Professional Documents
Culture Documents
Department of Education
Caraga Region
SCHOOLS DIVISION OF SURIGAO DEL SUR
BAROBO I DISTRICT
_____________________________________________________
1.Barobo CES
Project FEEL: Reduced dropout once a 6% Distance from school Intensify home
Find and rate from .93 to 0 month Accomplishment visitation
Embrace
(reduced drop-
Every Learner
out rate from . Failure on monitoring
93 to .64 %) Intensify
monitoring of
pupils' attendances
Family problem and participation
Project READ Reduced the once a Frustration level Overlapping of activities Continue the
(Reading number of week reduced to 112 reading
Exercise A Day) frustration level from 146 intervention
from 146 to 0 program
Failure on the part of the
teacher to follow-up the
learner.
Close monitoring
2.Dapdap ES
Project BOS To equip learners There is an Some of the learners read Give a variety of
(Basahon Og with reading skills increase of the story accurately but reading materials
Sabton) to make them Once a Reading level have trouble with and make reading a
proficient and week questions, they may have more active process
from
independent reading comprehension through home
frustration to
readers in their problems. visitation
instructional
grade level.
then to
independent
level
3.Guinhalinan Project FAITH Reduced number once a Reduced Parents were not giving Conduct home
ES of drop-out month number of priority in supporting their visitation
(Fair- minded pupils from 7 to pupils from 7 to children in school.
in Advocating 0. 1
Individual with Distance from school to
Thorough Help home, home chores. Lack
to reduce of interest.
drop-out
Project READ Decreased Once a Decreased the Pupils have poor focus u. Conduct hone
(Responsible number of week number of Reading. No regular visitation
Enthusiast frustration pupils under reading practice at home
towards Active reading level frustration level and limited appropriate Provision of
appropriate reading
Development pupils from 18 to reading materials.
un reading 0 materials
5.Kinayan ES Project WINS To install Quarterly Installed Low water supply from Consult the water
(Water In sufficient water sufficient water water district provider
School) supply to every supply in all
classrooms from classrooms
0 to 8
Project KaKaIn
(Kalusugan ng
Kabataan
Monthly Decreased Some parents refused to let
Ingatan)
To decrease the number of their pupils be fed Conduct parents
number of wasted and orientation and
wasted and severely wasted home visitation
severely wasted
Increased the
number of
stakeholders Quarterly
Project SAFE participation from 85% Constant follow-up
(Secured and 80% to 100% in all Low linkages of school
participation personnel and parents, less to the parents and
Free from PAP this school
year 2021-2022 response of parents to the close relationship
Hazard
Environment) school activities to stakeholders
To construct 5
spans of concrete
perimeter fence
0%
January accomplishment
December -Continuation of
2020 construction to
accomplish the
perimeter fence
Reduced
frustration level
reader in grade 3-
6 in English and
Filipino at the end
Project TeaM- of this school
Continue the
R (Teach Me to reading
year. intervention
Read)
program
To increase Pupils have poor focus on
attendance of Once a Reduced the Reading. No regular
parents in school week number of reading practice at home.
programs, pupils under Parents don’t have time to
Monthly
8.Sua ES Project CAMP Decrease the Every Improved Poor nutrition due to Sustain the project
number of release of nutritional economical status
Combat wasTEd and school status. From
Against severely wasted based wasted &
Malnutrition pupils of the year feeding severely wasted
Project program/o to normal
ngoing
Project PHIL Promoting proper Everyday Pupils are now Unstable reminder of Close monitoring
hygiene through learning to parents in maintaining
9.Barobo NHS
1. Project Reduced number Quarterly *Implemented Difficulty of reaching the
LAMP of students who Adopt-a-Child students and parents due to
(Learner dropped out from Program pandemic *Constant
schooling from 52 monitoring of
Always Matter
in the year 2019 faculty and staff
Project) to 0 in the year with ‘adopted”
2022 Delayed submission of students
SARDO watchlist Report
Conducted form the class advisers due
intensive Home to conflict of activities
This year’s Visitation to the
Reduced community
number of outreach
students under program for *Home Visitation
frustration level Grade 7 learners
from 325 in through Home
2020 to 196 in Visitation
the year 2021
MPS
1st Quarter:
44.65
2nd Quarter:
65.92
Average: 55.285
(4.285% above
the 51%
baseline)
*Project leader
served as one of *All Math Teachers
Increased *Communication between
the developers to be members of
average Development and QA Team
of LAS in Basic Development and
quarterly MPS QA Team
in Mathematics Calculus for the
from 67.53% to 2nd ad 3rd
73.23% by the quarter (used by *Absence of Face to face
end of 2021 the division) classes *ILMP maximized
*Crafting of AR
*Conducted once Proposal Is
action research Approved
Proposal in
Math titled
Tutorial Through
Teleconference
Technique: A
Math
Intervention in
the New Normal
(Commitment overall
, Honesty, quarterly MPS
Integrity, in all learning First Quarter Insufficient supplementary Provide Authentic
Courtesy, and areas from MPS materials Performance based
continuous 64.11 in 2018 to Assessment
24.67 – 49.34
acquisition of 75% by the end
Knowledge of 2022. Low comprehension
and skills) Strengthen/sustain
Second Quarter TBPA
MPS
This year’s target; Parents don’t have enough
33.68 – 67.35 time for learners
Conduct RRE
Average = intervention
58.35% (remediation,
reinforcement and
enrichment)
(16.65% below
the 75% target)
Member of QA
Team in LAS
and TBAPA
(Division/Distric
t/Municipality)
*Reproduction/P
Increased rinting of LAS *Constant
quarterly MPS *Low scores of students in communication with
result in English the summative Tests the parents to let
from 68% to them know about
73.4% by the end *Increased in their
of 2021 MPS from 49.34 sons/daughters’s
in the first performance
quarter to 67.35
in the second *Sustain the best
quarter practice (Talk to
Me” to enhance
students’ confidence
8. Project Enhanced and Quarterly Conducted 36 Teachers Reporting not on Monitoring Report
SHARE improved the KSA SLACS time on the LAC sessions
of identified
teachers teaching
(Share PMCF/Coaching
non-major
His/Her subjects from 10 There are still few teachers Form
Accountabilit developing need mentoring
y- Resources- teachers in 2018
through to 8 experienced
Enhancement teachers by the
activities such end of 2022.
SLAC, INSET,
and Demo
teaching
*Procured 4 fire
To raise the extinguishers *No early warning device *provision of at
result of Child least 1 set of early
Friendly School
*Procurement of
Toothbrush and
*Toothbrushing not realized
toothpaste so that
due to face-to-face learning
and the toothbrush and it will be distributed
toothpaste not given due to to the learners even
lack of budget this pandemic time
10.Javier NHS Project RAISE Raise students’ Quarterly Implemented Some students are working Intensify the RRE
academic localized TBAPA which makes it more activities.
performance by in grade 12. difficult for them to submit
at least 10% outputs.
11.Rizal NHS Project PUSch- To increase MPS Every Attained 58% Overlapping of activities of -Modify home visit
PET in all subjects by Wednesday MPS in all teachers technique
(Performance 58.% subjects
to Upgrade the -Strengthen
remedial
School’s
Periodical Test) instruction
Submitted by:
MYRNA E. MOZO,PhD
PSDS