volume: 0.1053 cu.m.
Condition of Storage: Good Condition
Actual Quantities Per Batch:
Cement No. of Bags: 1 bag Water, Liters: 21.89 liters
Fine Aggregates: 92.84 cu.m. Coarse Aggregates: 108.98 cu.m.
Cement used(TOTAL): 713 Bags Vol. of Concrete Poured: 75.00 cu.m.
Admixture: None cc/ bag of cement

ACTUAL SPEC'S
Cement, factor, bags/cu.m.- - - - 9.51 9.50
Water, L/bag - - - - - - - - - - - - - - . 21.89 liters 22.00
Slump, mm - - - - - - - - - - - - - - - 75.00 75.00

____________________________________________________________________________________________

SAMPLE TAKEN

Kinds of Sample: Concrete Beam Sample Sample Identification: RAB-FT-01-A,B & C


Quantity Represented: 75.00 cu.m. Method of curing: Immersed in Water
Sampled By: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES March 1, 2023
(Name and Designation) (Office) (Date)

==================================================================

CHECKED BY: SUBMITTED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
MIDR CONSTRUCTION SUPPLIES

WORKSHEET FOR DESIGN OF CONRETE

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Province)

PREPARED BY: MARK IAN M. DELOS REYES ME MIDR CONSTRUCTION & SUPPLIES
(Name) (Designation) (Office)
LAB. NUMBER: RAB-DM-311(1)-01
DATA FROM PRELIMINARY TESTS:
Fine Aggregates, Q-FA Coarse Aggregates, Q-CA
Manufactured/Natural : /X/ Natural Rounded // Angular/X / Rounded
Finess Modulus 2.99 Maximum size, mm 19.00
Specific Gravity (SSD)_ 2.68 Abrasion Loss (%) 23
Moisture Content, % 2.19 Specific Gravity(SSD) 2.68
Absorption, % 0.82 Moisture Content, % 2.06
Unit, Wt. Kg./m3 (loose) 1548.51 Absorption, % 0.96
Type & Brand of Cement : Type 1 / Fortune Unit Wt., kg./m3 (loose) 1562.87
Admixture Brand _____ NONE___________________ Water Source Deepwell
================================================== ============================
DESIGN SPECIFICATION REQUIREMENTS:
Class of Concrete "A" Cement Factor, bags/m3 9.10
Compressive Strength, MPA 3000 Slump, mm 75
Proportion of Cement Total Aggregates Parts by Weight:
Cement: 40 Total Agg. : 209.20
============================================================= =================
DESIGN MIX PER BAG OF CEMENT:
Absolute Volume of Concrete, m3, cement factor ________ _ 0.109890
Absolute Volume of 40 kg./bag of cement, m3 0.012698
Absolute Volume of Water, m3 ________________________ 0.021888
Absolute Volume of Water and Cement, m3__________________ 0.034586
Absolute Volume of Fine & Coarse Aggregates, m3 ________________ 0.075304
Absolute Volume of Fine Aggregates, % of Total Aggregates by absolute Volume:
Fine Aggregates: ______ 46.00 (From Table V)
Total Correction (%) _________ 0.00 (From Table of Adjustments)
Corrected Fine Aggregates_______________ 46.00
Absolute Volume of Fine Aggregates, m3 ___________ 0.034640
Absolute Volume of Coarse Aggregates, m3____ _____ 0.040664

Materials Absolute Specific Unit wt. of Uncorrected Corrected


Volume m3 Gravity water kg/m3 Weights kg. Weight kg.
Cement 0.012698 3.15 1000 40.0 40
Fine Agg. 0.034640 2.68 1000 92.84 94.11
Coarse Agg. 0.040664 2.68 1000 108.98 110.18
Water 0.021888 1.00 1000 21.89 19.42
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = == = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer Materials Engineer Engineer III
MIDR CONSTRUCTION & SUPPLIES DPWH-MODEO CHIEF, QAS-MODEO
MIDR CONSTRUCTION & SUPPLIES

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name) (Town/City/Province)
Kind of Materials : Subgrade Preparation Specification Item No. : 105(1)a
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : Tigkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 15, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 15, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 15, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-105-01 Original Weight in grams : 3970


Oven Dried Weight : 3854
Moisture Content, % : 3.00 Washed Ovendried Weight: 3472
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing %
Passing
3" 75.0 mm
2 1/2" 63.0 mm
2" 50.0 mm 0 3854 100 100
1 1/2" 37.5 mm 77 3777 98
1" 25.0 mm 540 3237 84
3/4" 19.0 mm 231 3006 78
1/2" 12.5 mm 347 2659 69
3/8" 9.5 mm 308 2351 61
No. 4 4.75 mm 540 1811 47
No. 8 2.36 mm 193 1619 42
No. 10 2.00 mm 270 1349 35
No. 16 1.18 mm 270 1079 28
No. 30 0.600 mm 231 848 22
No. 40 0.425 mm 116 732 19
No. 50 0.300 mm 231 501 13
No. 100 0.150 mm 39 462 12
No. 200 0.075 mm 39 424 11 0-15
PAN 42
Wash Passing 200 382
TOTAL 3854

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer- Contractor Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES
WORKSHEET FOR FIELD DENSITY TEST

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name) (Town /City/ Province)
KIND OF MATERIALS: Granular Materials
TEST HOLE: DEPTH: 0.150M. LOCATION :
(Location & Reference to Center Line)
REPRESENTING: 1st Layer 0.15 M. to _________ __________.
(Layer No.) (Depth) (Station to Station) (Width)
TESTED BY: Contractor's Tech Contractor February 16, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor's Tech Contractor February 16, 2023
(Name and Designation) (Office) (Date)
====================================================== ======= ======== ====
LAB. NUMBER: RAB-D-105-1

UNIT WEIGHT OF AIR-DRY SAND MASS OF SAND TO FILL FUNNEL


1. Container Full of Water, kg. 6.6 8. Mass of Jar + Sand, kg. 8.34
2. Container, kg. 2.28 9. Mass of Jar + Sand, kg. 6.77
3. Water, kg. (1) - (2) 4.320 10. Sand in Funnel, kg. (8) - (9) 1.57
4. Container, m3 (3)/ 1000 0.00432
5. Container filled with air
dry sand, kg. 8.70
6. Air-dry sand, kg. (5) - (2) 6.42
7. Unit weight of dry sand,
kg. /m3 (6- / (4) 1486.11
1 2 3
ACTUAL MOISTURE CONTENT
11. Container + Wet soil, g. 152.00 154.50 151.00 154.30
12. Container + Dry soil, g. 135.00 140.00 134.00 140.00
13. Moisture, g. (11) - (12) 17.00 14.50 17.00 14.30
14. Container, g. 18.50 18.50 18.50 18.50
15. Dry Soil, g. (12) - (14) 116.50 121.50 115.50 121.50
16. Actual Moisture Content (13)/(15)x100 14.59 11.93 14.72 11.77
17. Average actual moisture
Content, % 13.26 13.24
FIELD DENSITY TEST
18. Total matl. taken from hole, kg. 6.10 6.10
19. Mass of jar - Sand, kg. 9.960 9.960
20. Mass of jar+Sand,kg.(after pouring) 4.47 4.47
21. Sand to fill hole, kg. (19) - (20) - 10) 3.920 3.920
22. Volume of hole, m3 (21) / (7) 0.002638 0.002638
23. Wet unit weight, kg. / m3 (18) / (22) 2312.57 2312.57
24. Dry Unit Weight,kg.M3(23)/(1+(17)/100) 2041.77 2042.11
25. Laboratory Compaction test data:
a) Maximum dry density, kg. /m3 2152 2152
b) Optimum Moisture Content 9.00 9.00
26.Degree of Compaction(24)/(25 a)x100 95% 95%

REMARKS / RECOMMENDATION: Passed.

PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer Material Engineer (DPWH) Engineer III
Chief, QAS MODEO
MIDR CONSTRUCTION & SUPPLIES

WORKSHEET FOR PLASTIC AND LIQUID LIMIT TESTS

Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Location: Baco, Oriental Mindoro
Contractor: MIDR CONSTRUCTION & SUPPLIES
Kind of Material : Embankment Spec's Item No. : 105(1)a
Sampled at : Jobsite
Original Source : Tigkan River
Sampled By : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 15, 2023
Tested By : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 15, 2023
Computed By : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 15, 2023
==================================================================================================================================

Lab. No. RAB-LLPL-105(1)a

LIQUID LIMIT PLASTIC LIMIT

Determination Number 1 2 3 4 1 2

Container Number A B C D E F

Container & Wet Soil, g 35.32 35.78 35.24 35.33 37.15 37.10
Container & Dry Soil, g 34.14 34.4 33.83 33.63 35.55 35.46
Moisture Loss, g 1.18 1.38 1.41 1.7 1.6 1.64

Container, g 29.80 29.60 29.70 28.90 27.40 26.40


Dry Soil, g 4.34 4.8 4.13 4.73 8.15 9.06

Moisture Content (%) 27 29 34 36 20 18

Number of Blows 32 27 15 10 19

FLOW CURVE

37 SIEVE ANALYSIS

36

35
Sieve Size % Passing
34
No. 10 35
M 33
No. 40 19
C 32
No. 200 11
% 31

30 Liquid Limit 29.5

29 Plastic Limit 19

28 Plasticity Index 11

27 Group Index 0

26 Group Class A-2-4

6 10 15 20 25 30 35 40 Remarks: SILTY OR CLAYEY


Number of Blows SAND & GRAVEL

Prepared / Tested By: Computed / Certified Correct: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer ( Contractor ) Material Engineer (DPWH) Chief, QAS-MODEO
WORKSHEET FOR TEST OF MOISTURE DENSITY
RELATIONS OF SOILS
Project : 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco,
Oriental Mindoro
0 (Name) (Town /City/ Province)
KIND OF MATERIALS:0 Granular Materials
SAMPLE AT: 0
JOBSITE QUANTITY REPRESENTED: 1,500.00 cu.m.
ORIGINAL SOURCE:
Tigkan River
SAMPLED BY: Contractor's
1 Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name and Designation) (Office) (Date)
TESTED BY: Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name and Designation) (Office) (Date)
===================================================
LAB. NUMBER: RAB-C-105-01
TRIAL NUMBER 1 2 3 4 5 6
Water Added in Q.C. 430 654 754.5 855 1050
Mold + Wet Soil (kg.) 10.55 10.99 11.26 11.25 10.89
M O L D (kg.) 6.28 6.28 6.28 6.28 6.28
Wet Soil (kg.) 4.27 4.71 4.98 4.97 4.61
Wet Density, kg/cu.m. 2010 2218 2345 2340 2170
Can Number A-1 A-2 A-3 A-4 A-5
Can + Wet Soil, (grams) 186.10 178.77 181.84 184.90 185.80
Can + Dry Soil, (grams) 178.46 167.80 167.83 167.86 165.20
WATER 7.64 10.97 14.00 17.04 20.60
C A N (grams) 11.10 11.20 11.2 11.20 11.00
Dry Soil (grams) 167.36 156.60 156.63 156.66 154.20
Moisture Content, % 4.57 7.01 8.94 10.88 13.36
Dry Density, kg/cu.m. 1923 2072 2152 2110 1915
=========================================================================================================
Method Used: T - 180 - D
Weight of rammer:(kg.) 4.50 kgs.
COMPACTION
Volume of Mold:(cu.m) 0.002124
0.002124
2200 Number of Blows layers: 56 / 5
Max Dry Density, kg./cu.m.: 2152
2150
D Optimum Moisture Content: 9.00
Dry Density, kg/cu.m.

R 2100
Y PREPARED BY:
2050
D MARK IAN M. DELOS REYES
2000
E Materials Engineer
N 1950
S CHECKED BY:
I 1900
T GRACE M. MANONGSONG
Y 1850 Material Engineer (DPWH)

1800
SUBMITTED BY:
4 5 6 7 8 9 10 11 12 13 14
Moisture Content, %
Moisture Content % MERCEDES G. ASPI
Engineer III
MIDR CONSTRUCTION & SUPPLIES

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Town/City/Province)
Kind of Materials : Coarse Aggregate Specification Item No. : 311(1)b1
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : TIgkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 6, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 6, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 6, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-311-CA-02 Original Weight in grams : 3506


Oven Dried Weight : 3434
Moisture Content, % : 2.10 Washed Ovendried Weight: 3428
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing % Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 3434 100 100
2" 50.0 mm 206 3228 94 90-100
1 1/2" 37.5 mm 1271 1957 57 35-70
1" 25.0 mm 1511 446 13 0-15
3/4" 19.0 mm 34 412 12
1/2" 12.5 mm 309 103 3 0-5
3/8" 9.5 mm 69 34 1
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 17 17 0.50 0-1
PAN 11
Wash Passing 200 6
TOTAL 3434

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer- Contractor Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Town/City/Province)
Kind of Materials : Coarse Aggregate Specification Item No. : 311(1)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : TIgkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 6, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 6, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 6, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-311-CA-03 Original Weig 3506


Oven Dried Weight : 3434
Moisture Content, % : 2.10 Washed Ovendried Weight: 3428
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing % Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 3434 100 100
2" 50.0 mm 206 3228 94 90-100
1 1/2" 37.5 mm 1271 1957 57 35-70
1" 25.0 mm 1511 446 13 0-15
3/4" 19.0 mm 34 412 12
1/2" 12.5 mm 309 103 3 0-5
3/8" 9.5 mm 69 34 1
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 17 17 0.50 0-1
PAN 11
Wash Passing 200 6
TOTAL 3434

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer- Contractor Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Binarilan, Canubing - Sityo Ilaya, Brgy. Malad, Calapan City, Oriental Mindoro
(Town/City/Province)
Kind of Materials : Coarse Aggregate Specification Item No. : 311(1)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : Tigkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 8, 2022
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 9, 2022
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 9, 2022
(Name & Designation) (Office) (Date)

Lab No. RAB-G-311-CA-04 Original Weight in grams : 3312


Oven Dried Weight : 3234
Moisture Content, % : 2.41 Washed Ovendried Weight: 3226
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing % Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 3228 100 100
2" 50.0 mm 123 3105 96 90-100
1 1/2" 37.5 mm 1262 1843 57 35-70
1" 25.0 mm 1423 420 13 0-15
3/4" 19.0 mm 97 323 10
1/2" 12.5 mm 194 129 4 0-5
3/8" 9.5 mm 32 97 3
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 74 23 0.70 0-1
PAN 15
Wash Passing 200 8
TOTAL 3228

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer- Contractor Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Town/City/Province)
Kind of Materials : Fine Aggregates Specification Item No. : 311(1)f1
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : Tigkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2022
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2022
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2022
(Name & Designation) (Office) (Date)

Lab No. RAB-G-311-FA-01 Original Weight in grams : 3492


Oven Dried Weight : 3417
Moisture Content, % : 2.20 Washed Ovendried Weight: 3413
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing % Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 3416 100 100
2" 50.0 mm 239 7 3177 93 90-100
1 1/2" 37.5 mm 1196 42 1981 58 35-70
1" 25.0 mm 1503 86 478 14 0-15
3/4" 19.0 mm 68 88 410 12 -
1/2" 12.5 mm 273 96 137 4 0-5
3/8" 9.5 mm 69 98 68 2 -
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 51 17 0.50 0-1
PAN 13
Wash Passing 200 4
TOTAL 3416

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Noted By:


GRACE M. MANONGSONG MERCEDES G. ASPI
Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Town/City/Province)
Kind of Materials : Fine Aggregates Specification Item No. : 311(1)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : TIgkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2022
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2022
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2022
(Name & Designation) (Office) (Date)

Lab No. RAB-G-311-FA-02 Original Weight in grams : 3506


Oven Dried Weight : 3434
Moisture Content, % : 2.10 Washed Ovendried Weight: 3428
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing % Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 3434 100 100
2" 50.0 mm 206 3228 94 90-100
1 1/2" 37.5 mm 1271 1957 57 35-70
1" 25.0 mm 1511 446 13 0-15
3/4" 19.0 mm 34 412 12
1/2" 12.5 mm 309 103 3 0-5
3/8" 9.5 mm 69 34 1
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 17 17 0.50 0-1
PAN 11
Wash Passing 200 6
TOTAL 3434

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer- Contractor Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES
WORKSHEET OF SIEVE ANALYSIS

:
Project
Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name) (Town/City/Province)
Kind of Materials : Fine Aggregate Specification Item No. 506(1) b
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : Tigkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 1, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 5, 2022
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 5, 2022
(Name & Designation) (Office) (Date)

Lab No. RAB-G-506-FA-01 Original Weight in grams : 3742


Oven Dried Weight : 3660
Moisture Content, % : 2.24 Washed Ovendried Weight: 3645
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing % Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 0 3652 100 100
2" 50.0 mm 138 4 3514 96 90-100
1 1/2" 37.5 mm 1391 42 2123 58 35-70
1" 25.0 mm 1611 86 512 14 0-15
3/4" 19.0 mm 109 89 403 11
1/2" 12.5 mm 257 96 146 4 0-5
3/8" 9.5 mm 73 98 73 2
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 41 32 0.88 0-1
PAN 17
Wash Passing 200 15
TOTAL 3652

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:


MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI
Materials Engineer- Contractor Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region -IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

DATE: March 1, 2023

Pouring Permit Report


Name of Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Location : Baco, Oriental Mindoro
Contractor : MIDR CONSTRUCTION & SUPPLIES
Part of Structure Estimated Volume : 11.18 cu.m.
to be Poured : Structural Concrete Date of Pouring :
Station Limits/Section: - March 01, 2023
Time : 8:00am - 10:00am

Requested by:
MARK IAN M. DELOS REYES
Contractor's Materials Engineer

CHECKLIST
X Concrete Vibrator Field Density Test

X Protective Covering Materials X Beam/Cylinder Molds

X Warning Signs/Barricades/Flagmen X Curing Materials

Concrete Saw X Slump Cone


X Concrete Block Spacers X Plumbness
X Finishing Tools/Equipment(Screeder X Quality of Materials Used (Result of Design/Test

broom etc.) Mix, Test Reports, etc.)


Line and Grade alignment (form setting, Lighting System

X Elevations , etc.
X Required construction equipment Electrical Layout (Roughing-ins/embedments)

X Rebars sizes, spacing and number Plumbing Layout (Roughing-ins/embedments)

X Rebars installation requirements X Falseworks Formworks adequacy


Checked by:

GRACE M. MANONGSONG MERCEDES G. ASPI March 1, 2023


Materials Engineer Engineer III Date
REMARKS/

RECOMMENDATIONS :

RAMIR G. BASA March 1, 2023


Project Inspector : Date
REMARKS/

RECOMMENDATIONS :

Request X Approved Disapproved


REMARKS/

RECOMMENDATIONS :

MARK LESTER B. CABRAL


Project Engineer
Acc No. : 4646
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: March 3, 2023


LAB. NUMBER: RAB-FT-TM-01
PROJECT:
23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 405 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 7 DAYS 4.5 Mpa .
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION & SUPPLIES February 24, 2023
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH March 3, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH March 3, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING

IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION

MPA
TM-A TRIAL MIX February 24, 2023 7 4.11 3.60
TM-B TRIAL MIX February 24, 2023 7 4.25 3.60
TM-C TRIAL MIX February 24, 2023 7 4.30 3.60
X-X-X-X

==========================================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

Prepared BY: SUBMITTED BY:

AARON LOUIE C. ALULOD MERCEDES G. ASPI


Laboratory Technician II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: March 29, 2023

LAB. NUMBER: RAB-FT-01


PROJECT: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 405 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 28 DAYS 4.50 Mpa .
SAMPLED BY: Contractor"s Personnel MIDR CONSTRUCTION & SUPPLIES March 1, 2023
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH March 29, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH March 29, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
MPA MPA
RAB'-CT-01-A STRUCTURAL CONCRETE March 1, 2023 28 4.73 4.50
RAB-CT-01-B STRUCTURAL CONCRETE March 1, 2023 28 4.59 4.50
RAB-CT-01-C STRUCTURAL CONCRETE March 1, 2023 28 4.61 4.50
X-X-X-X

==========================================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

AARON LOUIE C. ALULOD MERCEDES G. ASPI


Laboratory Technician II Engineer III
BILLING FEBRUARY MARCH
FACILITIES FOR THE ENGINEER -
Construction of Field Office for the Engineer (Area = 4m x 3m) 0.29 0.144 0.144
Provision of Furniture/Fixtures & Appliances for the living Quarters for the Engineer (Rental Basis) 1.44 0.722 0.722
Provision of 4x2 Pick-up Type Service Vehicle for the Engineer on Bare Rental Basis 1.44 0.722 0.722
Operation and Maintenance of 4x2 Pick-up Type Service Vehicle for the Engineer 1.44 0.722 0.722
OTHER GENERAL REQUIREMENTS - - -
Project Billboard/Signboard 2.00 1.000 1.000
Occupational Safety & Health Program 1.44 0.722 0.722
Traffic Management 0.24 0.120 0.120
Mobilization/Demobilization 0.50 0.250 0.250
Removal and Relocation of Utilities - - -
EARTHWORKS - - -
Individual Removal of Trees (small b,above 150mm dia.Up to 300mm dia) 7.00 3.500 3.500
Individual Removal of Trees(small b, above 301mm dia Up to 500 mm dia.) 2.00 1.000 1.000
Individual Removal of Trees (Small, 501-750mm dia) 1.00 0.500 0.500
Removal of Existing Concrete Pavement (0.15m thk PCCP) 80.10 40.050 40.050
Surplus Common Roadway Excavation 1,635.57 817.785 817.785
Foundation Fill 2.00 1.000 1.000
Pipe Culvert and Drain Excavation, Common Soil 25.00 12.500 12.500
Embankment from roadway excavation, Common Soil 293.09 146.545 146.545
Subgrade Preparation,Common Material 504.31 252.155 252.155
SUBBASE AND BASE COURSE - - -
Aggregate Subbase Course 506.01 253.005 253.005
SURFACE COURSES - - -
Portland Cement Concrete Pavement (Unreinforced) 0.20 m thick 1,700.00 850.000 850.000
Portland Cement Concrete Pavement (Unreinforced) 0.15 m thick - - -
DRAINAGE AND SLOPE PROTECTION STRUCTURES - - -
Reinforcing Steel, Grade 40 1,290.62 645.310 645.310
Structural Concrete Class B (18 Mpa) - Wheel Guard 11.18 5.590 5.590
Pipe Culverts, RCPC, 910 mm dia, Class IV - - -
Stone Masonry 629.99 314.995 314.995
MISCELLANEOUS STRUCTURES - - -
Trees Furnishing and Transplanting - - -
PENETRATION AT 65 BLOWS

120.00

100.00
(80/105.7)X 100 = 79.69%
Penetration
Load(kg./cm²) 80.00(60.82/70.3)X 100 = 86.51%

60.00 CBR₆₅ = 86.51%

40.00

20.00

0.00
0 1 2 3 4 5 6 7 8 9 10 11

Penetration,mm

PENETRATION AT 30 BLOWS

90.00
80.00
70.00
(64/105.7)X 100 = 60.55%
60.00
Penetration (45/70.3)X 100 = 64.01%
50.00
Load(kg./cm²)
40.00 CBR₆₅ = 64.01%

30.00

20.00

10.00

0.00
0 1 2 3 4 5 6 7 8 9 10 11

Penetration,mm

120.00

110.00

90.00 Unit WT

CBR VALUE CBR₃₀ = 64.01 2008.02 g/cu.m.


80.00
CBR₆₅ = 86.51 2121.95 g/cu.m.

70.00
CBR VALUE = 82%

60.00

1900 1950 2000 2050 2100 2150 2200

DRY UNIT WEIGHT


MIDR CONSTRUCTION & SUPPLIES

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name) (Town/City/Province)
Kind of Materials : Aggregate Subbase Course Specification Item No. : 200 (1)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : Tigkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-200-02 Original Weight in grams : 3371


Oven Dried Weight : 3338
Moisture Content, % : 1.00 Washed Ovendried Weight: 3194
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained,
English Metric gram % Retained Weigth passing, gram % passing
% Passing
3" 75.0 mm
2 1/2" 63.0 mm
2" 50.0 mm 0 3338 100 100
1 1/2" 37.5 mm 67 3271 98
1" 25.0 mm 567 2704 81 55-85
3/4" 19.0 mm 67 2637 79
1/2" 12.5 mm 167 2470 74
3/8" 9.5 mm 367 2103 63 40-75
No. 4 4.75 mm 33 2070 62
No. 8 2.36 mm 401 1669 50
No. 10 2.00 mm 467 1202 36
No. 16 1.18 mm 100 1102 33
No. 30 0.600 mm 134 968 29
No. 40 0.425 mm 300 668 20
No. 50 0.300 mm 167 501 15
No. 100 0.150 mm 100 401 12
No. 200 0.075 mm 167 234 7 0-12
PAN 90
Wash Passing 200 144
TOTAL 3338

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer- Contractor Engineer II Engineer III
MIDR CONSTRUCTION SUPPLIES
WORKSHEET FOR TEST OF MOISTURE DENSITY
RELATIONS OF SOILS
Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

0 (Name) (Town /City/ Province)


KIND OF MATERIALS: 0 Granular Materials
SAMPLE AT: 0
JOBSITE QUANTITY REPRESENTED: 1,500.00 cu.m.
ORIGINAL SOURCE: Tigkan River
SAMPLED BY: Contractor's
1 Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name and Designation) (Office) (Date)
TESTED BY: Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name and Designation) (Office) (Date)
================================================ ==========================
LAB. NUMBER: RAB-C-200-01
TRIAL NUMBER 1 2 3 4 5 6
Water Added in Q.C. 450 650 750 850 1050
Mold + Wet Soil (kg.) 10.54 10.98 11.22 11.18 10.88
M O L D (kg.) 6.25 6.25 6.25 6.25 6.25
Wet Soil (kg.) 4.29 4.73 4.97 4.93 4.63
Wet Density, kg/cu.m. 2020 2227 2340 2321 2180
Can Number A-1 A-2 A-3 A-4 A-5
Can + Wet Soil, (grams) 186.10 178.77 181.84 184.90 185.80
Can + Dry Soil, (grams) 178.46 167.80 167.83 167.86 165.20
WATER 7.64 10.97 14.00 17.04 20.60
C A N (grams) 11.10 11.20 11.2 11.20 11.00
Dry Soil (grams) 167.36 156.60 156.63 156.66 154.20
Moisture Content, % 4.57 7.01 8.94 10.88 13.36
Dry Density, kg/cu.m. 1932 2081 2148 2093 1923
=========================================================================================================
Method Used: T - 180 - D
Weight of rammer:(kg.) 4.50 kgs.
COMPACTION
Volume of Mold:(cu.m) 0.002124
2200 Number of Blows layers: 56 / 5
Max Dry Density, kg./cu.m.: 2148
2150
D Optimum Moisture Content: 9.00
Dry Density, kg/cu.m.

R 2100
Y PREPARED BY:
2050
D MARK IAN M. DELOS REYES
2000
E Materials Engineer
N 1950
S CHECKED BY:
I 1900
T GRACE M. MANONGSONG
Y 1850 #VALUE!

1800
SUBMITTED BY:
4 5 6 7 8 9 10 11 12 13 14
Moisture Content, %
Moisture Content % MERCEDES G. ASPI
Engineer III
MIDR CONSTRUCTION & SUPPLIES

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name) (Town/City/Province)
Kind of Materials : Aggregate Subbase Course Specification Item No. : 200 (1)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : Tigkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-200-01 Original Weight in grams : 3372


Oven Dried Weight : 3339
Moisture Content, % : 1.00 Washed Ovendried Weight: 3195
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained,
English Metric gram % Retained Weigth passing, gram % passing
% Passing
3" 75.0 mm
2 1/2" 63.0 mm
2" 50.0 mm 0 3339 100 100
1 1/2" 37.5 mm 67 3272 98
1" 25.0 mm 568 2705 81 55-85
3/4" 19.0 mm 67 2638 79
1/2" 12.5 mm 167 2471 74
3/8" 9.5 mm 367 2104 63 40-75
No. 4 4.75 mm 33 2070 62
No. 8 2.36 mm 401 1670 50
No. 10 2.00 mm 467 1202 36
No. 16 1.18 mm 100 1102 33
No. 30 0.600 mm 134 968 29
No. 40 0.425 mm 301 668 20
No. 50 0.300 mm 167 501 15
No. 100 0.150 mm 100 401 12
No. 200 0.075 mm 167 234 7 0-12
PAN 90
Wash Passing 200 144
TOTAL 3339

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer- Contractor Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR ABRASION TEST

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

(Name) (Town/City/Province)
KIND OF MATERIALS: Aggregate Subbase Course Spec's Item No.: 200
SAMPLED AT: Jobsite Stockpile
(Give as accurate a location as possible)
ORIGINAL SOURCE: Tigkan River
(Pit, Quarry, River, etc. and location)
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name and Designation) (Office) (Date)
TESTED BY: MQC Personnel DPWH February 16, 2023
(Name and Designation) (Office) (Date)

Lab. Number : RAB-ABR-01

SIEVE SIZE GRADING "A"


Passing Retained No. of Spheres - 12
37.5 mm 25 mm - 1250 gms
25 mm. 19.0 m. - 1250 gms
19.0 mm. 12.5 mm. - 1250 gms
12.5 m. 9.5 m. - 1250 gms
TOTAL 5000 gms

Percentage of Wear % = Original Mass - Sample retained


of Sample No. 1.70 mm sieve, g. X 100
Original of Sample, g.

= 1150
5000 X 100

% of Wear = 23.00 SPECS = 40%

REMARKS: PASSED

Prepared by: Checked by: Noted By:


AARON LOUIE C. ALULOD GRACE M. MANONGSONG MERCEDES G. ASPI
Laboratory Technician II Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET OF SIEVE ANALYSIS

Project : Concreting of Inarawan-Tagumpay-San Andres Putik Road, Naujan, Oriental Mindoro


(Name) (Town/City/Province)
Kind of Materials : Aggregate Subbase Course Specification Item No. : 200(1)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : Alcate River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 16, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-CA-02 Original Weight in grams : 3970


Oven Dried Weight : 3885
Moisture Content, % : 2.20 Washed Ovendried Weight: 3874
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained,
gram
%
English Metric % Retained Weigth passing, gram % passing
Passing
3" 75.0 mm
2 1/2" 63.0 mm
2" 50.0 mm 100
1 1/2" 37.5 mm 100 100
1" 25.0 mm 0 3885 100 95-100
3/4" 19.0 mm 932 24 2953 76 -
1/2" 12.5 mm 1437 61 1515 39 25-60
3/8" 9.5 mm 699 79 816 21 -
No. 4 4.75 mm 738 78 2 0-10
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 62 16 0.40 0-1
PAN 5
Wash Passing 200 11
TOTAL 3885

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:

GRACE M. MANONGSONG GRACE M. MANONGSONG MERCEDES G. ASPI


Material Engineer (DPWH) Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR CALIFORNIA BEARING RATIO


(AASHTO T183-99)

Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name of Project) (Province)
Contractor: MIDR CONSTRUCTION & SUPPLIES
Kind of Materials: AGGREGATE SUB BASE COURSE Spec's. Item Number : 200
Sampled At: Tigkan River
(Given the accurate location as posible)
Tested By: QAS Personnel MODEO-QAS 16-Feb-23
(Name and Designation) (Office) (Date)
Computed By: QAS Personnel MODEO-QAS 16-Feb-23
(Name and Designation) (Office) (Date)
Laboratory Number: BANGKATAN-CBR-200-01

DENSITY DETERMINATION MOISTURE CONTENT


NO. OF BLOWS NO. OF BLOWS
TEST SAMPLE TEST NUMBER
65 30 10 65 30 10
Mold Identification C D Can number 2 4 6 8
Compacted sample + mold, g 14335 14103 Can + wet soil 188.10 179.13 185.77 192.15
Wt. of mold, g 9513 9540 Can + oven dry soil 177.42 169.04 175.21 181.22
Wt. of sample, g 4822 4563 Wt. of water 10.68 10.09 10.56 10.93
Volume of mold 2.125 2.125 Wt. of can 25.25 25.27 25.29 25.31
Wet Density, g/cm³ 2269.18 2147.29 Wt. of oven dry soil 152.17 143.77 149.92 155.91
Dry Density,g/cm³ 2120.33 2006.25 Moisture Loss,% 7.02 7.02 7.04 7.01
NOTE: Allowable variation from optimum is plus or minus 0.5%. If Average Moisture Loss% 7.02 7.03
variation exceeds allowable discard specimen and mold another to meet
the requirements M.C. After Penetration

SOAKED SAMPLE SWELL DATA


Swell, % = swell / ht
Mold I.D. Date Molded 1st Day 2nd Day 3rd Day 4th Day
of soil, mm
Sample No.
1 65 - C 11-Mar-22 4 8 8 6.4
2 30 - D 11-Mar-22 8 14 14 11.2
3

SOAKED COMPACTED VALUES


Penetration Test Sample 65 Blows Penetration Test Sample 30 Blows

(mm) Dial Load Load Corrected Std. CBR (mm) Dial Load Load Corrected Std. CBR
Reading kg. (kg./cm² (kg./cm²) Load (%) Reading kg. (kg./cm² (kg./cm² Load (%)
0 0 0 0 0 0 0 0
0.6350 2.25 60.89 3.15 0.6350 1.05 28.30 1.46
1.2700 9.65 261.13 13.50 1.2700 6.83 184.07 9.51
1.9100 18.75 507.38 26.22 1.9100 14.36 387.00 20.00
2.5400 25.44 688.41 35.58 43.8 70.3 62.30 2.5400 18.95 510.70 26.39 32.00 70.3 45.52
3.8100 34.21 925.72 47.84 3.8100 25.77 694.50 35.89
5.0800 40.2 1087.81 56.22 60 105.7 56.76 5.0800 30.45 820.63 42.41 44.00 105.7 41.63
7.6200 50.1 1355.71 70.06 7.6200 36.35 979.63 50.63
10.1600 55.74 1508.32 77.95 10.1600 41.54 1119.50 57.86

Piston Area 19.35 cm²


Max. Dry Density(MDD) 2100
Optimum Moisture Content(OMC) 7.80%
Calibration Factor 27.06 kgs.

PREPARED / TESTED BY: Submitted By:

GRACE M. MANONGSONG MERCEDES G. ASPI


ENGINEER II Engineer-III
Chief QAS Section
MIDR CONSTRUCTION & SUPPLIES

WORKSHEET FOR PLASTIC AND LIQUID LIMIT TESTS

Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Location: Baco, Oriental Mindoro
Contractor: MIDR CONSTRUCTION & SUPPLIES
Kind of Material : Embankment Spec's Item No. : 200(1)
Sampled at : Jobsite
Original Source : Tigkan River
Sampled By : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES 2/16/2023
Tested By : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES 2/16/2023
Computed By : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES 2/16/2023
==================================================================

Lab. No. RAB-LLPL-200(1)-01

LIQUID LIMIT PLASTIC LIMIT

Determination Number 1 2 3 4 1 2

Container Number A B C D E F

Container & Wet Soil, g 35.31 35.75 35.21 35.31 37.15 37.10

Container & Dry Soil, g 34.14 34.4 33.83 33.63 35.55 35.46

Moisture Loss, g 1.18 1.38 1.41 1.7 1.6 1.64

Container, g 29.80 29.60 29.70 28.90 27.40 26.40

Dry Soil, g 4.34 4.8 4.13 4.73 8.15 9.06

Moisture Content (%) 27 29 34 36 20 18

Number of Blows 32 27 15 10 19

FLOW CURVE

37 SIEVE ANALYSIS

36

35
Sieve Size % Passing
34
No. 10 36
M 33
No. 40 20
C 32
No. 200 7
% 31

30 Liquid Limit 29.5


29 Plastic Limit 19
28 Plasticity Index 11
27 Group Index 0
26 Group Class A-2-4

6 10 15 20 25 30 35 40 Remarks: SILTY OR CLAYEY


Number of Blows SAND & GRAVEL

Prepared / Tested By: Computed / Certified Correct: Noted By:


MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI
Materials Engineer ( Contractor ) Material Engineer (DPWH) Chief, QAS-MODEO
MIDR CONSTRUCTION & SUPPLIES
WORKSHEET FOR PLASTIC AND LIQUID LIMIT TESTS

Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Location: Baco, Oriental Mindoro
Contractor: MIDR CONSTRUCTION & SUPPLIES
Kind of Material : Embankment Spec's Item No. : 200(1)
Sampled at : Jobsite
Original Source : Tigkan River
Sampled By : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES 2/16/2023
Tested By : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES 2/16/2023
Computed By : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES 2/16/2023
=============================================================================================================

Lab. No. RAB-LLPL-200(1)-02

LIQUID LIMIT PLASTIC LIMIT

Determination Number 1 2 3 4 1 2
Container Number A B C D E F
Container & Wet Soil, g 35.35 35.79 35.25 35.37 37.15 37.11
Container & Dry Soil, g 34.19 34.45 33.87 33.65 35.55 35.47
Moisture Loss, g 1.18 1.38 1.41 1.7 1.6 1.64
Container, g 29.85 29.65 29.75 28.94 27.40 26.40
Dry Soil, g 4.34 4.8 4.13 4.73 8.15 9.06
Moisture Content (%) 27 29 34 36 20 18
Number of Blows 32 27 15 10 19
FLOW CURVE

37 SIEVE ANALYSIS

36

35
Sieve Size % Passing
34
No. 10 36
M 33
No. 40 20
C 32
No. 200 7
% 31

30 Liquid Limit 29.5

29 Plastic Limit 19

28 Plasticity Index 11

27 Group Index 0

26 Group Class A-2-4

6 10 15 20 25 30 35 40 Remarks: SILTY OR CLAYEY


Number of Blows SAND & GRAVEL

Prepared / Tested By: Computed / Certified Correct: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer ( Contractor ) Material Engineer (DPWH) Chief, QAS-MODEO
MIDR CONSTRUCTION & SUPPLIES
WORKSHEET FOR FIELD DENSITY TEST

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name) (Town /City/ Province)
KIND OF MATERIALS: Granular Materials
TEST HOLE: DEPTH: 0.150M. LOCATION :
(Location & Reference to Center Line)
REPRESENTING: 1st Layer 0.15 M. to ___________________.
(Layer No.) (Depth) (Station to Station) (Width)
TESTED BY: Contractor's Tech Contractor February 16, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor's Tech Contractor February 16, 2023
(Name and Designation) (Office) (Date)
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = == = = = = = = = = = = = = = = =
LAB. NUMBER: RAB-D-200-01

UNIT WEIGHT OF AIR-DRY SAND MASS OF SAND TO FILL FUNNEL


1. Container Full of Water, kg. 6.5 8. Mass of Jar + Sand, kg. 8.35
2. Container, kg. 2.25 9. Mass of Jar + Sand, kg. 6.76
3. Water, kg. (1) - (2) 4.250 10. Sand in Funnel, kg. (8) - (9) 1.59
4. Container, m3 (3)/ 1000 0.00425
5. Container filled with air
dry sand, kg. 8.70
6. Air-dry sand, kg. (5) - (2) 6.45
7. Unit weight of dry sand,
kg. /m3 (6- / (4) 1517.65
1 2 3
ACTUAL MOISTURE CONTENT
11. Container + Wet soil, g. 154.28 153.65 153.61 153.82 153.99 153.81
12. Container + Dry soil, g. 143.00 144.30 144.40 144.80 144.75 144.85
13. Moisture, g. (11) - (12) 11.28 9.35 9.21 9.02 9.24 8.96
14. Container, g. 18.50 18.50 18.50 18.50 18.50 18.50
15. Dry Soil, g. (12) - (14) 124.50 125.80 125.90 126.30 126.25 126.35
16. Actual Moisture Content (13)/(15)x100 9.06 7.43 7.32 7.14 7.32 7.09
17. Average actual moisture
Content, % 8.25 7.23 7.21
FIELD DENSITY TEST
18. Total matl. taken from hole, kg. 6.00 5.99 5.90
19. Mass of jar - Sand, kg. 9.960 9.980 9.990
20. Mass of jar+Sand,kg.(after pouring) 4.47 4.49 4.51
21. Sand to fill hole, kg. (19) - (20) - 10) 3.900 3.900 3.890
22. Volume of hole, m3 (21) / (7) 0.002570 0.002570 0.002563
23. Wet unit weight, kg. / m3 (18) / (22) 2334.84 2330.95 2301.83
24. Dry Unit Weight,kg.M3(23)/(1+(17)/100) 2156.97 2173.82 2147.13
25. Laboratory Compaction test data:
a) Maximum dry density, kg. /m3 2148 2148 2148
b) Optimum Moisture Content 9.00 9.00 9.00
26.Degree of Compaction(24)/(25 a)x100 100% 101% 100%

REMARKS / RECOMMENDATION: Passed.

PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
Chief, QAS MODEO
MIDR CONSTRUCTION & SUPPLIES
WORKSHEET FOR FIELD DENSITY TEST

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name) (Town /City/ Province)
KIND OF MATERIALS: Granular Materials
TEST HOLE: DEPTH: 0.150M. LOCATION :
(Location & Reference to Center Line)
REPRESENTING: 1st Layer 0.15 M. to ___________________.
(Layer No.) (Depth) (Station to Station) (Width)
TESTED BY: Contractor's Tech Contractor February 16, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor's Tech Contractor February 16, 2023
(Name and Designation) (Office) (Date)
================================================= ==============================
LAB. NUMBER: RAB-D-200-02

UNIT WEIGHT OF AIR-DRY SAND MASS OF SAND TO FILL FUNNEL


1. Container Full of Water, kg. 6.5 8. Mass of Jar + Sand, kg. 8.35
2. Container, kg. 2.25 9. Mass of Jar + Sand, kg. 6.76
3. Water, kg. (1) - (2) 4.250 10. Sand in Funnel, kg. (8) - (9) 1.59
4. Container, m3 (3)/ 1000 0.00425
5. Container filled with air
dry sand, kg. 8.70
6. Air-dry sand, kg. (5) - (2) 6.45
7. Unit weight of dry sand,
kg. /m3 (6- / (4) 1517.65
4 5 6
ACTUAL MOISTURE CONTENT
11. Container + Wet soil, g. 170.45 170.68 170.69 170.82 171.00 171.10
12. Container + Dry soil, g. 158.76 158.96 159.26 159.41 159.63 159.81
13. Moisture, g. (11) - (12) 11.69 11.72 11.43 11.41 11.37 11.29
14. Container, g. 15.25 15.25 15.30 15.35 15.37 15.52
15. Dry Soil, g. (12) - (14) 143.51 143.71 143.96 144.06 144.26 144.29
16. Actual Moisture Content (13)/(15)x100 8.15 8.16 7.94 7.92 7.88 7.82
17. Average actual moisture
Content, % 8.15 7.93 7.85
FIELD DENSITY TEST
18. Total matl. taken from hole, kg. 6.02 5.80 5.90
19. Mass of jar - Sand, kg. 10.000 9.980 9.950
20. Mass of jar+Sand,kg.(after pouring) 4.47 4.60 4.48
21. Sand to fill hole, kg. (19) - (20) - 10) 3.940 3.790 3.880
22. Volume of hole, m3 (21) / (7) 0.002596 0.002497 0.002557
23. Wet unit weight, kg. / m3 (18) / (22) 2318.84 2322.52 2307.76
24. Dry Unit Weight,kg.M3(23)/(1+(17)/100) 2144.09 2151.88 2139.73
25. Laboratory Compaction test data:
a) Maximum dry density, kg. /m3 2147.87353784361 2147.87353784361 2147.87353784361
b) Optimum Moisture Content 9.00 9.00 9.00
26.Degree of Compaction(24)/(25 a)x100 100% 100% 100%

REMARKS / RECOMMENDATION: Passed.

PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
Chief, QAS MODEO
MIDR CONSTRUCTION & SUPPLIES
WORKSHEET FOR FIELD DENSITY TEST

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name) (Town /City/ Province)
KIND OF MATERIALS: Granular Materials
TEST HOLE: DEPTH: 0.150M. LOCATION :
(Location & Reference to Center Line)
REPRESENTING: 1st Layer 0.15 M. to ___________________.
(Layer No.) (Depth) (Station to Station) (Width)
TESTED BY: Contractor's Tech Contractor February 16, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor's Tech Contractor February 16, 2023
(Name and Designation) (Office) (Date)
================================================= ==============================
LAB. NUMBER: RAB-D-200-03

UNIT WEIGHT OF AIR-DRY SAND MASS OF SAND TO FILL FUNNEL


1. Container Full of Water, kg. 6.5 8. Mass of Jar + Sand, kg. 8.35
2. Container, kg. 2.25 9. Mass of Jar + Sand, kg. 6.76
3. Water, kg. (1) - (2) 4.250 10. Sand in Funnel, kg. (8) - (9) 1.59
4. Container, m3 (3)/ 1000 0.00425
5. Container filled with air
dry sand, kg. 8.70
6. Air-dry sand, kg. (5) - (2) 6.45
7. Unit weight of dry sand,
kg. /m3 (6- / (4) 1517.65
7 8 9
ACTUAL MOISTURE CONTENT
11. Container + Wet soil, g. 170.88 171.23 170.88 171.38 171.68 170.85
12. Container + Dry soil, g. 160.10 160.80 160.50 160.87 160.35 160.12
13. Moisture, g. (11) - (12) 10.78 10.43 10.38 10.51 11.33 10.73
14. Container, g. 15.25 15.25 15.36 15.37 15.37 15.35
15. Dry Soil, g. (12) - (14) 144.85 145.55 145.14 145.50 144.98 144.77
16. Actual Moisture Content (13)/(15)x100 7.44 7.17 7.15 7.22 7.81 7.41
17. Average actual moisture
Content, % 7.30 7.19 7.61
FIELD DENSITY TEST
18. Total matl. taken from hole, kg. 6.02 5.70 5.85
19. Mass of jar - Sand, kg. 10.060 10.030 10.010
20. Mass of jar+Sand,kg.(after pouring) 4.49 4.68 4.61
21. Sand to fill hole, kg. (19) - (20) - 10) 3.980 3.760 3.810
22. Volume of hole, m3 (21) / (7) 0.002622 0.002478 0.002510
23. Wet unit weight, kg. / m3 (18) / (22) 2295.54 2300.69 2330.25
24. Dry Unit Weight,kg.M3(23)/(1+(17)/100) 2139.28 2146.41 2165.39
25. Laboratory Compaction test data:
a) Maximum dry density, kg. /m3 2147.87353784361 2147.87353784361 2147.87353784361
b) Optimum Moisture Content 9.00 9.00 9.00
26.Degree of Compaction(24)/(25 a)x100 100% 100% 101%

REMARKS / RECOMMENDATION: Passed.

PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
Chief, QAS MODEO
MIDR CONSTRUCTION & SUPPLIES
WORKSHEET FOR FIELD DENSITY TEST

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name) (Town /City/ Province)
KIND OF MATERIALS: Granular Materials
TEST HOLE: DEPTH: 0.150M. LOCATION :
(Location & Reference to Center Line)
REPRESENTING: 1st Layer 0.15 M. to ___________________.
(Layer No.) (Depth) (Station to Station) (Width)
TESTED BY: Contractor's Tech Contractor February 20, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor's Tech Contractor February 20, 2023
(Name and Designation) (Office) (Date)
================================================= ==============================
LAB. NUMBER: RAB-D-200-04

UNIT WEIGHT OF AIR-DRY SAND MASS OF SAND TO FILL FUNNEL


1. Container Full of Water, kg. 6.5 8. Mass of Jar + Sand, kg. 8.35
2. Container, kg. 2.25 9. Mass of Jar + Sand, kg. 6.76
3. Water, kg. (1) - (2) 4.250 10. Sand in Funnel, kg. (8) - (9) 1.59
4. Container, m3 (3)/ 1000 0.00425
5. Container filled with air
dry sand, kg. 8.70
6. Air-dry sand, kg. (5) - (2) 6.45
7. Unit weight of dry sand,
kg. /m3 (6- / (4) 1517.65
10 11 12
ACTUAL MOISTURE CONTENT
11. Container + Wet soil, g. 171.14 170.69 170.88 171.38 171.68 170.85
12. Container + Dry soil, g. 159.35 160.00 160.50 160.87 160.35 160.12
13. Moisture, g. (11) - (12) 11.79 10.69 10.38 10.51 11.33 10.73
14. Container, g. 15.25 15.36 15.36 15.37 15.37 15.35
15. Dry Soil, g. (12) - (14) 144.10 144.64 145.14 145.50 144.98 144.77
16. Actual Moisture Content (13)/(15)x100 8.18 7.39 7.15 7.22 7.81 7.41
17. Average actual moisture
Content, % 7.79 7.19 7.61
FIELD DENSITY TEST
18. Total matl. taken from hole, kg. 5.95 5.70 5.85
19. Mass of jar - Sand, kg. 9.970 10.030 10.010
20. Mass of jar+Sand,kg.(after pouring) 4.47 4.68 4.61
21. Sand to fill hole, kg. (19) - (20) - 10) 3.910 3.760 3.810
22. Volume of hole, m3 (21) / (7) 0.002576 0.002478 0.002510
23. Wet unit weight, kg. / m3 (18) / (22) 2309.46 2300.69 2330.25
24. Dry Unit Weight,kg.M3(23)/(1+(17)/100) 2142.63 2146.41 2165.39
25. Laboratory Compaction test data:
a) Maximum dry density, kg. /m3 2147.87353784361 2147.87353784361 2147.87353784361
b) Optimum Moisture Content 9.00 9.00 9.00
26.Degree of Compaction(24)/(25 a)x100 100% 100% 101%

REMARKS / RECOMMENDATION: Passed.

PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
Chief, QAS MODEO
MIDR CONSTRUCTION & SUPPLIES
WORKSHEET FOR FIELD DENSITY TEST

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name) (Town /City/ Province)
KIND OF MATERIALS: Granular Materials
TEST HOLE: DEPTH: 0.150M. LOCATION :
(Location & Reference to Center Line)
REPRESENTING: 1st Layer 0.15 M. to ___________________.
(Layer No.) (Depth) (Station to Station) (Width)
TESTED BY: Contractor's Tech Contractor February 20, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor's Tech Contractor February 20, 2023
(Name and Designation) (Office) (Date)
================================================= ==============================
LAB. NUMBER: RAB-D-200-05

UNIT WEIGHT OF AIR-DRY SAND MASS OF SAND TO FILL FUNNEL


1. Container Full of Water, kg. 6.5 8. Mass of Jar + Sand, kg. 8.35
2. Container, kg. 2.25 9. Mass of Jar + Sand, kg. 6.76
3. Water, kg. (1) - (2) 4.250 10. Sand in Funnel, kg. (8) - (9) 1.59
4. Container, m3 (3)/ 1000 0.00425
5. Container filled with air
dry sand, kg. 8.70
6. Air-dry sand, kg. (5) - (2) 6.45
7. Unit weight of dry sand,
kg. /m3 (6- / (4) 1517.65
13 14 15
ACTUAL MOISTURE CONTENT
11. Container + Wet soil, g. 171.58 171.68 171.68 171.20 172.15 170.88
12. Container + Dry soil, g. 159.65 160.12 158.62 160.28 160.27 160.32
13. Moisture, g. (11) - (12) 11.93 11.56 13.06 10.92 11.88 10.56
14. Container, g. 15.30 15.25 15.37 15.35 15.25 15.56
15. Dry Soil, g. (12) - (14) 144.35 144.87 143.25 144.93 145.02 144.76
16. Actual Moisture Content (13)/(15)x100 8.26 7.98 9.12 7.53 8.19 7.29
17. Average actual moisture
Content, % 8.12 8.33 7.74
FIELD DENSITY TEST
18. Total matl. taken from hole, kg. 5.70 5.99 6.10
19. Mass of jar - Sand, kg. 10.010 9.980 10.040
20. Mass of jar+Sand,kg.(after pouring) 4.68 4.47 4.46
21. Sand to fill hole, kg. (19) - (20) - 10) 3.740 3.920 3.990
22. Volume of hole, m3 (21) / (7) 0.002464 0.002583 0.002629
23. Wet unit weight, kg. / m3 (18) / (22) 2312.99 2319.06 2320.21
24. Dry Unit Weight,kg.M3(23)/(1+(17)/100) 2139.24 2140.82 2153.46
25. Laboratory Compaction test data:
a) Maximum dry density, kg. /m3 2147.87353784361 2147.87353784361 2147.87353784361
b) Optimum Moisture Content 9.00 9.00 9.00
26.Degree of Compaction(24)/(25 a)x100 100% 100% 100%

REMARKS / RECOMMENDATION: Passed.

PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer Engineer II Engineer III
Chief, QAS MODEO

MIDR CONSTRUCTION & SUPPLIES


WORKSHEET FOR FIELD DENSITY TEST

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name) (Town /City/ Province)
KIND OF MATERIALS: Granular Materials
TEST HOLE: DEPTH: 0.150M. LOCATION :
(Location & Reference to Center Line)
REPRESENTING: 1st Layer 0.15 M. to ___________________.
(Layer No.) (Depth) (Station to Station) (Width)
TESTED BY: Contractor's Tech Contractor February 20, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor's Tech Contractor February 20, 2023
(Name and Designation) (Office) (Date)
================================================= ==============================
LAB. NUMBER: RAB-D-200-06

UNIT WEIGHT OF AIR-DRY SAND MASS OF SAND TO FILL FUNNEL


1. Container Full of Water, kg. 6.5 8. Mass of Jar + Sand, kg. 8.35
2. Container, kg. 2.25 9. Mass of Jar + Sand, kg. 6.76
3. Water, kg. (1) - (2) 4.250 10. Sand in Funnel, kg. (8) - (9) 1.59
4. Container, m3 (3)/ 1000 0.00425
5. Container filled with air
dry sand, kg. 8.70
6. Air-dry sand, kg. (5) - (2) 6.45
7. Unit weight of dry sand,
kg. /m3 (6- / (4) 1517.65
16 17 18
ACTUAL MOISTURE CONTENT
11. Container + Wet soil, g. 170.88 171.40
12. Container + Dry soil, g. 159.36 159.85
13. Moisture, g. (11) - (12) 11.52 11.55
14. Container, g. 15.37 15.25
15. Dry Soil, g. (12) - (14) 143.99 144.60
16. Actual Moisture Content (13)/(15)x100 8.00 7.99
17. Average actual moisture
Content, % 7.99
FIELD DENSITY TEST
18. Total matl. taken from hole, kg. 6.12
19. Mass of jar - Sand, kg. 10.020
20. Mass of jar+Sand,kg.(after pouring) 4.47
21. Sand to fill hole, kg. (19) - (20) - 10) 3.960
22. Volume of hole, m3 (21) / (7) 0.002609
23. Wet unit weight, kg. / m3 (18) / (22) 2345.45
24. Dry Unit Weight,kg.M3(23)/(1+(17)/100) 2171.84
25. Laboratory Compaction test data:
a) Maximum dry density, kg. /m3 2147.87353784361
b) Optimum Moisture Content 9.00
26.Degree of Compaction(24)/(25 a)x100 101%

REMARKS / RECOMMENDATION: Passed.

PREPARED BY: CHECKED BY: SUBMITTED BY:


MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI
Materials Engineer Engineer II Engineer III
Chief, QAS MODEO
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

Lab. Report No. RSB(16) - 03 - 01 - 23


TEST REPORT ON REINFORCING STEEL Date February 27, 2022

Name of Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Kind of Materials : Reinforcing Steel Bar (16mmØ, deformed)
Sample Identification : RSB16mmD-1
Quantity Represented : 10, 000 kgs/sample
Sampled at : Stockpile
Original Source : Steel Asia
Supplied by : MIDR CONSTRUCTION & SUPPLIES
Proposed Use : Reinforcement
Spec's Item No. : AASHTO M 31, Grade 280 (40)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2022
(Name and Designation) (Office) (Date)
Submitted by : MARK IAN M. DELOS REYES MIDR CONSTRUCTION & SUPPLIES February 23, 2022
(Name and Designation) (Office) (Date Received)
Lab. No. RSB(16) - 03 - 01 - 23

TESTS REQUIREMENTS RESULTS

Tensile Properties:
Yield Point, Mpa 280 Min. 359.85
Tensile Strength, Mpa 420 Min. 541.62
Elongation, % 12 Min. 13.81

Bending Properties: No cracking on outside No cracking on outside


Degree bent, 180 degrees bent portion bent portion
Unit Mass, kg/m 1.552 1.488

Variation in mass, % -6.0 Max. under nominal mass 4.30 under nominal mass

Deformation, mm.
Spacing, average 11.10 Max. 10.76
Height, average 0.71 Min. 1.37
Gap 6.10 Max 4.27

Phosphorous Content 0.06 Max. 0.037

REMARKS: Sample meets specification on test performed.

Tested by: Checked by:


GRACE M. MANONGSONG
#VALUE!
MERCEDES G. ASPI
Chief, Quality Assurance Section
GRACE M. MANONGSONG
Engineer II
Attested by:

ERWIN D.G. UMALI


OIC-District Engineer
Date Tested: 27-February-2022
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

Lab. Report No. RSB (12) - 03 - 01 - 23


TEST REPORT ON REINFORCING STEEL Date February 27, 2022

Name of Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

Kind of Materials : Reinforcing Steel Bar (12mmØ, deformed)


Sample Identification : RSB12mmD-1
Quantity Represented : 10, 000 kgs/sample
Sampled at : Stockpile
Original Source : Steel Asia
Supplied by : MIDR CONSTRUCTION & SUPPLIES
Proposed Use : Reinforcement
Spec's Item No. : AASHTO M 31, Grade 280 (40)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2022
(Name and Designation) (Office) (Date)

Submitted by : MARK IAN M. DELOS REYES MIDR CONSTRUCTION & SUPPLIES February 23, 2022
(Name and Designation) (Office) (Date Received)

Lab. No. RSB (12) - 03 - 01 - 23


TESTS REQUIREMENTS RESULTS

Tensile Properties:
Yield Point, Mpa 280 Min. 385.00
Tensile Strength, Mpa 420 Min. 590.00
Elongation, % 12 Min. 16.95
Bending Properties: No cracking on outside No cracking on outside
Degree bent, 180 degrees bent portion bent portion
Unit Mass, kg/m 0.994 0.930
Variation in mass, % -6.0 Max. under nominal mass 6.88 under nominal mass
Deformation, mm.
Spacing, average 8.90 Max. 7.95
Height, average 0.51 Min. 0.81
Gap 4.90 Max. 4.15
Phosphorous Content 0.06 Max. 0.046

REMARKS:
Sample meets specification on test performed except on variation in mass requirement. It can still be used provided that the
spacing of rebar should be adjusted based from the evaluation/recommendation of the Chief, Planning and Design Section and
furnish copy of revised plans and design computations for reference and file.

Tested by: Checked by:

GRACE M. MANONGSONG
#VALUE!
MERCEDES G. ASPI
Chief, Quality Assurance Section
GRACE M. MANONGSONG
Engineer II
Attested by:

ERWIN D.G. UMALI


OIC - District Engineer
Date Tested: 27-February-2022
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

Lab. Report No. RSB (25) - 03 - 01 - 23


TEST REPORT ON REINFORCING STEEL Date February 27, 2022

Name of Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Kind of Materials : Reinforcing Steel Bar (25mmØ, deformed)
Sample Identification : RSB25mmD-1
Quantity Represented : 10, 000 kgs/sample
Sampled at : Stockpile
Original Source : Steel Asia
Supplied by : MIDR CONSTRUCTION & SUPPLIES
Proposed Use : Reinforcement
Spec's Item No. : AASHTO M 31, Grade 280 (40)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2022
(Name and Designation) (Office) (Date)
Submitted by : MARK IAN M. DELOS REYES MIDR CONSTRUCTION & SUPPLIES February 23, 2022
(Name and Designation) (Office) (Date Received)
Lab. No. RSB (25) - 03 - 01 - 23

TESTS REQUIREMENTS RESULTS

Tensile Properties:
Yield Point, Mpa 280 Min. 325.26
Tensile Strength, Mpa 420 Min. 516.32
Elongation, %

Bending Properties: No cracking on outside No cracking on outside


Degree bent, 180 degrees bent portion bent portion

Unit Mass, kg/m 3.973 3.788

Variation in mass, % -6.0 Max. under nominal mass 4.88 under nominal mass

Deformation, mm.
Spacing, average 17.8 Max.
Height, average 1.27 Min.
Gap 9.7 Max.

Phosphorous Content 0.06 Max.

REMARKS: Sample meets specification on test performed except on variation in mass requirement. It can still be used provided that the
spacing of rebar should be adjusted based from the evaluation/recommendation of the Chief, Planning and Design Section and
furnish copy of revised plans and design computations for reference and file.

Tested by: Checked by:

KEVIN E. GARCIA
Engineer II
MERCEDES G. ASPI
Chief, Quality Assurance Section
GRACE M. MANONGSONG
Engineer II
Attested by:

ERWIN D.G. UMALI


OIC - District Engineer
Date Tested: 27-February-2022
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

February 12, 2023


Lab. No.: I.R. - 01
Name of Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
Mindoro
Location: Baco, Oriental Mindoro
Construction of Field Office for the Engineer
Item No.: A.1.1(3) (Area = 4m x 3m) 0.12 L.S.

INSPECTION REPORT

This is to certify that the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

February 12, 2023


Lab. No.: I.R. - 02
Name of Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
Mindoro
Location: Baco, Oriental Mindoro
Provision of Furniture/Fixtures & Appliances
Item No.: A.1.1.(22) for the living Quarters for the Engineer 0.54 Each
(Rental Basis)

INSPECTION REPORT

This is to certify that the materials used in the aboved - mentioned project
were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

February 12, 2023


Lab. No.: I.R. - 03
Name of Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
Mindoro
Location: Baco, Oriental Mindoro

Provision of 4x2 Pick-up Type Service Vehicle


Item No.: A.1.2(4) 0.54 Months
for the Engineer on Bare Rental Basis

INSPECTION REPORT

This is to certify that the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

February 12, 2023

LAB. NUMBER : I.R. - 04


Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
PROJECT : Mindoro
LOCATION : Baco, Oriental Mindoro
Item No.: A.1.2(6) Operation and Maintenance of 4x2 Pick-up 0.54 Months
Type Service Vehicle for the Engineer

INSPECTION REPORT

This is to certify that the materials used in the aboved - mentioned project listed
hereunder were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

February 12, 2023


Lab. No.: I.R. - 05
Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
Name of Project:
Mindoro
Location: Baco, Oriental Mindoro
Item No.: B.5 Project Billboard/Signboard 2.00 ea

INSPECTION REPORT

This is to certify that the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Printed Tarpauline
b. Marine Plywood 1/4" thk
c. Cocolumber
d. CWN Assorted Sizes

CHECKED BY: CERTIFIED BY:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer

Republic of the Philippines


Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

February 12, 2023


Lab. No.: I.R. - 06
Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
Name of Project:
Mindoro
Location: Baco, Oriental Mindoro
Item No.: A.1.2(6) Occupational Safety & Health Program 0.54 L.S.

INSPECTION REPORT

This is to certify that the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

Materials Used:
a. Safety Shoes
b. Safety Helmet
c. Safety Gloves

CHECKED BY: CERTIFIED BY:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

February 12, 2023


LAB. NUMBER : I.R. - 07
Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
PROJECT : Mindoro
LOCATION : Baco, Oriental Mindoro
Item No.: B.8 (2) Traffic Management 0.12 L.S.

CERTIFICATION

This is to certify that the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

February 12, 2023


Lab. No.: I.R. - 08
Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
Name of Project: Mindoro
Location: Baco, Oriental Mindoro
Item No.: B.9 Mobilization/Demobilization 0.50 L.S.

INSPECTION REPORT

This is to certify that the equipment used in the aboved - mentioned project
were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:


GRACE M. MANONGSONG MARK LESTER B. CABRAL
Materials Engineer Project Engineer

Republic of the Philippines


Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

February 22, 2023


Lab. No.: I.R. - 09
Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
Name of Project: Mindoro
Location: Baco, Oriental Mindoro

506(1) Stone Masonry 409.99 cu.m.


Item No.:

INSPECTION REPORT

This is to certify that the materials used in the aboved - mentioned project listed
hereunder were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

506(1) a) Wheep Hole (3" PVC)


b) Filter Cloth
c) Boulders

CHECKED BY: CERTIFIED BY:


GRACE M. MANONGSONG MARK LESTER B. CABRAL
Materials Engineer Project Engineer

Republic of the Philippines


Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

February 23, 2023


Lab. No.: I.R. - 10
Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
Name of Project: Mindoro
Location: Baco, Oriental Mindoro
Structural Concrete Class B (18 Mpa) -
Item No.: 405 (2)
Wheel Guard
11.18 cu.m.

INSPECTION REPORT

This is to certify that the materials used in the aboved - mentioned project listed
hereunder were found to be in order abiding the required specification and contract
agreement.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

405(2)c a) Lumber, Good - 4 uses


b) Marine Plywood (1/2" x 4' x 8') 4 uses
c) Assorted CWN (1kg/100 bd-ft of Lumber)
CHECKED BY: CERTIFIED BY:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer

Republic of the Philippines


Department of Public Works and Highways
Region IV-B, MIMAROPA
Mindoro Oriental District Engineering Office
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

February 23, 2023


Lab. No.: IR - 11
Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
Name of Project: Mindoro
Location: Baco, Oriental Mindoro
Item No.: Portland Cement Concrete Pavement
311 (1)
(Unreinforced)
1,700.00 sq.m.

CERTIFICATION

This is to certify that the Water used for the Item 311(1)c1(l) PCCP
for the afformentioned project, was clean, hence no test is required.
This certification/inspection report is being issued upon for the absence of Quality Test
as per Quality Control Program for the said project.

CHECKED BY: CERTIFIED BY:

GRACE M. MANONGSONG MARK LESTER B. CABRAL


Materials Engineer Project Engineer
iental

L.S.
iental

Each
iental

Months
iental
iental
iental
iental
iental
iental
iental
iental
Item No. Description Unit QTY

A.1.1(3) Construction of Field Office for the Engineer (Area = 4m x 3m) 1.00 l.s.
Provision of Furniture/Fixtures & Appliances for the living Quarters
A.1.1.(22) 4.53 month
for the Engineer (Rental Basis)
Provision of 4x2 Pick-up Type Service Vehicle for the Engineer on Vehicle-
A.1.2(4) 4.53
Bare Rental Basis Month
Operation and Maintenance of 4x2 Pick-up Type Service Vehicle for Vehicle-
A.1.2(6) 4.53
the Engineer Month
B.5 Project Billboard/Signboard 2.00 each
B.7 (1) Occupational Safety & Health Program 4.53 Months
B.8 (2) Traffic Management 1.00 l.s.
B.9 Mobilization/Demobilization 1.00 l.s.
102(2) Surplus Common Roadway Excavation 3813.54 cu.m.
105 (1) a Subgrade Preparation,Common Material 949.60 sq.m.
200(1) Aggregate Subbase Course 2079.40 cu.m.
311 (1) b1 Portland Cement Concrete Pavement (Unreinforced) 0.20 m thick 6257.00 sq.m.
404 (1) a Reinforcing Steel, Grade 40 4199.35 kgs
405 (2) c Structural Concrete Class B (18 Mpa) - Wheel Guard 56.77 cu.m.
506 (1) Stone Masonry 1045.56 cu.m.

2/12/2023
136
Tuesday, June 27, 2023
FEBRUARY MARCH JUNE
12-15 16-22 23-28 1-7 8-15 16-21 22-31 1-7 8-15
0.12 0.12
0.54 0.135 0.135 0.135 0.135

0.54 0.135 0.135 0.135 0.135

0.54 0.135 0.135 0.135 0.135

2.00 2
0.54 0.135 0.135 0.135 0.135
0.12 0.03 0.03 0.03 0.03
0.50 0.03 0.03 0.03 0.03
1,635.57 817.785 817.785
364.60 182.30 182.30
506.01 253.01 253.01
1,700.00 850.00 850.00
577.20 192.40 192.40 192.40
11.18 5.59 5.59
409.99 205.00 205.00
JUNE JULY
16-21 22-30 1-7 8-15 16-21 22-27
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: February 24, 2023


LAB. NUMBER: RAB-TM-01
PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 4.5 Mpa
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES February 24, 2023
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH February 24, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH February 24, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
TM-A TRIAL MIX 3/11/2022 7 4.69 4.50
TM-B TRIAL MIX 3/11/2022 7 4.57 4.50
TM-C TRIAL MIX 3/11/2022 7 4.64 4.50
X-X-X-X

==================================================== ================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: February 28, 2022


LAB. NUMBER: RAB-FT-01
PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 405 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 20.68 Mpa
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES
(Name and Designation) (Office)
TESTED BY: QAS PERSONNEL DPWH August 15, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH August 15, 2022
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE COMPRESSIVE GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
TM-A TRIAL MIX 8/1/2022 14 20.89 20.68
TM-B TRIAL MIX 8/1/2022 14 20.99 20.68
TM-C TRIAL MIX 8/1/2022 14 20.87 20.68
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

ROBERT M. GONDA MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: April 22, 2023


LAB. NUMBER: RAB-FT-01
PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 4.5 Mpa
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES April 8, 2023
(Name and Designation) (Office)
TESTED BY: QAS PERSONNEL DPWH April 22, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH April 22, 2023
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
RS-FT-01-A 0+000.00 to 0+400.00 4/8/2023 14 4.73 4.50
RS-FT-01-B 0+000.00 to 0+400.00 4/8/2023 14 4.94 4.50
RS-FT-01-C 0+000.00 to 0+400.00 4/8/2023 14 4.82 4.50
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

ROBERT M. GONDA MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: August 16, 2022


LAB. NUMBER: BIN-FT-02
PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 4.5 Mpa
SAMPLED BY: Contractor's Personnel LINKS BUILDERS AND ENTERPRISES
(Name and Designation) (Office)
TESTED BY: QAS PERSONNEL DPWH August 16, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH August 16, 2022
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
RS-FT-03-A 0+150.00 - 0+300.00 8/2/2022 14 4.81 4.50
RS-FT-03-B 0+150.00 - 0+300.00 8/2/2022 14 4.92 4.50
RS-FT-03-C 0+150.00 - 0+300.00 8/2/2022 14 4.84 4.50
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

ROBERT M. GONDA MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: August 17, 2022


LAB. NUMBER: BIN-FT-03
Construction of Road, Sitio Binarilan, Canubing - Sityo Ilaya, Brgy. Malad, Calapan City,
PROJECT:
Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 4.5 Mpa
SAMPLED BY: Contractor's Personnel LINKS BUILDERS AND ENTERPRISES August 3, 2022
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH August 17, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH August 17, 2022
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
RS-FT-04-A 0+300.00 0+450.00 8/3/2022 14 4.79 4.50
RS-FT-04-B 0+300.00 0+450.00 8/3/2022 14 4.58 4.50
RS-FT-04-C 0+300.00 0+450.00 8/3/2022 14 4.65 4.50
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

ROBERT M. GONDA MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: August 18, 2022


LAB. NUMBER: BIN-FT-04
Construction of Road, Sitio Binarilan, Canubing - Sityo Ilaya, Brgy. Malad, Calapan City,
PROJECT:
Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 4.5 Mpa
SAMPLED BY: Contractor's Personnel LINKS BUILDERS AND ENTERPRISES August 4, 2022
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH August 18, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH August 18, 2022
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
RS-FT-06-A 0+450.00 - 0+600.00 8/4/2022 14 4.69 4.50
RS-FT-06-B 0+450.00 - 0+600.00 8/4/2022 14 4.75 4.50
RS-FT-06-C 0+450.00 - 0+600.00 8/4/2022 14 4.92 4.50
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

ROBERT M. GONDA MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: September 30, 2022


LAB. NUMBER: BIN-FT-05
Construction of Road, Sitio Binarilan, Canubing - Sityo Ilaya, Brgy. Malad, Calapan City,
PROJECT:
Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 4.5 Mpa
SAMPLED BY: Contractor's Personnel LINKS BUILDERS AND ENTERPRISES September 16, 2022
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH September 30, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH September 30, 2022
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
RS-FT-05-A 0+600.00 - 0+750.00 9/16/2022 14 4.95 4.50
RS-FT-05-B 0+600.00 - 0+750.00 9/16/2022 14 4.83 4.50
RS-FT-05-C 0+600.00 - 0+750.00 9/16/2022 14 4.70 4.50
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: October 1, 2022


LAB. NUMBER: BIN-FT-06
Construction of Road, Sitio Binarilan, Canubing - Sityo Ilaya, Brgy. Malad, Calapan City,
PROJECT:
Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 4.5 Mpa
SAMPLED BY: Contractor's Personnel LINKS BUILDERS AND ENTERPRISES September 17, 2022
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH October 1, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH October 1, 2022
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
RS-FT-06-A 0+750.00 - 0+900.00 9/17/2022 14 4.92 4.50
RS-FT-06-B 0+750.00 - 0+900.00 9/17/2022 14 4.85 4.50
RS-FT-06-C 0+750.00 - 0+900.00 9/17/2022 14 4.73 4.50
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: October 2, 2022


LAB. NUMBER: BIN-FT-07
Construction of Road, Sitio Binarilan, Canubing - Sityo Ilaya, Brgy. Malad, Calapan City,
PROJECT:
Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 4.5 Mpa
SAMPLED BY: Contractor's Personnel LINKS BUILDERS AND ENTERPRISES September 18, 2022
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH October 2, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH October 2, 2022
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
RS-FT-07-A 0+900.00 - 0+126.00 9/18/2022 14 4.94 4.50
RS-FT-07-B 0+900.00 - 0+126.00 9/18/2022 14 4.88 4.50
RS-FT-07-C 0+900.00 - 0+126.00 9/18/2022 14 4.76 4.50
X-X-X-X R/S L/S

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: October 7, 2022


LAB. NUMBER: BIN-FT-08
Construction of Road, Sitio Binarilan, Canubing - Sityo Ilaya, Brgy. Malad, Calapan City,
PROJECT:
Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 4.5 Mpa
SAMPLED BY: Contractor's Personnel LINKS BUILDERS AND ENTERPRISES September 23, 2022
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH October 7, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH October 7, 2022
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
RS-FT-08-A 0+126.00 - 0+276.00 9/23/2022 14 4.95 4.50
RS-FT-08-B 0+126.00 - 0+276.00 9/23/2022 14 4.88 4.50
RS-FT-08-C 0+126.00 - 0+276.00 9/23/2022 14 4.76 4.50
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: October 8, 2022


LAB. NUMBER: BIN-FT-09
Construction of Road, Sitio Binarilan, Canubing - Sityo Ilaya, Brgy. Malad, Calapan City,
PROJECT:
Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 4.5 Mpa
SAMPLED BY: Contractor's Personnel LINKS BUILDERS AND ENTERPRISES September 24, 2022
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH October 8, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH October 8, 2022
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
RS-FT-09-A 0+276.00 - 0+426.00 9/24/2022 14 4.96 4.50
RS-FT-09-B 0+276.00 - 0+426.00 9/24/2022 14 4.88 4.50
RS-FT-09-C 0+276.00 - 0+426.00 9/24/2022 14 4.76 4.50
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: October 12, 2022


LAB. NUMBER: BIN-FT-10
Construction of Road, Sitio Binarilan, Canubing - Sityo Ilaya, Brgy. Malad, Calapan City,
PROJECT:
Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 4.5 Mpa
SAMPLED BY: Contractor's Personnel LINKS BUILDERS AND ENTERPRISES September 28, 2022
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH October 12, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH October 12, 2022
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
RS-FT-10-A 0+426.00 - 0+576.00 9/28/2022 14 4.95 4.50
RS-FT-10-B 0+426.00 - 0+576.00 9/28/2022 14 4.86 4.50
RS-FT-10-C 0+426.00 - 0+576.00 9/28/2022 14 4.76 4.50
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: October 13, 2022


LAB. NUMBER: BIN-FT-11
Construction of Road, Sitio Binarilan, Canubing - Sityo Ilaya, Brgy. Malad, Calapan City,
PROJECT:
Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 4.5 Mpa
SAMPLED BY: Contractor's Personnel LINKS BUILDERS AND ENTERPRISES September 29, 2022
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH October 13, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH October 13, 2022
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
RS-FT-11-A 0+576.00 - 0+726.00 9/29/2022 14 4.94 4.50
RS-FT-11-B 0+576.00 - 0+726.00 9/29/2022 14 4.87 4.50
RS-FT-11-C 0+576.00 - 0+726.00 9/29/2022 14 4.78 4.50
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR FLEXURAL/COMPRESSIVE TEST

Date: October 14, 2022


LAB. NUMBER: BIN-FT-12
Construction of Road, Sitio Binarilan, Canubing - Sityo Ilaya, Brgy. Malad, Calapan City,
PROJECT:
Oriental Mindoro
KIND OF SAMPLE: Conc. Beam Sample Spec,'s. Item Number: 311 Class : "A"
SOURCE OF MIXTURE : Jobsite DESIGN STR. IN 14 DAYS 4.5 Mpa
SAMPLED BY: Contractor's Personnel LINKS BUILDERS AND ENTERPRISES September 30, 2022
(Name and Designation) (Office) (Date)
TESTED BY: QAS PERSONNEL DPWH October 14, 2022
(Name and Designation) (Office) (Date)
COMPUTED BY: QAS PERSONNEL DPWH October 14, 2022
(Name and Designation) (Office) (Date)
SAMPLE PART OF STRUCTURE DATE AGE FLEXURAL GOVERNING
IDENTIFICATION STATION REPRESENTED SAMPLED IN DAYS STRENGTH SPECIFICATION
Mpa Mpa
RS-FT-12-A 0+726.00 - 0+924.00 9/30/2022 14 4.94 4.50
RS-FT-12-B 0+726.00 - 0+924.00 9/30/2022 14 4.88 4.50
RS-FT-12-C 0+726.00 - 0+924.00 9/30/2022 14 4.76 4.50
RS-FT-12-D 0+726.00 0+924.00 9/30/2022 14 4.82 4.50
RS-FT-12-E 0+726.00 0+924.00 9/30/2022 14 4.77 4.50
RS-FT-12-F 0+726.00 0+924.00 9/30/2022 14 4.90 4.50
X-X-X-X

======================================================
REMARKS:
This report gives the result of test for the sample performed by the
MQC personnel.

PREPARED BY: SUBMITTED BY:

CARLO C. MANALO MERCEDES G. ASPI


Engineer II Engineer III
WORKSHEET FOR DESIGN OF CONRETE

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Province)

DZEE Builders & Construction


PREPARED BY: MARK IAN M. DELOS REYES ME Supply
(Name) (Designation) (Office)
LAB. NUMBER: BANGKATAN BACO ROAD-DM-311-01
DATA FROM PRELIMINARY TESTS:
Fine Aggregates, Q-FA Coarse Aggregates, Q-CA
Manufactured/Natural : /X/ Natural Rounded /X/ Angular// Rounded
Finess Modulus 2.60 Maximum size, mm 19.00
Specific Gravity (SSD)_ 2.64 Abrasion Loss (%) 23.18
Moisture Content, % 2.87 Specific Gravity(SSD) 2.67
Absorption, % 0.43 Moisture Content, % 2.80
Unit, Wt. Kg./m3 (loose) __ 1577.72 Absorption, % 0.38
Type & Brand of Cement : Type 1 / Fortune Unit Wt., kg./m3 (loose) 1726.24
Admixture Brand _____ NONE___________________ Water Source Deepwell
====================================================
DESIGN SPECIFICATION REQUIREMENTS:
Class of Concrete "A" Cement Factor, bags/m3 ____9.00______ 9.10
Flexural Strength, PSI 3000 Slump, mm ____76.20_______________
100
Proportion of Cement Total Aggregates Parts by Weight:
Cement: 40 Total Agg. : _ 196.71
=============================================== ===
DESIGN MIX PER BAG OF CEMENT:
Absolute Volume of Concrete, m3, cement factor ________ _ 0.109890
Absolute Volume of 40 kg./bag of cement, m3 0.012698
Absolute Volume of Water, m3 ________________________ 0.023175
Absolute Volume of Water and Cement, m3__________________ 0.035873
Absolute Volume of Fine & Coarse Aggregates, m3 ________________ 0.074017
Absolute Volume of Fine Aggregates, % of Total Aggregates by absolute Volume:
Fine Aggregates: ______ 46.00 (From Table V)
Total Correction (%) ______ -1.96 (From Table of Adjustments)
Corrected Fine Aggregates_______________ 44.04
Absolute Volume of Fine Aggregates, m3 ___________ 0.032595
Absolute Volume of Coarse Aggregates, m3____ _____
0.041422

Materials Absolute Specific Unit wt. of Uncorrected Corrected


Volume m3 Gravity water kg/m3 Weights kg. Weight kg.
Cement 0.012698 3.15 1000 40.0 40
Fine Agg. 0.032595 2.64 1000 86.20 88.31
Coarse Agg. 0.041422 2.67 1000 110.50 113.18
Water 0.023175 1.00 1000 23.18 18.39
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = == = = = = = =
PREPARED BY: CHECKED BY: SUBMITTED BY:
WILBERT MCKINLY NOCHE ROCKY TOM BERNARD S. ROMASANTA MERCEDES G. ASPI
Materials Engineer Materials Engineer Engineer III

WORKSHEET FOR DESIGN OF CONRETE


PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Province)

WORKSHEET FOR DESIGN OF CONRETE

PROJECT: 0
(Number) (Name) (City/Province)

PREPARED BY: #REF! ME Green Artic Builders


(Name) (Designation) (Office)
LAB. NUMBER: MALBOG.BR-DM-405-01
DATA FROM PRELIMINARY TESTS:

Fine Aggregates, Q-FA Coarse Aggregates, Q-CA


Manufactured/Natural : /X/ Natural Rounded /X/ Angular// Rounded
Finess Modulus 2.45 Maximum size, mm 19.00
Specific Gravity (SSD)_ 2.88 Abrasion Loss (%) 0.00
Moisture Content, % 2.29 Specific Gravity(SSD) 0.00
Absorption, % 0.32 Moisture Content, % #REF!
Unit, Wt. Kg./m3 (loose) __ 1478.71 Absorption, % #REF!
Type & Brand of Cement : Type 1 / Fortune Unit Wt., kg./m3 (loose) 0.00
Admixture Brand _____ NONE___________________ Water Source Deepwell
====================================================
DESIGN SPECIFICATION REQUIREMENTS:
Class of Concrete "A" Cement Factor, bags/m3 ____9.00______9.50
Flexural Strength, PSI 3000 Slump, mm ____76.20_______________
100
Proportion of Cement Total Aggregates Parts by Weight:
Cement: 40 Total Agg. : _ 86.22
=============================================== ===
DESIGN MIX PER BAG OF CEMENT:
Absolute Volume of Concrete, m3, cement factor ________ _ 0.105263
Absolute Volume of 40 kg./bag of cement, m3 0.012698
Absolute Volume of Water, m3 ________________________ 0.021888
Absolute Volume of Water and Cement, m3__________________ 0.034586
Absolute Volume of Fine & Coarse Aggregates, m3 ________________ 0.070677
Absolute Volume of Fine Aggregates, % of Total Aggregates by absolute Volume:
Fine Aggregates: ______ 46.00 (From Table V)
Total Correction (%) ______ -3.68 (From Table of Adjustments)
Corrected Fine Aggregates_______________ 42.32
Absolute Volume of Fine Aggregates, m3 ___________ 0.029908
Absolute Volume of Coarse Aggregates, m3____ _____
0.040770

Materials Absolute Specific Unit wt. of Uncorrected Corrected


Volume m3 Gravity water kg/m3 Weights kg. Weight kg.
Cement 0.012698 3.15 1000 40.0 40
Fine Agg. 0.029908 2.88 1000 86.22 87.91
Coarse Agg. 0.040770 0.00 1000 0.00 #REF!
Water 0.021888 1.00 1000 21.89 #REF!
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = == = = = = = =
PREPARED BY: CHECKED BY: SUBMITTED BY:

#REF! ROBERT M. GONDA MERCEDES G. ASPI


Materials Engineer Materials Engineer Engineer III

WORKSHEET FOR DESIGN OF CONRETE

PROJECT: 0
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

Lab. Report No. Q-FA-01


Date : April 11, 2022

TEST REPORT ON CONCRETE AGGREGATE

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Kind of Material : Fine Aggregate
Sample Identification : TAGUMPAY POLA MPB-FA-01
Quantity Represented : 1500 cu.m.
Sample at : Jobsite Stockpile
Original Source : Tigkan River
Supplied by : #REF!
Proposed Use : Concrete works
Spec's Item No. : 900
Sampled by : Contractor's Tech. #REF! April 4, 2022
(Name and Designation) (Office) (Date)
Submitted by : Quality Assurance Personnel DPWH-MODEO April 11, 2022
(Name and Designation) (Office) (Date Received)

Lab. No. Q-FA-01


TESTS REQUIREMENTS RESULTS
Sieve Analysis : Cumulative % passing Grading Grading
Sieve Size, mm (Grading 'A") Item 311,405,500 Item 311,405,500
9.50 mm ( 3/8" ) 100 #VALUE!
4.75 mm ( No. 4 ) 95 - 100 #REF!
2.36 mm ( No. 8 ) - #REF!
1.18 mm ( No. 16 ) 45 - 80 #REF!
0.600 mm ( No. 30 ) - #REF!
0.300 mm ( No. 50 ) 5 - 30 #REF!
0.150 mm ( No. 100 ) 0 - 10 #REF!
0.075 mm ( No. 200 ) 3 max #REF!
Fineness Modulus #REF!
Moisture Content #REF!
Bulk Specific Gravity #REF!
Absorption, % #REF!
Absorption,
Clay Lumps,%% 1 max #REF!
Soundness (Na4SO4), % Loss 10 max. #REF!
Organic Impurities (Colorimatic Test) Equal or Lighter than standard Lighter color
Dry Unit Mass, kg/m3
Loose #REF!
Rodded #REF!
REMARKS
Passed gov't. spec's.!

Tested by : Certified Correct:

MA. VIVIENE M. TOLENTINO ROCKY TOM BERNARD S. ROMASANTA


Laboratory Technician I Engineer II
Checked by: Attested by:

KEVIN E. GARCIA MERCEDES G. ASPI


Engineer II Chief, Quality Assurance Section
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

Lab. Report No. Q-CA-01


Date : April 11, 2022

TEST REPORT ON CONCRETE AGGREGATE

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Kind of Material : Coarse Aggregate
Sample Identification : TAGUMPAY POLA MPB-CA-01
Quantity Represented : 1500 cu.m.
Sample at : Jobsite Stockpile
Original Source : Tigkan River
Supplied by : #REF!
Proposed Use : Concrete works
Spec's Item No. : 900
Sampled by : Contractor's Tech. #REF! April 4, 2022
(Name and Designation) (Office) (Date)
Submitted by : Quality Assurance Personnel DPWH-MODEO April 11, 2022
(Name and Designation) (Office) (Date Received)

Lab. No. Q-CA-01


TESTS REQUIREMENTS RESULTS
Sieve Analysis : Cumulative % passing Grading Grading
Sieve Size, mm (Grading 'A") Item 311,405,500 Item 311,405,500
63.00 mm ( 21/2" )
50.00 mm ( 2" )
37.50 mm ( 11/2" ) 100
25.00 mm ( 1" ) 95-100 #REF!
19.00 mm ( 3/4" ) - #REF!
12.50 mm ( 1/2" ) 25-60 #REF!
9.50 mm ( 3/8" ) - #REF!
4.75 mm ( No. 4 ) 0-10 #REF!
0.075 mm ( No. 200 ) 1 max. #REF!
Moisture Content #REF!
Abrasion Loss (LAM), % 40 max. #REF!
Fractured Face, % - -
Bulk Specific Gravity #REF!
Absorption, % #REF!
Clay Lumps, % 0.25 max. #REF!
Soundness (Na2SO4), % Loss 12 max. #REF!
Dry Unit Mass, kg/m3
Loose #REF!
Rodded #REF!
REMARKS
Passed gov't. spec's.!

Tested by : Certified Correct:

MA. VIVIENE M. TOLENTINO ROCKY TOM BERNARD S. ROMASANTA


Laboratory Technician I Engineer II
Checked by: Attested by:

KEVIN E. GARCIA MERCEDES G. ASPI


Engineer II Chief, Quality Assurance Section
Q-FA-01
April 11, 2022

POL.MUNBLDG-FA-01
Construction / Improvement of Pola Municipal Building, Pola, Oriental Mindoro
#REF!

#REF!

April 4, 2022
(Date)
April 11, 2022 April 18, 2022
(Date Received)

ESULTS
Grading

VALUE!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
ghter color

#REF!
#REF!
MASANTA

ection

Q-CA-01
April 11, 2022

#REF!

April 4, 2022
(Date)
April 11, 2022
(Date Received)

ESULTS
Grading

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!

MASANTA

ection
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR QUALITY TEST

Date: March 1, 2023

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Town/ Province)
KIND OF MATERIALS: Fine Aggregates .
SAMPLE IDENTIFICATION: RAG-CA QUANTITY REP. 1,500.00 cu.m.
SAMPLED AT: Jobsite
ORIGINAL SOURCE: Tigkan River
PROPOSED USED: Conc. Works SPEC'S ITEM No.: 506(1) b
SAMPLED BY: MQC Personnel MQC-DPWH February 22, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor"s Personnel MQC-DPWH March 1, 2023
(Name and Designation) (Office) (Date)
=============================================================
---------------------------------------------------------------------------------
LAB. NUMBER: RAB-506-QTFA-01
SIEVE ANALYSIS:
50.00 MM 37.50 MM 25.00 MM 19.00 MM 12.50 MM 9.50 MM 4.75 MM
SIEVE SIZE 2" 1 1/2" 1" 3/4" 1/2" 3/8" No. 4
REQUIREMENTS 95-100 35-70 10-30 - 0-5
RESULTS 96 86 55 30 14 4 2

==========================================================
TESTS Materials Abrasion Fractured Specific Absorption Priable
0.075 mm Loss, % Face Gravity Percentage Particles
REQUIREMENTS 0-3 40 max. - - - -
RESULTS 2.00 0.00 2.79 0.394 NT

==============================================================

TESTS Soundness Organic Clay Dry Unit Wt.,Kg/m3 Mortar


Na SO4 Loss Impurities Lumps Loose Rodded Strength
REQUIREMENTS 12% max. - - -
RESULTS 7.457% 1648.59 1795.99 NT

REMARKS : Materials tested passed and meet specification requirements.

CHECKED BY: SUBMITTED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
WORKSHEET FOR DESIGN OF CONRETE

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Province)

PREPARED BY: MARK IAN M. DELOS REYES ME MIDR CONSTRUCTION & SUPPLIES
(Name) (Designation) (Office)
LAB. NUMBER: RAB-DM-405(2)-01
DATA FROM PRELIMINARY TESTS:
Fine Aggregates, Q-FA Coarse Aggregates, Q-CA
Manufactured/Natural : /X/ Natural Rounded // Angular/X / Rounded
Finess Modulus 2.99 Maximum size, mm 18.00
Specific Gravity (SSD)_ 2.68 Abrasion Loss (%) 22
Moisture Content, % 2.19 Specific Gravity(SSD) 2.68
Absorption, % 0.82 Moisture Content, % 2.06
Unit, Wt. Kg./m3 (loose) __ 1548.51 Absorption, % 0.96
Type & Brand of Cement : Type 1 / Fortune Unit Wt., kg./m3 (loose) 1562.87
Admixture Brand _____ NONE___________________ Water Source Deepwell
==================================================== =====================
DESIGN SPECIFICATION REQUIREMENTS:
Class of Concrete "A" Cement Factor, bags/m3 ____9.00______ 9.10
Compressive Strength, MPA 4.5 Slump, mm ____76.20_______________
100
Proportion of Cement Total Aggregates Parts by Weight:
Cement: 40 Total Agg. : _ 209.20
=============================================== === =====================
DESIGN MIX PER BAG OF CEMENT:
Absolute Volume of Concrete, m3, cement factor ________ _ 0.109890
Absolute Volume of 40 kg./bag of cement, m3 0.012698
Absolute Volume of Water, m3 ________________________ 0.019949
Absolute Volume of Water and Cement, m3__________________ 0.032647
Absolute Volume of Fine & Coarse Aggregates, m3 ________________ 0.077243
Absolute Volume of Fine Aggregates, % of Total Aggregates by absolute Volume:
Fine Aggregates: ______ 46.00 (From Table V)
Total Correction (%) ______ 0.00 (From Table of Adjustments)
Corrected Fine Aggregates_______________ 46.00
Absolute Volume of Fine Aggregates, m3 ___________ 0.035532
Absolute Volume of Coarse Aggregates, m3____ _____
0.041711

Materials Absolute Specific Unit wt. of Uncorrected Corrected


Volume m3 Gravity water kg/m3 Weights kg. Weight kg.
Cement 0.012698 3.15 1000 40.0 40
Fine Agg. 0.035532 2.68 1000 95.22 96.53
Coarse Agg. 0.041711 2.68 1000 111.79 113.02
Water 0.019949 1.00 1000 19.95 17.41
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = == = = = = = =
PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer Materials Engineer Engineer III
MIDR CONSTRUCTION & SUPPLIES DPWH-MODEO CHIEF, QAS-MODEO
WORKSHEET FOR DESIGN OF CONRETE

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Province)

PREPARED BY: MARK IAN M. DELOS REYES MTE Contractor


(Name) (Designation) (Office)
LAB. NUMBER: RAB-DM-405(2)-02
DATA FROM PRELIMINARY TESTS:
Fine Aggregates, Q-FA Coarse Aggregates, Q-CA
Manufactured/Natural : /X/ Natural Rounded // Angular/X / Rounded
Finess Modulus 10 Maximum size, mm 19.00
Specific Gravity (SSD)_ 2 Abrasion Loss (%) 0
Moisture Content, % 5 Specific Gravity(SSD) 0
Absorption, % 1 Moisture Content, % 2.06
Unit, Wt. Kg./m3 (loose) __ 2.68 Absorption, % 0
Type & Brand of Cement : Type 1 / Fortune Unit Wt., kg./m3 (loose) 0
Admixture Brand _____ NONE___________________ Water Source Deepwell
==================================================== =====================
DESIGN SPECIFICATION REQUIREMENTS:
Class of Concrete "A" Cement Factor, bags/m3 ____9.00______9.10
Compressive Strength, MPA 3000 Slump, mm ____76.20_______________
100
Proportion of Cement Total Aggregates Parts by Weight:
Cement: 40 Total Agg. : _ 209.20
=============================================== === =====================
DESIGN MIX PER BAG OF CEMENT:
Absolute Volume of Concrete, m3, cement factor ________ _ 0.109890
Absolute Volume of 40 kg./bag of cement, m3 0.012698
Absolute Volume of Water, m3 ________________________ 0.000000
Absolute Volume of Water and Cement, m3__________________ 0.012698
Absolute Volume of Fine & Coarse Aggregates, m3 ________________ 0.097192
Absolute Volume of Fine Aggregates, % of Total Aggregates by absolute Volume:
Fine Aggregates: ______ 46.00 (From Table V)
Total Correction (%) ______ 0.00 (From Table of Adjustments)
Corrected Fine Aggregates_______________ 46.00
Absolute Volume of Fine Aggregates, m3 ___________ 0.044708
Absolute Volume of Coarse Aggregates, m3____ _____
0.052484

Materials Absolute Specific Unit wt. of Uncorrected Corrected


Volume m3 Gravity water kg/m3 Weights kg. Weight kg.
Cement 0.012698 3.15 1000 40.0 40
Fine Agg. 0.044708 2.00 1000 89.42 92.99
Coarse Agg. 0.052484 0.00 1000 0.00 0.00
Water 0.000000 1.00 1000 0.00 -3.58
= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = == = = = = = =
PREPARED BY: CHECKED BY: SUBMITTED BY:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer Materials Engineer Engineer III
MIDR CONSTRUCTION & SUPPLIES DPWH-MODEO CHIEF, QAS-MODEO
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

Project Data Report

NAME OF PROJECT: 23ED0006 - Construction of Road, Sitio Rubia to Sta. Ana, Barangay
Bangkatan, Baco, Oriental Mindoro

FUND: GAA 2023

LOCATION / PROVINCE: Baco, Oriental Mindoro

CONTRACT AMOUNT: P 19,266,428.54

CONTRACTOR: MIDR CONSTRUCTION & SUPPLIES

EFF. OF CONTRACT: February 12, 2023

CONTRACT TIME: 136 Calendar Days

PREPARED BY: CHECKED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III

NOTED BY:

ERWIN DG. UMALI


OIC-District Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro
Lab. Report No: MODEO-RSB-1-17-22(12)
January 17, 2022

TEST REPORT ON REINFORCING STEEL

Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco,


Project : Oriental Mindoro
Kind of Material : Reinforcing Steel Bar (12mmØ, deformed)
Sample identification : NAUJAN STP-1-13-22-12MM
Quantity represented : 10,000 kgs/sample
Sampled at : Jobsite
Original Source :
Supplied by : MIDR CONSTRUCTION & SUPPLIES
Proposed use : Reinforcement
Governing Specification : AASHTO M 31
Sampled by : Contractor's Personnel Contractor January 13, 2022
(Name & designation) (Office) (Date)
Submitted by : Contractor's Personnel Contractor January 13, 2022
(Name & designation) (Office) (Date received)
Lab. No. : RSB-1-13-22(12)
TESTS REQUIREMENTS RESULTS
Tensile Properties
Yield Point, Mpa 280 Min. 420
Tensile Strength, Mpa 420 Min. 595
Elongation % 12 Min. 15.35
Bending Properties: No cracking on outside No cracking on outside
Degree bent, 180 degrees bent portion bent portion
Actual Unit Mass, kg/m 0.994 0.83
Variation in mass -6.0 Max under nominal mass -16.3 under nominal mass
Deformation, mm
Spacing, average 8.9 Max. 8.00
Height, average 0.51 Min. 3.20
Gap 4.9 Max. 2.80
REMARKS: Sample meets specification on test performed except on variation in mass
It can still be used provided that the spacing of rebar should be
adjusted based on the evaluation/recommendation of the Chief Designer
Tested by: Checked by:

KEVIN E. GARCIA
Engineer II

GARY F. QUINZON MERCEDES G. ASPI


Engineer I Chief, Quality Assurance Section
ATTESTED:

Witnessed by:

VICROSE JOSE D. DEMADARA ERWIN D.G. UMALI


Contractor's Representative OIC-District Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

Lab. Report No: MODEO-RSB-5-22-21(12)


May 22, 2021

TEST REPORT ON REINFORCING STEEL


Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
Project : Mindoro
Kind of Material : Reinforcing Steel Bar (12mmØ, deformed)
Sample identification : 3U-DRYER-OCCMIN-5-22-21-12MM
Quantity represented : 10,000 kgs/sample
Sampled at : Jobsite
Original Source :
Supplied by : AGRI COMPONENT CORPORATION AND AGRICOMP MACHINERIES AND CONSTRUCTION CORPORATION
Proposed use :Reinforcement
Governing Specification :AASHTO M 31
Sampled by :Contractor's Personnel Contractor May 22, 2021
(Name & designation) (Office) (Date)
Submitted by : Contractor's Personnel Contractor May 22, 2021
(Name & designation) (Office) (Date received)
Lab. No. : RSB-5-22-21(12)
TESTS REQUIREMENTS RESULTS
Tensile Properties
Yield Point, Mpa 280 Min. 400
Tensile Strength, Mpa 420 Min. 590
Elongation % 12 Min. 17.07
Bending Properties: No cracking on outside No cracking on outside
Degree bent, 180 degrees bent portion bent portion
Actual Unit Mass, kg/m 0.992 0.90
Variation in mass -6.0 Max under nominal mass -9.1 under nominal mass
Deformation, mm
Spacing, average 8.9 Max. 7.90
Height, average 0.51 Min. 0.83
Gap 4.9 Max. 4.10
Phospourous Content 0.06 Max 0.025
REMARKS: Sample meets specification on test performed except on variation in mass
It can still be used provided that the spacing of rebar should be
adjusted based on the evaluation/recommendation of the Chief Designer

Tested by: Checked by:

KEVIN E. GARCIA
Engineer II

REAH A. MONAKIL ALBIEN M. MAHIA


Engineer II Chief, Quality Assurance Section
ATTESTED:

Witnessed by:

BERNADETTE AILENE M. DIZON ERWIN D.G. UMALI


Contractor's Representative Caretaker-Office of the District Engineer
Calapan City, Oriental Mindoro

Lab. Report No: PSPC-7-1-20(12)


July 2, 2020

TEST REPORT ON REINFORCING STEEL


Project : 2019 FFSU Project PSPC Calapan Terminal
Kind of Material : Reinforcing Steel Bar (12mmØ, deformed)
Sample identification : PSPC-7-1-20-12MM
Quantity represented : 10,000 kgs/sample
Sampled at : Jobsite
Original Source :
Supplied by :METALITE BUILDERS DEVELOPMENT CORP. INC.
Proposed use :Reinforcement
Governing Specification :AASHTO M 31, Grade 420(60)
Sampled by :Contractor's Personnel Contractor July 1, 2020
(Name & designation) (Office) (Date)
Submitted by : Contractor's Personnel Contractor July 1, 2020
(Name & designation) (Office) (Date received)
Lab. No. : RSB-7-1-20(12)
TESTS REQUIREMENTS RESULTS
Tensile Properties
Yield Point, Mpa 420 Min. 500
Tensile Strength, Mpa 620 Min. 635
Elongation % 9 Min. 14.00
Bending Properties: No cracking on outside No cracking on outside
Degree bent, 180 degrees bent portion bent portion
Actual Unit Mass, kg/m 0.994 0.88
Variation in mass -6.0 Max under nominal mass -11.3 under nominal mass
Deformation, mm
Spacing, average 8.9 Max. 0.83
Height, average 0.51 Min. 0.18
Gap 4.9 Max. 0.33

REMARKS: Sample meets specification on test performed except on variation in mass and
height requirement. It can still be used provided that the spacing of rebar should be
adjusted based on the evaluation/recommendation of the Chief Designer

Tested by: Checked by:

KEVIN E. GARCIA
Engineer I
ALBIEN M. MAHIA
GARY F. QUINZON Chief, Quality Assurance Section
Engineer I ATTESTED:

Witnessed by:

Mark Bajaro - Contractor Representative


NESTOR L. DEL ROSARIO
District Engineer
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

Lab. Report No: MODEO-RSB-1-17-22(16)

TEST REPORT ON REINFORCING STEEL


Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental
Project : Mindoro
Kind of Material : Reinforcing Steel Bar (16mmØ, deformed)
Sample identification : RSB16mmD-1
Quantity represented : 10,000 kgs/sample
Sampled at : Stockpile
Original Source :
Supplied by :MIDR CONSTRUCTION & SUPPLIES
Proposed use :Reinforcement
Governing Specification :AASHTO M 31
Sampled by :Contractor's Personnel Contractor January 13, 2022
(Name & designation) (Office) (Date)
Submitted by : Contractor's Personnel Contractor January 13, 2022
(Name & designation) (Office) (Date received)
Lab. No. : RSB-1-13-22(16)
TESTS REQUIREMENTS
Tensile Properties
Yield Point, Mpa 280 Min.
Tensile Strength, Mpa 420 Min.
Elongation % 12 Min.
Bending Properties: No cracking on outside
Degree bent, 180 degrees bent portion
Actual Unit Mass, kg/m 1.552
Variation in mass -6.0 Max under nominal mass
Deformation, mm
Spacing, average 11.1 Max.
Height, average 0.71 Min.
Gap 6.1 Max.
REMARKS: Sample meets specification on test performed

Tested by: Checked by:

KEVIN E. GARCIA
Engineer II
GRACE M. MANONGSONG MERCEDES G. ASPI
Engineer I Chief, Quality Assurance Section
ATTESTED:

Witnessed by:

VICROSE JOSE D. DEMADARA ERWIN D.G. UMALI


Contractor's Representative OIC-District Engineer
ighways
INEER
ro

. Report No: MODEO-RSB-1-17-22(16)


January 17, 2022

a, Barangay Bangkatan, Baco, Oriental

tor January 13, 2022


) (Date)
tor January 13, 2022
) (Date received)

RESULTS

355
505
#DIV/0!
No cracking on outside
bent portion
#DIV/0!

10.50
3.40
3.60
MERCEDES G. ASPI
Quality Assurance Section

ERWIN D.G. UMALI


OIC-District Engineer
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR QUALITY TEST

Date: March 2, 2023

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Town/ Province)
KIND OF MATERIALS: Fine Aggregates .
SAMPLE IDENTIFICATION: RAB-311-CA QUANTITY REP. 1,500.00 cu.m.
SAMPLED AT: Jobsite
ORIGINAL SOURCE: Tigkan River
PROPOSED USED: Conc. Works SPEC'S ITEM No.: 311(1)f1
SAMPLED BY: MQC Personnel MQC-DPWH February 23, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor"s Personnel MQC-DPWH March 2, 2023
(Name and Designation) (Office) (Date)
=============================================================
---------------------------------------------------------------------------------
LAB. NUMBER: RAB-311-QTFA-01
SIEVE ANALYSIS:
50.00 MM 37.50 MM 25.00 MM 19.00 MM 12.50 MM 9.50 MM 4.75 MM
SIEVE SIZE 2" 1 1/2" 1" 3/4" 1/2" 3/8" No. 4
REQUIREMENTS 95-100 35-70 10-30 - 0-5
RESULTS 96 86 55 30 14 4 2

==========================================================
TESTS Materials Abrasion Fractured Specific Absorption Priable
0.075 mm Loss, % Face Gravity Percentage Particles
REQUIREMENTS 0-3 40 max. - - - -
RESULTS 2.00 0.00 2.79 0.394 NT

==============================================================

TESTS Soundness Organic Clay Dry Unit Wt.,Kg/m3 Mortar


Na SO4 Loss Impurities Lumps Loose Rodded Strength
REQUIREMENTS 12% max. - - -
RESULTS 7.457% 1648.59 1795.99 NT

REMARKS : Materials tested passed and meet specification requirements.

CHECKED BY: SUBMITTED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR QUALITY TEST

Date: March 6, 2023

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Town/ Province)
KIND OF MATERIALS: Coarse Aggregates .
SAMPLE IDENTIFICATION: RAB-FA QUANTITY REP. 1,500.00 cu.m.
SAMPLED AT: Jobsite
ORIGINAL SOURCE: Tigkan River
PROPOSED USED Conc. Works SPEC'S ITEM No.: 311 (1) f1
SAMPLED BY: MQC Personnel MQC-DPWH February 27, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Vivien M. Tolentino - L.T. I MQC-DPWH March 6, 2023
(Name and Designation) (Office) (Date)
========================================================
---------------------------------------------------------------------------------

LAB. NUMBER: RAB- 311-QTFA-01


SIEVE ANALYSIS:
9.5 MM 4.75 MM 2.0 MM 1.18 MM 0.600MM 0.300 MM 0.150 MM
SIEVE SIZE 3/8" No. 4 No. 10 No. 16 No. 30 No. 50 No. 100
REQUIREMENTS 100 95 - 100 - 45 - 80 - 5 - 30 0 - 10
RESULTS 100 96 65 49 22 7

====================================================
Materials Absorption Abrasion Fractured Specific Priable
TESTS 0.075 mm. Percentage Loss (LAM) Face Gravity Particles
No. 200
REQUIREMENTS 0-3 - - - -
RESULTS 3.00 0.71 - 2.70 N/T

Soundness Organic Fineness Dry Unit Weight Mortar


TESTS Na SO4 Impurrties Modulus Loose (LAM) Rodded Strength
Loss ( Kg./m3) (Kg./m3)
REQUIREMENTS 10% max. - - - - -
RESULTS 5.95% NT 2.72 1629.72 1726.42 NT

REMARKS : Materials tested passed and meet specification requirements.

CHECKED BY: SUBMITTED BY:


GRACE M. MANONGSONG MERCEDES G. ASPI
Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR QUALITY TEST

Date: March 2, 2023

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Town/ Province)
KIND OF MATERIALS: Fine Aggregates .
SAMPLE IDENTIFICATION: RAB-311-CA QUANTITY REP. 1,500.00 cu.m.
SAMPLED AT: Jobsite
ORIGINAL SOURCE: Tigkan River
PROPOSED USED: Conc. Works SPEC'S ITEM No.: 311-1
SAMPLED BY: MQC Personnel MQC-DPWH February 23, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Contractor"s Personnel MQC-DPWH March 2, 2023
(Name and Designation) (Office) (Date)
=============================================================
---------------------------------------------------------------------------------
LAB. NUMBER: RAB-311-QTFA-01
SIEVE ANALYSIS:
50.00 MM 37.50 MM 25.00 MM 19.00 MM 12.50 MM 9.50 MM 4.75 MM
SIEVE SIZE 2" 1 1/2" 1" 3/4" 1/2" 3/8" No. 4
REQUIREMENTS 95-100 35-70 10-30 - 0-5
RESULTS 96 86 55 30 14 4 2

==========================================================
TESTS Materials Abrasion Fractured Specific Absorption Priable
0.075 mm Loss, % Face Gravity Percentage Particles
REQUIREMENTS 0-3 40 max. - - - -
RESULTS 2.00 0.00 2.79 0.394 NT

==============================================================

TESTS Soundness Organic Clay Dry Unit Wt.,Kg/m3 Mortar


Na SO4 Loss Impurities Lumps Loose Rodded Strength
REQUIREMENTS 12% max. - - -
RESULTS 7.457% 1648.59 1795.99 NT

REMARKS : Materials tested passed and meet specification requirements.

CHECKED BY: SUBMITTED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Town/City/Province)
Kind of Materials : Fine Aggregates Specification Item No. : 311(1)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : Tigkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-311-FA-01 Original Weight in grams : 3491


Oven Dried Weight : 3416
Moisture Content, % : 2.20 Washed Ovendried Weight: 3412
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing % Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 3416 100 100
2" 50.0 mm 239 7 3177 93 90-100
1 1/2" 37.5 mm 1196 42 1981 58 35-70
1" 25.0 mm 1503 86 478 14 0-15
3/4" 19.0 mm 68 88 410 12 -
1/2" 12.5 mm 273 96 137 4 0-5
3/8" 9.5 mm 69 98 68 2 -
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 51 17 0.50 0-1
PAN 13
Wash Passing 200 4
TOTAL 3416

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Noted By:


GRACE M. MANONGSONG MERCEDES G. ASPI
Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Town/City/Province)
Kind of Materials : Fine Aggregates Specification Item No. : 311(1)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : TIgkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-311-FA-02 Original Weig 3506


Oven Dried Weight : 3434
Moisture Content, % : 2.10 Washed Ovendried Weight: 3428
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing % Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 3434 100 100
2" 50.0 mm 206 3228 94 90-100
1 1/2" 37.5 mm 1271 1957 57 35-70
1" 25.0 mm 1511 446 13 0-15
3/4" 19.0 mm 34 412 12
1/2" 12.5 mm 309 103 3 0-5
3/8" 9.5 mm 69 34 100
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 17 17 0.50 0-1
PAN 11
Wash Passing 200 6
TOTAL 3434

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer- Contractor Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Town/City/Province)
Kind of Materials : Coarse Aggregate Specification Item No. : 311(1)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : Tigkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-311-CA-01 Original Weight in grams : 3491


Oven Dried Weight : 3416
Moisture Content, % : 2.20 Washed Ovendried Weight: 3412
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing % Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 3416 100 100
2" 50.0 mm 239 7 3177 93 90-100
1 1/2" 37.5 mm 1196 42 1981 58 35-70
1" 25.0 mm 1503 86 478 14 0-15
3/4" 19.0 mm 68 88 410 12 -
1/2" 12.5 mm 273 96 137 4 0-5
3/8" 9.5 mm 69 98 68 2 -
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 51 17 0.50 0-1
PAN 13
Wash Passing 200 4
TOTAL 3416

Remarks/Recommendations: Sample meets grading specifications


Prepared by: Noted By:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Town/City/Province)
Kind of Materials : Coarse Aggregate Specification Item No. : 311(1)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : TIgkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-311-CA-02 Original Weig 3506


Oven Dried Weight : 3434
Moisture Content, % : 2.10 Washed Ovendried Weight: 3428
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing % Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 3434 100 100
2" 50.0 mm 206 3228 94 90-100
1 1/2" 37.5 mm 1271 1957 57 35-70
1" 25.0 mm 1511 446 13 0-15
3/4" 19.0 mm 34 412 12
1/2" 12.5 mm 309 103 3 0-5
3/8" 9.5 mm 69 34 1
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 17 17 0.50 0-1
PAN 11
Wash Passing 200 6
TOTAL 3434

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:


MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI
Materials Engineer- Contractor Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Town/City/Province)
Kind of Materials : Coarse Aggregate Specification Item No. : 311(1)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : TIgkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 23, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-311-CA-03 Original Weig 3506


Oven Dried Weight : 3434
Moisture Content, % : 2.10 Washed Ovendried Weight: 3428
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing % Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 3434 100 100
2" 50.0 mm 206 3228 94 90-100
1 1/2" 37.5 mm 1271 1957 57 35-70
1" 25.0 mm 1511 446 13 0-15
3/4" 19.0 mm 34 412 12
1/2" 12.5 mm 309 103 3 0-5
3/8" 9.5 mm 69 34 1
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 17 17 0.50 0-1
PAN 11
Wash Passing 200 6
TOTAL 3434

Remarks/Recommendations: Sample meets grading specifications


Prepared by: Checked by: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer- Contractor Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES

WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Town/City/Province)
Kind of Materials : Fine Aggregate Specification Item No. : 311(1)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : Tigkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. LINKS BUILDERS AND ENTERPRISES February 23, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. LINKS BUILDERS AND ENTERPRISES February 24, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. LINKS BUILDERS AND ENTERPRISES February 24, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-311-CA-04 Original Weight in grams : 3214


Oven Dried Weight : 3123
Moisture Content, % : 2.91 Washed Ovendried Weight: 3079
Fineness Modulus : 2.61

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing % Passing
3" 75.0 mm
2 1/2" 63.0 mm
2" 50.0 mm
1 1/2" 37.5 mm
1" 25.0 mm
3/4" 19.0 mm
1/2" 12.5 mm
3/8" 9.5 mm 0 3118 100 100
No. 4 4.75 mm 89 3 3029 97 95-100
No. 8 2.36 mm 281 12 2748 88
No. 10 2.00 mm - 2405 77
No. 16 1.18 mm 593 31 2155 69 45-80
No. 30 0.600 mm 500 47 1655 53
No. 40 0.425 mm - 1499 48
No. 50 0.300 mm 905 76 750 24 5-30
No. 100 0.150 mm 500 92 250 8 0-10
No. 200 0.075 mm 156 2.61 94 3 0-3
PAN 50
Wash Passing 200 44
TOTAL 3118

Remarks/Recommendations: Sample meets grading specifications


Prepared by: Checked by: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer- Contractor Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR QUALITY TEST

Date: March 6, 2023

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Town/ Province)
KIND OF MATERIALS: Coarse Aggregates .
SAMPLE IDENTIFICATION: RAB-FA QUANTITY REP. 1,500.00 cu.m.
SAMPLED AT: Jobsite
ORIGINAL SOURCE: Tigkan River
PROPOSED USED Conc. Works SPEC'S ITEM No.: 311 (1) b1 - f
SAMPLED BY: MQC Personnel MQC-DPWH February 27, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: Vivien M. Tolentino - L.T. I MQC-DPWH March 6, 2023
(Name and Designation) (Office) (Date)
========================================================
---------------------------------------------------------------------------------

LAB. NUMBER: RAB- 311-QTFA-01


SIEVE ANALYSIS:
9.5 MM 4.75 MM 2.0 MM 1.18 MM 0.600MM 0.300 MM 0.150 MM
SIEVE SIZE 3/8" No. 4 No. 10 No. 16 No. 30 No. 50 No. 100
REQUIREMENTS 100 95 - 100 - 45 - 80 - 5 - 30 0 - 10
RESULTS 100 96 65 49 22 7

====================================================
Materials Absorption Abrasion Fractured Specific Priable
TESTS 0.075 mm. Percentage Loss (LAM) Face Gravity Particles
No. 200
REQUIREMENTS 0-3 - - - -
RESULTS 3.00 0.71 - 2.70 N/T

Soundness Organic Fineness Dry Unit Weight Mortar


TESTS Na SO4 Impurrties Modulus Loose (LAM) Rodded Strength
Loss ( Kg./m3) (Kg./m3)
REQUIREMENTS 10% max. - - - - -
RESULTS 5.95% NT 2.72 1629.72 1726.42 NT

REMARKS : Materials tested passed and meet specification requirements.

CHECKED BY: SUBMITTED BY:


GRACE M. MANONGSONG MERCEDES G. ASPI
Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

RSB(12) - 03 - 01 - 23
TEST REPORT ON REINFORCING STEEL March 04, 2023

Name of Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Kind of Materials : Reinforcing Steel Bar (12mmØ, deformed)
Sample Identification : RSB12mmD-404-1
Quantity Represented : 10, 000 kgs/sample
Sampled at : Stockpile
Original Source : Steel Asia
Supplied by : MIDR CONSTRUCTION & SUPPLIES
Proposed Use : Reinforcement
Spec's Item No. : AASHTO M 31, Grade 280 (40)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 01, 2023
(Name and Designation) (Office) (Date)
Submitted by : MARK IAN M. DELOS REYES MIDR CONSTRUCTION & SUPPLIES -
(Name and Designation) (Office) (Date Received)

Lab. No. 0
TESTS REQUIREMENTS RESULTS

Tensile Properties:
Yield Point, Mpa 280 Min. 348.65
Tensile Strength, Mpa 420 Min. 521.35
Elongation, % 12 Min. 15.34
Bending Properties: No cracking on outside No cracking on outside
Degree bent, 180 degrees bent portion bent portion
Unit Mass, kg/m 0.994 0.954
Variation in mass, % -6.0 Max. under nominal mass 4.19 under nominal mass
Deformation, mm.
Spacing, average 8.90 Max. 7.86
Height, average 0.51 Min. 0.84
Gap 4.90 Max. 4.15
Phosphorous Content 0.06 Max. 0.044

REMARKS:
Sample meets specification on test performed except on variation in mass requirement. It can still be used provided that the
spacing of rebar should be adjusted based from the evaluation/recommendation of the Chief, Planning and Design Section and
furnish copy of revised plans and design computations for reference and file.

Tested by: Checked by:

GRACE M. MANONGSONG
#VALUE!
MERCEDES G. ASPI
Chief, Quality Assurance Section
GRACE M. MANONGSONG
Engineer II
Attested by:

ERWIN D.G. UMALI


OIC - District Engineer
Date Tested: 04-March-2023
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

Lab. Report No. MODEO- RSB-BANGKATAN (16)


TEST REPORT ON REINFORCING STEEL Date March 04, 2023

Name of Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Kind of Materials : Reinforcing Steel Bar (16mmØ, deformed)
Sample Identification : RSB16mmD-404-1
Quantity Represented : 10, 000 kgs/sample
Sampled at : Stockpile
Original Source : Steel Asia
Supplied by : MIDR CONSTRUCTION & SUPPLIES
Proposed Use : Reinforcement
Spec's Item No. : AASHTO M 31, Grade 280 (40)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 01, 2023
(Name and Designation) (Office) (Date)
Submitted by : MARK IAN M. DELOS REYES MIDR CONSTRUCTION & SUPPLIES -
(Name and Designation) (Office) (Date Received)
Lab. No. RSB-BANGKATAN (16)

TESTS REQUIREMENTS RESULTS

Tensile Properties:
Yield Point, Mpa 280 Min. 359.85
Tensile Strength, Mpa 420 Min. 541.62
Elongation, % 12 Min. 13.81

Bending Properties: No cracking on outside No cracking on outside


Degree bent, 180 degrees bent portion bent portion

Unit Mass, kg/m 1.552 1.488

Variation in mass, % -6.0 Max. under nominal mass 4.30 under nominal mass

Deformation, mm.
Spacing, average 11.10 Max. 10.76
Height, average 0.71 Min. 1.37
Gap 6.10 Max 4.27

Phosphorous Content 0.06 Max. 0.037

REMARKS: Sample meets specification on test performed.

Tested by: Checked by:

KEVIN E. GARCIA
Engineer II
MERCEDES G. ASPI
Chief, Quality Assurance Section
GRACE M. MANONGSONG
Engineer II
Attested by:

ERWIN D.G. UMALI


OIC-District Engineer
Date Tested: 04-March-2023
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

Lab. Report No. MODEO- RSB-BANGKATAN (10)


TEST REPORT ON REINFORCING STEEL Date March 04, 2023

Name of Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Kind of Materials : Reinforcing Steel Bar (28mmØ, deformed)
Sample Identification : RSB10mmD-404-1
Quantity Represented : 10, 000 kgs/sample
Sampled at : Stockpile
Original Source : Steel Asia
Supplied by : MIDR CONSTRUCTION & SUPPLIES
Proposed Use : Reinforcement
Spec's Item No. : AASHTO M 31, Grade 280 (40)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 01, 2023
(Name and Designation) (Office) (Date)
Submitted by : MARK IAN M. DELOS REYES MIDR CONSTRUCTION & SUPPLIES -
(Name and Designation) (Office) (Date Received)
Lab. No. RSB-BANGKATAN (10)

TESTS REQUIREMENTS RESULTS

Tensile Properties:
Yield Point, Mpa 280 Min. 325.26
Tensile Strength, Mpa 420 Min. 516.32
Elongation, % 11 Min. 13.24

Bending Properties: No cracking on outside No cracking on outside


Degree bent, 180 degrees bent portion bent portion

Unit Mass, kg/m 0.560 0.535

Variation in mass, % -6.0 Max. under nominal mass 4.67 under nominal mass

Deformation, mm.
Spacing, average 6.70 Max. 5.28
Height, average 0.38 Min. 0.45
Gap 3.60 Max. 3.10

Phosphorous Content 0.06 Max. 0.038

Sample meets specification on test performed except on variation in mass requirement. It can still be used provided that the
REMARKS: spacing of rebar should be adjusted based from the evaluation/recommendation of the Chief, Planning and Design Section
and furnish copy of revised plans and design computations for reference and file.

Tested by: Checked by:

KEVIN E. GARCIA
Engineer II
MERCEDES G. ASPI
Chief, Quality Assurance Section
GRACE M. MANONGSONG
Engineer II
Attested by:

ERWIN D.G. UMALI


OIC - District Engineer
Date Tested: 04-March-2023
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR QUALITY TEST

Date: March 1, 2023

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Town/ Province)
KIND OF MATERIALS: Fine Aggregates .
SAMPLE IDENTIFICATION: RAB-CA QUANTITY REP. 1,500.00 cu.m.
SAMPLED AT: Jobsite
ORIGINAL SOURCE: Tigkan River
PROPOSED USED: Conc. Works SPEC'S ITEM No.: 405 (2)
SAMPLED BY: MQC Personnel MQC-DPWH February 22, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: MARK IAN M. DELOS REYES MQC-DPWH March 1, 2023
(Name and Designation) (Office) (Date)
===================================================== ============================
---------------------------------------------------------------------------------
LAB. NUMBER: RAB-405-QTCA-01
SIEVE ANALYSIS:
50.00 MM 37.50 MM 25.00 MM 19.00 MM 12.50 MM 9.50 MM 4.75 MM
SIEVE SIZE 2" 1 1/2" 1" 3/4" 1/2" 3/8" No. 4
REQUIREMENTS 95-100 35-70 10-30 - 0-5
RESULTS 96 86 55 30 14 4 2

==========================================================
TESTS Materials Abrasion Fractured Specific Absorption Priable
0.075 mm Loss, % Face Gravity Percentage Particles
REQUIREMENTS 0-3 40 max. - - - -
RESULTS 2.00 0.00 2.79 0.394 NT

==============================================================

TESTS Soundness Organic Clay Dry Unit Wt.,Kg/m3 Mortar


Na SO4 Loss Impurities Lumps Loose Rodded Strength
REQUIREMENTS 12% max. - - -
RESULTS 7.457% 1648.59 1795.99 NT

REMARKS : Materials tested passed and meet specification requirements.

CHECKED BY: SUBMITTED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES
WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Town/City/Province)
Kind of Materials : Fine Aggregates Specification Item No. : 405(2)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : TIgkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 27, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 27, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 27, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-405-FA-01 Original Weig 3506


Oven Dried Weight : 3434
Moisture Content, % : 2.10 Washed Ovendried Weight: 3428
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram %
English Metric % Retained Weigth passing, gram % passing Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 3434 100 100
2" 50.0 mm 206 3228 94 90-100
1 1/2" 37.5 mm 1271 1957 57 35-70
1" 25.0 mm 1511 446 13 0-15
3/4" 19.0 mm 34 412 12
1/2" 12.5 mm 309 103 3 0-5
3/8" 9.5 mm 69 34 1
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 17 17 0.50 0-1
PAN 11
Wash Passing 200 6
TOTAL 3434

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer- Contractor Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES
WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Town/City/Province)
Kind of Materials : Coarse Aggregate Specification Item No. : 405(2)
Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : TIgkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 27, 2023
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 27, 2023
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES February 27, 2023
(Name & Designation) (Office) (Date)

Lab No. RAB-G-405-CA-01 Original Weight in grams : 3506


Oven Dried Weight : 3434
Moisture Content, % : 2.10 Washed Ovendried Weight: 3428
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram %
English Metric % Retained Weigth passing, gram % passing Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 3434 100 100
2" 50.0 mm 206 3228 94 90-100
1 1/2" 37.5 mm 1271 1957 57 35-70
1" 25.0 mm 1511 446 13 0-15
3/4" 19.0 mm 34 412 12
1/2" 12.5 mm 309 103 3 0-5
3/8" 9.5 mm 69 34 1
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 17 17 0.50 0-1
PAN 11
Wash Passing 200 6
TOTAL 3434

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer- Contractor Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR QUALITY TEST

Date: March 1, 2023

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Town/ Province)
KIND OF MATERIALS: Coarse Aggregates .
SAMPLE IDENTIFICATION: RAB-CA QUANTITY REP. 1,500.00 cu.m.
SAMPLED AT: Jobsite
ORIGINAL SOURCE: Tigkan River
PROPOSED USED: Conc. Works SPEC'S ITEM No.: 405 (2) c - f
SAMPLED BY: MQC Personnel MQC-DPWH February 22, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: MARK IAN M. DELOS REYES MQC-DPWH March 1, 2023
(Name and Designation) (Office) (Date)
========================================================
---------------------------------------------------------------------------------

LAB. NUMBER: RAB- 405-QTFA-01


SIEVE ANALYSIS:
9.5 MM 4.75 MM 2.0 MM 1.18 MM 0.600MM 0.300 MM 0.150 MM
SIEVE SIZE 3/8" No. 4 No. 10 No. 16 No. 30 No. 50 No. 100
REQUIREMENTS 100 95 - 100 - 45 - 80 - 5 - 30 0 - 10
RESULTS 100 96 65 49 22 7

====================================================
Materials Absorption Abrasion Fractured Specific Priable
TESTS 0.075 mm. Percentage Loss (LAM) Face Gravity Particles
No. 200
REQUIREMENTS 0-3 - - - -
RESULTS 3.00 0.71 - 2.70 N/T

Soundness Organic Fineness Dry Unit Weight Mortar


TESTS Na SO4 Impurrties Modulus Loose (LAM) Rodded Strength
Loss ( Kg./m3) (Kg./m3)
REQUIREMENTS 10% max. - - - - -
RESULTS 5.95% NT 2.72 1629.72 1726.42 NT

REMARKS : Materials tested passed and meet specification requirements.

CHECKED BY: SUBMITTED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR QUALITY TEST

Date: March 1, 2023

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Town/ Province)
KIND OF MATERIALS: Coarse Aggregates .
SAMPLE IDENTIFICATION: CBG-FMR-CA QUANTITY REP. 1,500.00 cu.m.
SAMPLED AT: Jobsite
ORIGINAL SOURCE: Tigkan River
PROPOSED USED: Conc. Works SPEC'S ITEM No.: 506(1) c
SAMPLED BY: MQC Personnel MQC-DPWH February 22, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: MARK IAN M. DELOS REYES MQC-DPWH March 1, 2023
(Name and Designation) (Office) (Date)
=============================================================
---------------------------------------------------------------------------------
LAB. NUMBER: RAB-506-QTCA-01
SIEVE ANALYSIS:
50.00 MM 37.50 MM 25.00 MM 19.00 MM 12.50 MM 9.50 MM 4.75 MM
SIEVE SIZE 2" 1 1/2" 1" 3/4" 1/2" 3/8" No. 4
REQUIREMENTS 95-100 35-70 10-30 - 0-5
RESULTS 96 86 55 30 14 4 2

==========================================================
TESTS Materials Abrasion Fractured Specific Absorption Priable
0.075 mm Loss, % Face Gravity Percentage Particles
REQUIREMENTS 0-3 40 max. - - - -
RESULTS 2.00 0.00 2.79 0.394 NT

==============================================================

TESTS Soundness Organic Clay Dry Unit Wt.,Kg/m3 Mortar


Na SO4 Loss Impurities Lumps Loose Rodded Strength
REQUIREMENTS 12% max. - - -
RESULTS 7.457% 1648.59 1795.99 NT

REMARKS : Materials tested passed and meet specification requirements.

CHECKED BY: SUBMITTED BY:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES
WORKSHEET OF SIEVE ANALYSIS

Project : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro

Kind of Materials : Coarse Aggregate Specification Item No. : 506(1) c


Sampled at : Jobsite Stockpile
(Give as accurate a location as possible)
Original Source : Tigkan River
(Pit, Quarry, River, etc. and location)
Sampled by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 4, 2022
(Name & Designation) (Office) (Date)
Tested by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 5, 2022
(Name & Designation) (Office) (Date)
Computed by : Contractor's Tech. MIDR CONSTRUCTION & SUPPLIES March 5, 2022
(Name & Designation) (Office) (Date)

Lab No. RAB-G-506-CA-01 Original Weight in grams : 3742


Oven Dried Weight : 3660
Moisture Content, % : 2.24 Washed Ovendried Weight: 3645
Fineness Modulus :

SIEVE SIZES CUMULATIVE Governing Spec's,


Weight Retained, gram
English Metric % Retained Weigth passing, gram % passing % Passing
3" 75.0 mm
2 1/2" 63.0 mm 0 0 3650 100 100
2" 50.0 mm 137 4 3514 96 90-100
1 1/2" 37.5 mm 1391 42 2123 58 35-70
1" 25.0 mm 1611 86 512 14 0-15
3/4" 19.0 mm 109 89 403 11
1/2" 12.5 mm 257 96 146 4 0-5
3/8" 9.5 mm 73 98 73 2
No. 4 4.75 mm
No. 8 2.36 mm
No. 10 2.00 mm
No. 16 1.18 mm
No. 30 0.600 mm
No. 40 0.425 mm
No. 50 0.300 mm
No. 100 0.150 mm
No. 200 0.075 mm 41 32 0.88 0-1
PAN 17
Wash Passing 200 15
TOTAL 3652

Remarks/Recommendations: Sample meets grading specifications

Prepared by: Checked by: Noted By:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG MERCEDES G. ASPI


Materials Engineer- Contractor Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

Soundness test of Aggregate by used of Sodium Sulfate or Magnesium Sulfate


(AASHTO) T-104)

Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name of Project) (Province)
Contractor: MIDR CONSTRUCTION & SUPPLIES
Kind of Materials: Fine and Coarse Aggregate Spec's. Item Number : 311
Sampled At: Tigkan River
(Given the accurate location as posible)
Tested By: MQC Personnel DPWH 27-Feb-23
(Name and Designation) (Office) (Date)
Computed By: MQC Personnel DPWH 05-Mar-23
(Name and Designation) (Office) (Date)

Laboratory Number: RAB-S-FA&CA-01

Sample Original Weight Test Weight Test Loss in Percent Wt. Average
SIEVE SIZE Grading Percent Fraction Before Fraction After Weight Loss (Corrected
Retained Test, gms. Test, gms. After Test, gms. After Test % Loss)
Passing Retained (A) (B) © (D) (E) (F)
SOUNDNESS TEST FOR FINE AGGREGATE

No. 30 No. 50 27% 100 91 9.00 9.00 2.43%


No. 16 No. 30 26% 100 92 8.00 8.00 2.08%
No. 8 No. 16 24% 100 93 7.00 7.00 1.68%
No. 4 No. 8 9% 100 92 8.00 8.00 0.72%
3/8" No, 4 14% 100
TOTAL 100% 500 6.91%
SOUNDNESS TEST FOR COARSE AGGREGATE

2 1/2" 1 1/2" 14% 3000.00 2648.00 352.00 11.73 1.643%


1 1/2" 3/4" 56% 1500.00 1402.00 98.00 6.53 3.659%
3/4" 3/8" 26% 1000.00 917.00 83.00 8.30 2.158%
3/8" No. 4 4% 300.00 0.000%
TOTAL 100% 5800.00 7.459%

Remarks/Recommendation: Passed

Prepared by: Submitted by:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

TEST ON CLAY LUMPS OF FINE AGGREGATES

Lab. No.:

PROJECT:

KIND OF MATERIALS: SPECS. ITEM NO.:


TESTED BY:
(Name & Designation) (Office) (Date)
COMPUTED BY
(Name & Designation) (Office) (Date)

(M-R)
P= x 100
M
Where:
P = Percent of clay lumps and friable particles
M = Mass of test sample (for fine aggregate the mass of the portion coarser than
the 1.18 mm (No. 16) sieve and shall have a mass not less than 25 g)
R = Mass of particles retained on designated sieve

(M-R)
P= x 100
M

25 24.8
= x 100
25

P= 0.80 SPEC'S = 1% Max.

Prepared by: Checked by: Noted By:

GRACE M. MANONGSONG MARK LESTER B. CABRAL MERCEDES G. ASPI


Engineer II Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

TEST ON CLAY LUMPS OF FINE AGGREGATES

Lab. No.: RA-CL-FA-01

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Naujan, Oriental Mindoro
KIND OF MATERIALS: Fine Aggregates SPECS. ITEM NO.: 311(1)
TESTED BY: MQC Personnel DPWH - MODEO February 28, 2023
(Name & Designation) (Office) (Date)
COMPUTED BY MQC Personnel DPWH - MODEO March 1, 2023
(Name & Designation) (Office) (Date)

(M-R)
P= x 100
M
Where:
P = Percent of clay lumps and friable particles
M = Mass of test sample (for fine aggregate the mass of the portion coarser than
the 1.18 mm (No. 16) sieve and shall have a mass not less than 25 g)
R = Mass of particles retained on designated sieve

(M-R)
P= x 100
M

25 24.8
= x 100
25

P= 0.80 SPEC'S = 1% Max.

Prepared by: Checked by: Noted By:

GRACE M. MANONGSONG MARK LESTER B. CABRAL MERCEDES G. ASPI


Engineer II Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

TEST ON CLAY LUMPS OF FINE AGGREGATES

Lab. No.: RA-CL-FA-01

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Naujan, Oriental Mindoro
KIND OF MATERIALS: Fine Aggregates SPECS. ITEM NO.: 311(1)
TESTED BY: MQC Personnel DPWH - MODEO February 28, 2023
(Name & Designation) (Office) (Date)
COMPUTED BY MQC Personnel DPWH - MODEO March 1, 2023
(Name & Designation) (Office) (Date)

(M-R)
P= x 100
M
Where:
P = Percent of clay lumps and friable particles
M = Mass of test sample (for fine aggregate the mass of the portion coarser than
the 1.18 mm (No. 16) sieve and shall have a mass not less than 25 g)
R = Mass of particles retained on designated sieve

(M-R)
P= x 100
M

25 24.8
= x 100
25

P= 0.80 SPEC'S = 1% Max.

Prepared by: Checked by: Noted By:

GRACE M. MANONGSONG MARK LESTER B. CABRAL MERCEDES G. ASPI


Engineer II Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

TEST ON CLAY LUMPS OF FINE AGGREGATES

Lab. No.: RA-CL-FA-01

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
Naujan, Oriental Mindoro
KIND OF MATERIALS: Fine Aggregates SPECS. ITEM NO.: 311(1)
TESTED BY: MQC Personnel DPWH - MODEO February 28, 2023
(Name & Designation) (Office) (Date)
COMPUTED BY MQC Personnel DPWH - MODEO March 1, 2023
(Name & Designation) (Office) (Date)

(M-R)
P= x 100
M
Where:
P = Percent of clay lumps and friable particles
M = Mass of test sample (for fine aggregate the mass of the portion coarser than
the 1.18 mm (No. 16) sieve and shall have a mass not less than 25 g)
R = Mass of particles retained on designated sieve

(M-R)
P= x 100
M

25 24.8
= x 100
25

P= 0.80 SPEC'S = 1% Max.

Prepared by: Checked by: Noted By:

GRACE M. MANONGSONG MARK LESTER B. CABRAL MERCEDES G. ASPI


Engineer II Engineer II Engineer III
MIDR CONSTRUCTION & SUPPLIES

TRIAL MIX -405

Date: February 24, 2023


Source: Tigkan River
Cement Factor: 9.50 cu.m./bag

CEMENT 40.00 kgs


WATER 16.63 kgs
FINE AGGREGATES 70.45 kgs
COARSE AGGREGATES 132.40 kgs
TOTAL 259.48 kgs

Weight of Concrete 98.2 kgs

Wt. of Concrete
WEIGHT = (Wt. of Ind. Materials)
Total Wt. of Mat'ls

98.2
CEMENT = 40.00 = 15.14 kgs
259.48

98.2
FA = 70.45 = 26.66 kgs
259.48

98.2
CA = 132.40 = 50.11 kgs
259.48

98.2
WATER = 16.63 = 6.29 kgs
259.48

Summary:
Cement 15.14 kgs
Fine Aggregates 26.66 kgs
Coarse Aggregates 50.11 kgs
Water 6.29 kgs

Prepared by: Certified by:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG


Materials Engineer Materials Engineer
MIDR CONSTRUCTION & SUPPLIES DPWH-MODEO

Noted by:

MERCEDES G. ASPI
QAS-MODEO, Chief
MIDR CONSTRUCTION & SUPPLIES

TRIAL MIX -311

Date: February 24, 2023


Source: Tigkan River
Cement Factor: 9.50 cu.m./bag

CEMENT 40.00 kgs


WATER 21.89 kgs
FINE AGGREGATES 92.84 kgs
COARSE AGGREGATES 108.98 kgs
TOTAL 263.70 kgs

Weight of Concrete 98.2 kgs

Wt. of Concrete
WEIGHT = (Wt. of Ind. Materials)
Total Wt. of Mat'ls

98.2
CEMENT = 40.00 = 14.90 kgs
263.70

98.2
FA = 92.84 = 34.57 kgs
263.70

98.2
CA = 108.98 = 40.58 kgs
263.70

98.2
WATER = 21.89 = 8.15 kgs
263.70

Summary:
Cement 14.90 kgs
Fine Aggregates 34.57 kgs
Coarse Aggregates 40.58 kgs
Water 8.15 kgs

Prepared by: Certified by:

MARK IAN M. DELOS REYES GRACE M. MANONGSONG


Materials Engineer Materials Engineer
MIDR CONSTRUCTION & SUPPLIES DPWH-MODEO

Noted by:

MERCEDES G. ASPI
QAS-MODEO, Chief
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR UNIT WEIGHT

PROJECT:
(Name) (Town/City/Province)
KIND OF MATERIALS: Fine Aggregate Spec's Item No.:
SAMPLED AT:
(Give as accurate a location as possible)
ORIGINAL SOURCE:
(Pit, Quarry, River, etc. and location)
SAMPLED BY:
(Name and Designation) (Office) (Date)
TESTED BY:
(Name and Designation) (Office) (Date)
COMPUTED BY:
(Name and Designation) (Office) (Date)

Lab. Number : BIN-UW-311-FA-01

LOOSE
I II III
1. Wt. of Container + sample, kg.
2. Wt. of Container, kg.
3. Sample, kg. (1) - (2)
4. Vol. of Container, cu.m.
5. Unit Weight/mass, kg/cu.m. (3) / (4)
Ave. Unit Weight

RODDED
I II III
1. Wt. of Container + sample, kg.
2. Wt. of Container, kg.
3. Sample, kg. (1) - (2)
4. Vol. of Container, cu.m.
5. Unit Weight/mass, kg/cu.m. (3) / (4)
Ave. Unit Weight

Prepared by: Noted By:


GRACE M. MANONGSONG MERCEDES G. ASPI
Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR UNIT WEIGHT

PROJECT:
(Name) (Town/City/Province)
KIND OF MATERIALS: Coarse Aggregates Spec's Item No.:
SAMPLED AT:
(Give as accurate a location as possible)
ORIGINAL SOURCE:
(Pit, Quarry, River, etc. and location)
SAMPLED BY:
(Name and Designation) (Office) (Date)
TESTED BY:
(Name and Designation) (Office) (Date)
COMPUTED BY:
(Name and Designation) (Office) (Date)

Lab. Number : BIN-UW-311-CA-01

LOOSE
I II III
1. Wt. of Container + sample, kg.
2. Wt. of Container, kg.
3. Sample, kg. (1) - (2)
4. Vol. of Container, cu.m.
5. Unit Weight/mass, kg/cu.m. (3) / (4)
Ave. Unit Weight

RODDED
I II III
1. Wt. of Container + sample, kg.
2. Wt. of Container, kg.
3. Sample, kg. (1) - (2)
4. Vol. of Container, cu.m.
5. Unit Weight/mass, kg/cu.m. (3) / (4)
Ave. Unit Weight

Prepared by: Noted By:


GRACE M. MANONGSONG MERCEDES G. ASPI
Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR UNIT WEIGHT

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name) (Town/City/Province)
KIND OF MATERIALS: Fine Aggregate Spec's Item No.: 311(1)
SAMPLED AT: Jobsite Stockpile
(Give as accurate a location as possible)
ORIGINAL SOURCE: Tigkan River
(Pit, Quarry, River, etc. and location)
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES February 28, 2023
(Name and Designation) (Office) (Date)
TESTED BY: MQC Personnel DPWH March 1, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC Personnel DPWH March 1, 2023
(Name and Designation) (Office) (Date)

Lab. Number : BIN-UW-311-FA-01

LOOSE
I II III
1. Wt. of Container + sample, kg. 4.86 5.060 4.98
2. Wt. of Container, kg. 1.463 1.463 1.463
3. Sample, kg. (1) - (2) 3.397 3.597 3.517
4. Vol. of Container, cu.m. 0.0020200 0.0020200 0.0020200
5. Unit Weight/mass, kg/cu.m. (3) / (4) 1681.68 1780.69 1741.09
Ave. Unit Weight 1734.49

RODDED
I II III
1. Wt. of Container + sample, kg. 5.04 5.37 5.58
2. Wt. of Container, kg. 1.463 1.463 1.463
3. Sample, kg. (1) - (2) 3.577 3.907 4.117
4. Vol. of Container, cu.m. 0.0020200 0.0020200 0.0020200
5. Unit Weight/mass, kg/cu.m. (3) / (4) 1770.79 1934.16 2038.12
Ave. Unit Weight 1914.36

Prepared by: Noted By:


GRACE M. MANONGSONG MERCEDES G. ASPI
Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR UNIT WEIGHT

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Name) (Town/City/Province)
KIND OF MATERIALS: Coarse Aggregates Spec's Item No.: 311(1)
SAMPLED AT: Jobsite Stockpile
(Give as accurate a location as possible)
ORIGINAL SOURCE: Alcate River
(Pit, Quarry, River, etc. and location)
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES February 28, 2023
(Name and Designation) (Office) (Date)
TESTED BY: MQC Personnel DPWH March 1, 2023
(Name and Designation) (Office) (Date)
COMPUTED BY: MQC Personnel DPWH March 1, 2023
(Name and Designation) (Office) (Date)

Lab. Number : BIN-UW-311-CA-01

LOOSE
I II III
1. Wt. of Container + sample, kg. 4.570 4.620 4.520
2. Wt. of Container, kg. 1.463 1.463 1.463
3. Sample, kg. (1) - (2) 3.107 3.157 3.057
4. Vol. of Container, cu.m. 0.0020200 0.0020200 0.00202
5. Unit Weight/mass, kg/cu.m. (3) / (4) 1538.12 1562.87 1513.37
Ave. Unit Weight 1538.12

RODDED
I II III
1. Wt. of Container + sample, kg. 4.920 4.770 5.170
2. Wt. of Container, kg. 1.463 1.463 1.463
3. Sample, kg. (1) - (2) 3.457 3.307 3.707
4. Vol. of Container, cu.m. 0.0020200 0.0020200 0.00202
5. Unit Weight/mass, kg/cu.m. (3) / (4) 1711.39 1637.13 1835.15
Ave. Unit Weight 1727.89

Prepared by: Noted By:


GRACE M. MANONGSONG MERCEDES G. ASPI
Engineer II Engineer III
Republic of the Philippines
Department of Public Works and Highways
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR SPECIFIC GRAVITY AND ABSORPTION OF AGGREGATES/BOULDERS


(AASHTO T-84/T-85)

DATE: February 28, 2023


Lab. No. RAB-311-SG-FA&CA-01
PROJECT : Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
CONTRACTOR: MIDR CONSTRUCTION & SUPPLIES
SAMPLED AT: Stockpile
ORIGINAL SOURCETigkan River
SAMPLED BY: Vivien M. Tolentino - L.T. 1 DPWH March 9, 2018
(Name and Designation) (Office) (Date)
TESTED BY: Vivien M. Tolentino - L.T. 1 DPWH March 11, 2018
(Name and Designation) (Office) (Date)
= = = = = = = = = = = = = ======================
= = = = = = = = = = = == == == == == == == == == == == == == == == =======
= = = =============== = = = = = = = = = = ================= = = = = = = = = = = = = =

TRIAL
COARSE AGGREGATE (WIRE BASKET METHOD)
II I Average
1. Weight of oven dry sample in air,gms. 4451 4449 4450
2. Wt. of surface dry sample in air,gms. 4469 4466 4468
3. Weight of saturated sample in water,gms. 2864 2860 2862
4. Bulk Specific Gravity, (Dry) 1/(2-3) 2.77 2.77 2.77
5. Bulk Specific Gravity (SSD) 2/(2-3) 2.78 2.78 2.78
6. Apparent Specific Gravity, (SSD) 1/(1-3) 2.80 2.80 2.80
7. Absorption, % ((2-1)/1x100) 0.382 0.404 0.393
===============================================================================================================

TRIAL
FINE AGGREGATE (PYCNOMETER METHOD)
I II Average
1. Weight of oven dry sample in air 496.00 497.00 496.50
2. Wt. of Vol. Flask full of water 650.00 653.00 651.50
3. Weight of Vol. flask full + sample + water 965.00 968.00 966.50
4. Wt. of sample in water (3-2) 315.00 315.00 315.00
5. Volume sample in water (500-4) 185.00 185.00 185.00
6. Bulk Specific Gravity, (SSD) (500 / 5) 2.70 2.70 2.70
7. Bulk Specific Gravity, (DRY) (1/ 5 ) 2.68 2.69 2.68
8. Apparent Specific Gravity, (SSD) ( 1/(1-4)) 2.74 2.73 2.74
9. Absorption, % (( 500 - 1)/ 1 x 100) 0.81 0.60 0.71
REMARKS/RECOMMENDATION:

Prepared by: Submitted by:


GRACE M. MANONGSONG MERCEDES G. ASPI
Engineer II Engineer III
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS'
OFFICE OF THE DISTRICT ENGINEER
Region IV-B, MIMAROPA
Calapan City, Oriental Mindoro

WORKSHEET FOR FRACTURE FACE

Project:
(Number) (Name) (City/Province)
Kind of Materials: Coarse Aggregate Spec's Item No.:

Sampled at:
(Give as accurate a location as possible)
Original Source :
(Pit, Quarry, River, etc. and possible)
Sampled by:
(Name and Designation) (Office) (Date)
Tested by: DPWH
(Name and Designation) (Office) (Date)
Computed by: DPWH
(Name and Designation) (Office) (Date)

Lab. No. :

FOR AGGREGATE WITH MAXIMUM NOMINAL SIZE OF 3/4" OR LARGER


Retained Wt. of test sample (g) Wt. of Crushed Particle (g.) % Fracture Face

FOR AGGREGATE WITH MAXIMUM NOMINAL SIZE OF 3/4" OR SMALLER


Weight of AVERAGE
Weight of
Passing Retained fractured % Fracture Face
sample (g.) % Weight % Retained
(g.)

TOTAL

REMARKS:

PREPARED/TESTED BY: CERTIFIED CORRECT:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Chief, Quality Assurance Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS'
OFFICE OF THE DISTRICT ENGINEER
Region IV-B, MIMAROPA
Calapan City, Oriental Mindoro

WORKSHEET FOR FRACTURE FACE

Project:
(Number) (Name) (City/Province)
Kind of Materials: Coarse Aggregate Spec's Item No.:

Sampled at:
(Give as accurate a location as possible)
Original Source :
(Pit, Quarry, River, etc. and possible)
Sampled by:
(Name and Designation) (Office) (Date)
Tested by:
(Name and Designation) (Office) (Date)
Computed by:
(Name and Designation) (Office) (Date)

Lab. No. :

FOR AGGREGATE WITH MAXIMUM NOMINAL SIZE OF 3/4" OR LARGER


Retained Wt. of test sample (g) Wt. of Crushed Particle (g.) % Fracture Face

FOR AGGREGATE WITH MAXIMUM NOMINAL SIZE OF 3/4" OR SMALLER


Weight of AVERAGE
Weight of
Passing Retained fractured % Fracture Face
sample (g.) % Weight % Retained
(g.)

TOTAL

REMARKS:

PREPARED/TESTED BY: CERTIFIED CORRECT:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Chief, Quality Assurance Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS'
OFFICE OF THE DISTRICT ENGINEER
Region IV-B, MIMAROPA
Calapan City, Oriental Mindoro

WORKSHEET FOR FRACTURE FACE

Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Province)
Kind of Materials: Coarse Aggregate Spec's Item No.: 311(1)b1 , 405(2)c

Sampled at: Tigkan River, Naujan Oriental Mindoro


(Give as accurate a location as possible)
Original Source : Tigkan River, Naujan Oriental Mindoro
(Pit, Quarry, River, etc. and possible)
Sampled by: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES 2/28/2023
(Name and Designation) (Office) (Date)
Tested by: MQC Personnel DPWH 3/2/2023
(Name and Designation) (Office) (Date)
Computed by: MQC Personnel DPWH 3/2/2023
(Name and Designation) (Office) (Date)

Lab. No. : RAB-FF-01

FOR AGGREGATE WITH MAXIMUM NOMINAL SIZE OF 3/4" OR LARGER


Retained Wt. of test sample (g) Wt. of Crushed Particle (g.) % Fracture Face
9.50 mm (3/8") 3854 2438 63.25
FOR AGGREGATE WITH MAXIMUM NOMINAL SIZE OF 3/4" OR SMALLER
Weight of AVERAGE
Weight of
Passing Retained fractured % Fracture Face
sample (g.) % Weight % Retained
(g.)
19.00 mm (3/4") 9.50 mm (3/8') 2068 1856 56.63% 50.82% 89.75%
9.50 mm (3/8") 4.75 mm (#4) 1584 965 43.37% 26.42% 60.92%
TOTAL 3652 2821

REMARKS:

PREPARED/TESTED BY: CERTIFIED CORRECT:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Chief, Quality Assurance Section
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS'
OFFICE OF THE DISTRICT ENGINEER
Region IV-B, MIMAROPA
Calapan City, Oriental Mindoro

WORKSHEET FOR FRACTURE FACE

Project: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
(Number) (Name) (City/Province)
Kind of Materials: Fine Aggregate Spec's Item No.: 311(1)b1 - g, 405(2)c - e

Sampled at: Tigkan River, Naujan Oriental Mindoro


(Give as accurate a location as possible)
Original Source : Tigkan River, Naujan Oriental Mindoro
(Pit, Quarry, River, etc. and possible)
Sampled by: Tigkan River, Naujan Oriental Mindoro MIDR CONSTRUCTION & SUPPLIES 5/5/2015
(Name and Designation) (Office) (Date)
Tested by: MQC Personnel DPWH 5/7/2015
(Name and Designation) (Office) (Date)
Computed by: MQC Personnel DPWH 5/7/2015
(Name and Designation) (Office) (Date)

Lab. No. : RAB-FF-01

FOR AGGREGATE WITH MAXIMUM NOMINAL SIZE OF 3/4" OR LARGER


Retained Wt. of test sample (g) Wt. of Crushed Particle (g.) % Fracture Face
9.50 mm (3/8") 3854 2438 63.25
FOR AGGREGATE WITH MAXIMUM NOMINAL SIZE OF 3/4" OR SMALLER
Weight of AVERAGE
Weight of
Passing Retained fractured % Fracture Face
sample (g.) % Weight % Retained
(g.)
19.00 mm (3/4") 9.50 mm (3/8') 2068 1856 56.63% 50.82% 89.75%
9.50 mm (3/8") 4.75 mm (#4) 1584 965 43.37% 26.42% 60.92%
TOTAL 3652 2821

REMARKS:

PREPARED/TESTED BY: CERTIFIED CORRECT:

GRACE M. MANONGSONG MERCEDES G. ASPI


Engineer II Chief, Quality Assurance Section
Republic of the Philippines
Department of Public Works and Highways
Region –IV-B, MIMAROPA
OFFICE OF THE DISTRICT ENGINEER
Calapan City, Oriental Mindoro

WORKSHEET FOR ORGANIC IMPURITIES

PROJECT: Construction of Road, Sitio Rubia to Sta. Ana, Barangay Bangkatan, Baco, Oriental Mindoro
KIND OF MATERIALS: Fine Aggregates
SAMPLED AT: Stockpile
SAMPLED BY: Contractor's Personnel MIDR CONSTRUCTION & SUPPLIES February 28, 2023
(Name & Designation) (Office) (Date)
TESTED BY: MQC Personnel DPWH - MODEO February 28, 2023
(Name & Designation) (Office) (Date)
COMPUTED BY: MQC Personnel DPWH - MODEO February 28, 2023
(Name & Designation) (Office) (Date)

Lab. No.: RAB-OI-01

REAGENTS AND REFERENCE STANDARD COLOR SOLUTION:

1. Weight of Sample in Bottle level 120 ml

2. Weight of 3% Sodium Hydroxide Solution 5 ml

3. Weight of Water in Bottle 180 ml

4. Color Value Lighter color

5. Injurious organic compound in natural sands NONE

Prepared by: Checked by: Noted By:

AARON LOUIE C. ALULOD GRACE M. MANONGSONG MERCEDES G. ASPI


LABORATORY TECHNICIAN II Engineer II Engineer III