Student Declaration
I certify that the work submitted for this assessment pack is my own. I have clearly
referenced any sources used in my submission. I understand that a false declaration is a form
of malpractice;
I have kept a copy of this assessment pack and all relevant notes, attachments, and reference
material that I used in the production of the assessment pack;
For the purposes of assessment, I give the trainer/assessor of this assessment the permission
to:
o Reproduce this assessment and provide a copy to another member of staff; and
o Take steps to authenticate the assessment, including communicating a copy of this
assessment to a checking service (which may retain a copy of the assessment on its
database for future plagiarism checking).
Date: ____/_____/______________
Trainer/Assessor
Signature
Assessment Conditions
Unit purpose/application
This unit describes the skills and knowledge required to identify, analyse and document business
requirements.
It applies to individuals working as systems analyst developers and project team leaders, and managers
responsible for gathering data to identify business requirements.
No licensing, legislative or certification requirements apply to this unit at the time of publication.
What the student can expect to learn by studying this unit of competency
Submission instructions
Your trainer/assessor will confirm assessment submission details for each assessment task.
Plagiarism
Plagiarism means to take and use another person's ideas and or manner of expressing them and to pass
them off as your own by failing to give appropriate acknowledgement. This includes material sourced
from the internet, RTO staff, other students, and from published and unpublished work.
Plagiarism occurs when you fail to acknowledge that the ideas or work of others are being used, which
includes:
Paraphrasing and presenting work or ideas without a reference
Copying work either in whole or in part
Presenting designs, codes or images as your own work
Using phrases and passages verbatim without quotation marks or referencing the author or
web page
Reproducing lecture notes without proper acknowledgement.
Collusion
Unit outcome
This unit is not graded and the student must complete and submit all requirements for the
assessment task for this cluster or unit of competency to be deemed competent.
Students will receive a 'satisfactorily completed' (S) or 'not yet satisfactorily completed (NS)
result for each individual unit assessment task (UAT).
Final unit result will be recorded as competency achieved/competent (C) or competency not
yet achieved/not yet competent (NYC).
They currently promote their services via their website and social media channels included
Facebook, Twitter, and Instagram. They also advertise in selected design magazines and on selected
radio stations.
Design Excellence works with a large number of other businesses and trade sub-contractors when
undertaking installation work. This includes ordering bathroom and kitchen products, as well as
installation and fitting of kitchens and bathrooms.
Recently Design Excellence work premises were extensively damaged in a large fire that started in a
neighbouring business. As a result of this, the entire contents of the building including its entire
network was destroyed, and insurance costs are currently being assessed. While some business data
was lost, most of it can be recovered as the business houses backup facilities offsite.
Because of the recent disaster, and the delays in rebuilding the old premises, Design Excellence has
found a newly refurbished premise in the surrounding area, and will be moving to these premises in
the near future. The premises have already been pre-cabled with Category 6 Ethernet cable. As this is
the case, the hardware components just need to be determined and purchased, along with any
software requirements to configure and manage the network, and to allow employees to complete
their normal work tasks.
You work as the IT Manager for Design Excellence, and have been tasked by Terry Jackson who is the
Managing Director, to implement a network in the new premises, so that the business can become
operational as soon as possible.
You have pulled some of the organisations data out of the backed up business files. This includes the
following list of the old network components that were used prior to the fire:
The employees previously used the following software applications on the network:
While the website, the social media accounts, Intranet files, and most of the business internal work
files were backed up and can be restored, most of the applications used by the employees and their
associated files have been lost. As such, identification of whether this software is still appropriate or
whether it can be changed should be an important priority for the project.
Mission: to provide design and installation of quality kitchens and bathrooms that exceed customer
expectations.
Your task for this assessment is to determine the requirements for the new network, so that business
operations can be implemented to meet the needs of the business. This should include not only the
hardware requirements, but also the software requirements.
Design Excellence has Project Management policies and procedures that outline the organisational
standards expected for gathering requirements, planning the project through to implementation and
to completion. A portion of the project management work procedure for gathering and analysing
requirements is provided below:
When undertaking a stakeholder interview the facilitator should develop an Interview Agenda using
the organisational template. This should be distributed to the invitees prior to the interview time and
be used by the facilitator to conduct the interview.
During the interview, the facilitator should take notes of the responses and then analysis these using
the Interview Question Analysis Document organisational template.
When developing a survey, the facilitator should develop it using the Requirements Survey
organisational template and then distribute the survey to these stakeholders who will be completing
it. Once the survey takers have completed the survey they are to return it to the facilitator who
should use the Survey Analysis Document to analyse the survey responses.
In this activity you need to review the scenario, and then provide answers to the following in a word
processor:
1. Provide an overview of the business including its business domain. (100-200 words
expected)
= For the beginning of the business we need to establish its identity by introducing name
so that it will be different from another and recognized easily.But looking in this higly
modernized and advanced technology we have to rely on internet where it can be best way
to spread business because it can spread it ideas and function or main theme of the
business by which anyone can access all the information from any corner of the world
through this internet.So if business has to introduce in the internet then it need to be
named as domain in the context of internet.SO business domain will be more successful.
2. Provide a summary of the old network including the hardware and software used. (100 –
200 words expected)
= The old network used are as follows. As a operating system they use 2013 suite version
followed by Microsoft project 2013 for management of projects. For the financial department
they have use reckon which use for payroll and other financial requirements. They use adobe
reader and adobe suite for graphic designer requirements whereas they use salesforce CRM
software for client management. They uses NetBeans IDE foe developing web and Autodesk
AutoCAD for interior designer and last for the IT helpdesk support and other IT asset they uses
manage.
3. Identify five key stakeholders (apart from yourself) that should have involvement in this
project, and what you believe their degree of involvement in this project will be.
= The five key stakeholders that should be involve in this project are as follows:
Managing director
As this stakeholder is a main person to take care and observe all the things in the
company.
Operational manager
As a operational manager this stakeholder is responsible to take care of operation in
the project.
Sales manager
Sales manager is responsible to take care of the products and services and help to
distribute it to the customer which helps to make company developed.
Designing manager
This stakeholder is responsible to design the products and services before going
those things to customer.
4. Identify five different potential document based information sources that might be
applicable for this project.
Five different potential document based information sources that might be applicable for
this project are as follows:
Interview
Annual reports
Meetings and conference
Journal articles
surveys
5. Identify what quality assurance practice you will use to determine the validity of the
information gathered.
Following are the quality assurance practice which use to determine the validity of the
information gathered:
Establishment SQA facilitation
Implementation quality management process
Conduction a process review
Creating a report on the project status
Performing a process compliance review
Identifying process improvement areas
Creating process trainings
6. Describe current industry accepted hardware and software that is applicable to this project
including its features and capabilities. (150 -200 words expected)
After the destruction and lots of losses of infrastructure and data it need to be maintain
again but in a modern way. It is done by the new setup. At first the domain server is
essential so windows server R2 standard is implemented for better performance and huge
data storage with more secure way while client desktop is designed with windows 7
professional for convenience. A router is introduce which acted as gateway/firewall for the
network along with two 24 port switches to direct network communications. For better
and fast printing two network printers are used and at last for continuous power flow and
prevent data loss in power cut off Uninterruptible Power Supply (UPS) is used.
In this activity you need to review the scenario, and then develop an interview agenda to
determine possible requirements for the project. You need to select two stakeholders that you
have identified in the previous activity for the purpose of the interview, one will be the assessor,
and the other will be a fellow student.
As per the scenario the purpose of the interview to try and identify the network for the new
premises, so that the business can become operational as soon as possible. This can include any
requirements for what hardware and software is needed, the budget, and the time scale for the
implementation. Based on the two stakeholders identified you will need to identify 6 questions to
ask them. For example, if you have identified Terry Jackson is one of the stakeholders you might
ask him questions relating to the budget for the project, what human resources you can utilise for
the project, and when he would want it implemented by? Or if you identify one of the managers
you might ask them questions related to their software needs for their department or individual
employees, their backup requirements, or their security requirements for files that need to be
protected.
Once the interview agenda has been created you need to present the interview orally, and
undertake analysis of the stakeholder responses.
For the purpose of this activity the assessor will play the role of the stakeholders.
1. Develop an interview agenda using a the organisational template below that includes:
The location, date, and time of the interview
The stakeholders who need to attend
An introduction of what the interview is about, and what it will cover
Six questions that can be used to during the interview to confirm with stakeholders
business critical factors relating to current and future directions of the organisations
network. You should use a mixture of open and closed questions.
A closing statement
Note: you need to provide this agenda to the assessor so they can organise an interview time and
prepare appropriate answers for the questions.
Introduction
<< Since almost all the system had been destroy in the fire and company is expected for a better and
a modern system. A small interview is taken in company with stakeholders for the better information
regarding following questions.>>
Questions
Closing statement
<< After the interview we were successful to gather some useful information to proceed our further
work.I will make sure focous in all this problem and at last I will thanks to all the stakeholders to
make their time for the interview.>>
2. Undertake the interview as per the developed interview agenda orally. You need to:
Conduct the interview as per the agenda
Use listening and verbal skills to respond to feedback from the stakeholders.
Use note taking skills to document the responses for the interview questions.
3. Document and analysis data gathered during the interview using a word processor. You
need to:
Document the response into the organisational template provided below.
Analysis the responses and provide analysis notes on the response. This analysis
should detail whether the response is pertinent to the project or not, and its
importance if it is.
For this task you need to develop a survey to identify the network requirements and then analysis
the responses to the survey. As with the interview in the previous activity the purpose of the
survey is to gather requirements for the network, except in this case you will be using an
alternative method to do this. The questions you need to develop need to be designed to gather
their feedback so requirements can be determined. Think of questions that relate to their
hardware, software, backup, and sustainability needs.
Using a survey allows you to collect different types of information than an interview and to a lot
more people. As an example you can use a rating type question where users can rate on the
question using a scale from 1 to 5, or 1 to 10. Feedback type questions or even closed questions
can also be asked.
1. Develop a survey using the organisational template given below to gather data from the
survey takers. You need to:
Include an area for the stakeholder to put their name and the date
Include ten questions that contains a mixture of open and closed questions that can
be used to confirm with stakeholders business critical factors relating to current and
future directions of the organisation network.
Requirements Survey
Responders Name: ___OPERATIONAL MANAGER, WEB DEVELOPER,SALES ASSISTANT,DESIGN
MANAGER AND IT TECHNICIAN_________________________
Date: __02/O6/2019_____________________________________
Questions
b) What do you think about your data privacy on your work place?
c) If you had a problem with the system, how long did it take to fix it.
d) How often are you updated on the new software that comes in the
market?
e) Do you feel satisfy on the responses and support?
g) On the scale of 1 to 5 how satisfy are you with the network speed.
h) On the scale of 1 to 5 how satisfy are you with the security system.
i) On the scale of 1 to 5 How do you find the cloud computing?
2. Once the survey has been created you should submit this to the assessor. The assessor will
be collecting surveys from your fellow classmates and organise to distribute your survey to
these class mates. You should complete the surveys the assessor distributes to you using
the scenario as a guide, and answer with appropriate information answers. It is not
important that the answers are 100% accurate, they just need to be used as a sample that
analysis can be conducted upon.
3. Once your survey has been completed by your fellow classmates, the assessor will
distribute the completed surveys so that you can then analysis the responses and provide
analysis notes and calculations on the responses using the organisational template
provided below.
For feedback type questions this analysis should detail whether the response is
pertinent to the project or not, and its importance if it is.
For rating type questions, you should undertake a calculation to determine the
result of the responders’ responses. This could be to calculate the average of the
responders’ responses or another calculation based on the question asked.
Respondees
1 2 3 4 5 Result
Question 6 2 3 2 1 3 Not satisfied
Question 7 2 3 4 2 1 Not good
Question 8 1 2 3 2 1 Not satisfied
Question 9 5 5 5 5 5 Prioritize it
Question 10 1 1 2 1 1 Need to work
hard o
Note: you will need a separate table for each feedback type question in your survey, and one table
for any rating type questions in your survey.
For this task you need to develop a report on the analysis of the data you have collected, provide
an overview of important factors in the project, and make some recommendations based on your
analysis.
Using a word processor, you need to use the following organisational template and fill in the
information you have gathered over the previous tasks under the appropriate headings and make
some recommendations.
Note: you should replace any text within the << >> characters.
Analysis Report
Introduction
Project goals
<< The goals of this project is develop better system so that it will provide design and installation
of quality kitchens and bathrooms that exceed customer expectations to become Australia’s best
kitchen and bathroom designers >>
Stakeholders involved
b) web developer
c) sales assistant
d) Design manager
Quality assurance
<<
<< From the report it can be seen that almost every sector is not satisfied and need to focused and
use of modern and better technologies should be prirotize.
At last, from all the data collection we are in conclusion about that we need to work hard in
different sectors and i want all stakeholders to remember their duty as well as help each other to
fulfil the goals and the main objective through the analysis is that we need to focus on all the
aspects that are affecting our day to day works and as well as our company profit.>>