Name 

of Work : Four Lanning of Viramgam ‐ Lakhtar ‐ Surendranagar ‐ Muli ‐ Dodia Road Km. 70/200 to 101/500 (SH‐17).

ASPHALT CONSUMPTION STATEMENT
Sr.  Qty. Item description Unit Cons. Consumption in Kg.
No.  Rate
1 2 3 4 5 6
11 155386.900 Providing and laying dense graded bituminous macadam with 100‐120 TPH batch type M.T. 45.00 6992410.50
HMP producing an average output of 75 tonnes per hour using crushed aggregates of
specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix
and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher
with sensor control to the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH
specification clause No. 507 complete in all respects.

12 67735.800 Providing and laying bituminous concrete with 100‐120 TPH Batch mix Plant and Paver M.T. 55.00 3725469.00
Finisher Hydraustatic with Sensor control using crushed aggregates of Grading‐II ( 50 mm
thickness ), premixed with bituminous binder @ 5.5 % mix and filler, transporting the hot
mix to work site, laying with a hydrostatic paver finisher with sensor control to the
required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per MORTH specification clause No. 512
complete in all respects
Total… 10717879.50
Kg.
10717.88
M.T.

Executive Engineer
R & B Division 
Surendranagar