Unit IG2: Risk assessment

Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).

Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.

Part 1: Background

You should aim to complete this section in 150 - 200 words.


Topic Comments
Name of Organization* AL Hajry OverseasCompany
Site location* Riyadh Metro Project Line 4
Number of workers 300 approximately
Al-HajryCompany is an electromechanical construction orientated company which is
working at multiple locations inside and outside of the Kingdom of Saudi Arabia. The work
includes construction of Shopping Malls, Government buildings, Residential complexes
as well as Metro Train project and Bus terminals. The Project that I am currently working
on is the Metro Project at line 4 in the capital city Riyadh. The project includes many
simultaneous activities. These activities include loading / unloading, heavy machinery
General description of the organization
moving, civil work that includes excavation, and confined space works. In MEP works,
some activities like lifting, cutting, grinding, welding and usage of MEWP.

The company has described the safety procedures and implement and monitor them on
regular basis to observe the performance outcome.

The area included for this risk assessment will be the activities that involves MEP works.
Description of the area to be included in the
The health and safety manager is responsible for the procedures who is answerable to
risk assessment
the project manager directly.
Any other relevant information NIL

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 1 of 16


* If you’re worried about confidentiality, you can invent a false name and location for your organization but, all other information provided must be
factual.

You should aim to complete this section in 100 - 200 words.


Note: this section can be completed after you have competed your risk assessment.
I have searched the ILO has set code of practice regarding worker responsibilities and more
about the workplace follow the ISO, OSHA, NFPA Standards as well. And I have gone through
the ARAMCO GI ( General Instruction) And Saudi Aramco construction safety manual
studiously.

ILO C155: Occupational safety and health convention 1981.


Outline how the risk assessment was ILO R164: OSH recommendation 1988.
carried out this should include: ILO C167: S&H in construction 1988.
 sources of information consulted; ILO R175: S&H In Construction 1988.
ILO C148: Working environment, Noise, vibration and air pollution convention 1977.
 who you spoke to; and
ILO C127: Maximum weight (Manual handling) convention 1967.
 how you identified: OSHA 3150: Revised 2002 safety standard for scaffold.
- the hazards; OSHA: 29CFR 1926, 500, 501, 502 & 503 Fall projection standard.
- what is already being done; and ISO7010: Standard for safety signs.
- any additional controls/actions NFPA 51B: Standard for fire prevention during hot work, welding, Cutting etc.
that may be required.
After exploring the source of information, I decided to visit the site and met with site workers,
foremen, Supervisors, engineers and discussed with them about their activities. They provided
some technical information which I did not observe in the visual inspection.
Also I deeply study the previous accident and incident reports and check the root cause of the
accident & incident.

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 2 of 16


Part 2: Risk Assessment

Organization name: Al Hajri Overseas Company


Date of assessment: 10August 2021
Scope of risk assessment: Over All Site.

Hazard category Who might be harmed What are you already doing? What further controls/actions Timescal
and hazard and how? are required? es for
further Responsible
actions person’s job
to be title
complete
d
(within …)
Security Breach: Employees, Contractors, An induction / training already is in ₒ All relevant Work permits must 30 days
Subcontractors & visitors. practice for the awareness of be in practice before to start Security
Violation in rules / Employees / others related people activities in the Metro Project. Manager,
regulations for security about security rules / regulations at site ₒ Assigned employees / others Project Manager,
at Metro Project site. before assigning / entering to the site. concerned persons must have & HSE
Violation of rules /
Competent / well trained security valid ID pass while they are at representative.
regulations may lead to personnel are assigned at the site for the site.
financial loss, entry to 24/7 hours to ensure site security rules / ₒ All barriers / wall fence of the
site may be restricted; regulations. project must be inspected
work suspension etc. regularly in accordance with
Violation / disobeying of Supervisory staff also ensures security schedules.
security rules & rules / regulations at work site. ₒ Site security’s current
regulations may lead to Site has been barricaded as well instructions, rules regulations
prosecution procedure secured properly by fences around safety signs & emergency
that might cause in whole the project. phones numbers must be
displayed at main entrance as
punishment as well fine.
well as other appropriate
locations at the site..
Welfare & Work All employees (Workers, Activities are being performed as ₒ Worker force to be advised to
Environment: Operators, Supervisors & per the heat stress policy of drink water / juices regularly. 07 days Project manager,
Engineer etc). company to avoid illness caused by ₒ An adequate rest period must be HSE
Extreme hot weather the heat. ensured for workforce during representative,
hot / extreme weather as per the Supervisor and

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 3 of 16


Hazard category Who might be harmed What are you already doing? What further controls/actions Timescal
and hazard and how? are required? es for
further Responsible
actions person’s job
to be title
complete
d
(within …)
condition. The employees working policy / directives issues by foreman
outside / externally may Staff has already been trained in concerned authorities.
Inadequate welfare get affected due to bad / First Aid to understand as well ₒ Rest areas must be ensured at
facilitates. extreme weather familiar the signs / symptom of the the site at suitable locations.
ₒ First Aid room must be available
condition like Heat stress, heat related sickness.
for the treatment of the injured &
Heat stroke, Muscles ill workforce.
cramps ; Dehydration etc. ₒ Appropriate information,
Instructions, training &
supervision must be ensured for
workforce.
Work on Live traffic Employees, Operators, Obtaining of access permit in ₒ Barriers must be available / 30 days
road: Public, Passenger and accordance with local & project traffic ensured with adequate traffic Project manager,
property damage. requirement is in practice where deems warning lights. HSE
Crossing of the road, Workforce who works on necessary. ₒ Traffic marshaling teams must representative,
the road with moving / live be assigned in order to guide / Supervisor and
traffic or working nearby the If any activity required close to the live foreman
Controlling the traffic on road; an adequate control traffic adequately.
vehicles, moving vehicles / machinery ₒ Activities; pedestrian walkway
may get injuries / fatality coordination with project traffic
management & local traffic police is and equipment routes must
during passing the live
Machines as well as ensured. be separated properly from
traffic road.
activities nearby the Human life’s loss or severe Suitable relevant road & work signage live traffic by placing barriers
road. property loss / damage may as well lights / LEDs strips are provided & adequate road safety
occur due to collision of at suitable feasible display points / signage.
Moving machinery / locations. ₒ Workforce shall be permitted
Vehicles. to carry out activity within the
barricaded area only.
ₒ Walk men / banks-men shall
be assigned whole the time till
activities on going.

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 4 of 16


Hazard category Who might be harmed What are you already doing? What further controls/actions Timescal
and hazard and how? are required? es for
further Responsible
actions person’s job
to be title
complete
d
(within …)
Excavation: Workers, Operators, The reviewed excavation permit are ₒ Excavation location must be
Bandsman, supervisor, in practice in accordance with barricaded adequately and Construction
visitor and property excavation situation of the. should be minimum 1.8 meter 07 days manager.
Cave in; damage. away from the edge. Site Engineer.
Supervisor and
Contact / strike with An adequate / competent
Suitable safety / warning signage foreman.
buried utilities Workforce can get injured supervision is ensured at excavation must be displayed. Site safety
services/ sewerage seriously or fatality may site. ₒ Excavated soil or any materials representative.
Pipelines; lice power occur because of must be placed away minimum
cables etc damage of buried utilities Excavated location has been at a distance of 1m from the
Fall of Excavated (heavy/ main sewerage marked / barricaded along with edge.
mud / materials/ live; power cables which appropriate safety signage. ₒ
equipments or any may cause electrocution ₒ Excavation must protected be by
object on workforce. during excavating GPR scanning is ensured by use of shoring or benching
Unstable adjacent activity. competent person before to start the methods or excavations must be
sloped adequately if depth
building / structure. digging activity in order to locate the
exceeds more than 1.2 meter.
Contact of Collapse of excavation buried utility services /lines. ₒ Access ladder must be ensured
excavating may cause serious injury Locations of all detected utilities on every 25 feet on lateral travel.
machinery with or equipment damage. services / lines have been marked ₒ A competent person is to be
overhead power Work force may get with the depth of utilities. assigned to carry out inspection
lines. injured due to in Experienced & well trained according to daily excavation
appropriate access, operators assigned for excavation checklist.
activity as well as 3rd party ₒ Appropriate PPEs must be used.
certification of operators and ₒ Newly assigned supervisor on
equipment has been ensured. excavation site; must review
Manual excavation was carried out the work permits, Existing
until utilities services / cables or pipe utilities drawing and scanning,
lines found visible. and Geotechnical reports etc.
Adequate access is ensured.
Competent; experienced & well trained ₒ A competent / trained person

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 5 of 16


Hazard category Who might be harmed What are you already doing? What further controls/actions Timescal
and hazard and how? are required? es for
further Responsible
actions person’s job
to be title
complete
d
(within …)
Working in confined Any person working work force is assigned for activity must be assigned as confined 07 days Project manger
space: inside confined space ongoing in confined space. space attendant / watcher; HSE team
can be affected (serious Confined space work permit is issued who should not be detailed for Engineer
Lack of oxygen injury; fatality; along with effective tool box talk training any other task / activity. Supervisor
(suffocation) regularly. Confined space entry
unconsciousness & ₒ Confined space attendant is Attendant
Excess of oxygen procedure is implemented effectively.
Deficient natural light serious illness etc Oxygen / other toxic gaseous test is to be in contact with workforce Workers who
Toxic gases conducted daily before to start activities working inside confined space work in confined
Slip / Tripping inside confined space. & must watch / monitor space.
Fall ; fire / explosion; The confined space is kept ventilated by activities are going inside
Hot working condition; use of exhaust fan. confined space.
Dust; Electrocution; Adequate illumination is ensured. ₒ Gas testis to be carried out
Every person working inside confined after every 30 minutes.
space is equipped with full body ₒ Use of appropriate /
harness with no lanyard. serviceable (damage free)
An adequate mean of access / egress
PPEs must be ensured.
is ensured.
A tripod, stretcher; first aid kit etc are ₒ Confined space attendant
made available according to Emergency under no circumstance is
rescue plan of confined space. allowed to enter inside the
confined space.
ₒ If there is any emergency
inside / outside confined
space; workforce is required
to be taken out of confined
space.
ₒ The confined space attendant/
watcher is required to make
attempt to take the workers
outside from confined space
by using the extraction tripod

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 6 of 16


Hazard category Who might be harmed What are you already doing? What further controls/actions Timescal
and hazard and how? are required? es for
further Responsible
actions person’s job
to be title
complete
d
(within …)
& harness.
ₒ The attendant will immediately
inform the company
emergency response team.
Moving Equipment & 3rd Party certification is carried ₒ No any person is allowed to 30 days
Machinery in site: Workforce as well assets accordingly for all relevant stay / or work nearby / under the Project Manager,
around/ nearby equipment. equipment while equipment’s Site Engineer,
Struck / hit by moving Competent / trained & 3rd party operation is ongoing. Safety
equipment / Serious injury / fatality or Representative .
certified operators are assigned to ₒ
machineries. damage to the assets Supervisor
carry out the tasks.
Crush in between
Operators carry out the daily visual
ₒ Pedestrians’ walkways are to be Operators.
machinery / moving kept away / separated from the
equipment. inspection in accordance with check route of plants & machinery to
Contact with power list and inspection record is avoid accident / collision.
energized cables. maintained accordingly. Flag men
Tripping over of moving are assigned with moving
ₒ Work area shall be barricaded /
equipment /machinery. marked suitably along with
equipment (excavators; mobile display of relevant warning /
Fall of unsecured loads cranes; graders or fork lifter etc to
while lifting. cautionary safety signage to
ensure the safe operation. prevent / control unauthorized
Working / operation of equipment is entry / persons.
ensured minimum at a distance not ₒ Safety induction must be
less than 2 meters form the ensured for all operators and
excavation edges. workers prior to start activity /
operations.
ₒ Safety talk shall be conducted
prior to work.
ₒ Appropriate PPEs must be worn.
Manual & Mechanical Operators, Rigger, Banks Handling / loading & unloading is ₒ Contents of risk assessment
handling: man and those who are ensured by assigning competent / must be explained / 30 days Engineer

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 7 of 16


Hazard category Who might be harmed What are you already doing? What further controls/actions Timescal
and hazard and how? are required? es for
further Responsible
actions person’s job
to be title
complete
d
(within …)
working around / involved in experienced supervisors/ workforce by communicated to the team Supervisor
Improper manual manual handling. safe system of work. involved in handling activity. Safety
handling posture. Work permit system is effectively in Representative
Crane over turn / Fork Due to improper posture; practice. ₒ Loading / unloading area must Operators.
lift toppled due to over while manual handling be kept cordon off along with Rigger.
exceeding lifting limit. activity; involved persons Equipment used in lifting / loading or display of relevant signage. Banks man.
Materials fall. may suffer:- unloading are certified by 3rd party. Workers involved.
Mechanical failure. Musculoskeletal disorder ₒ Visual inspection of equipment
like sprain & strain injury in must ensured by operator &
legs; arms or body joints record of the inspection is to be
etc. maintained accordingly.
Fall of loads being lifted ₒ Loads must be secured.
may cause serious injury /
fatality
ₒ Tag line is to be used to keep the
load stable / easy handling and
control.
ₒ Nobody is to be allowed under
the suspended load in exclusive
zone.
ₒ Adequate manual handling
techniques / procedures are to
be followed.
ₒ Use of appropriate PPEs must
be ensured.
Hand held Power Operatives & workforce Inspection for hand & power tools is ₒ Visual inspection must be
tools: working nearby. ensured as well color coding is also in ensured before start the activity 1 Week Engineer
Flying objects / particles of practice. by hand powered tools. Supervisor
Use of inappropriate & broken disk / fly wheel of Trained operatives are assigned to Safety
defective/ damaged grinder / cutter machine carry out activities by use of the power ₒ Lay out of Extension cords must Representative
tools poor standards & may cause injury to the tools. be arranged adequately to avoid Involved workers.
quality of tools may workforce / operatives in Permit to work system is in practice. contact with any metal structure

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 8 of 16


Hazard category Who might be harmed What are you already doing? What further controls/actions Timescal
and hazard and how? are required? es for
further Responsible
actions person’s job
to be title
complete
d
(within …)
cause hazards like surrounding areas. Use of appropriate PPEs is ensured. that may conduct current like
Projectiles contact scaffolding etc.
(pushed by) vibrations; ₒ Ensure that safety devices like
heavy noises & gripping Handle, Safety guard
entangles etc. etc are missing from the power
Electrocution may tools..
cause by use of poor /
damaged power tools. ₒ Always ensure that right tool is
Slip / trip / fall by used for the right job.
Extension cords lying ₒ Appropriate PPEs must be used
on ground. like gloves, Face-shield,
Goggles, Ear plug/ Muff and
protective clothes etc.
There workers who are Working at platform / Scaffolding must ₒ Visual inspection of working at
Working at Height workforce on elevated be erected by competent person. height platform is to be ensured Project manager
(Elevated platform): platform/ working at height by competent person before to 1 Months Engineer.
Personnel Injuries / It is ensured that no component / part start the activity. HSE
fatality or assets Workforce underneath like Sole board, base plate, toe board, representative
damaged may cause Supervisors; Foremen; Top & mid rails; bearers or ledgers etc ₒ A ration of 1:2 is to be Supervisor.
due to :- Engineers or Visitors etc. is missing / damaged. maintained between height and Inspector.
Falling from height base width. If this ratio is not
(fall of persons / or Adequate mean of access / egress is to possible due to any reason;
falling of objects be ensured with working at height scaffolding structure must be
/material. platform. secured / anchored with a
Tagging system is ensured by scaffold building structure or outriggers
Collapse or overturning inspector. are to be provided as the case
of working platforms / Wearing of full body harness by may be,
scaffolding workforce is ensured. ₒ Daily safety inspection must be
Electrical contact with ensured by competent scaffold
overhead energized Permit for working at height is in inspector in accordance with
power cables practice. checklist and a record is to be

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 9 of 16


Hazard category Who might be harmed What are you already doing? What further controls/actions Timescal
and hazard and how? are required? es for
further Responsible
actions person’s job
to be title
complete
d
(within …)
maintained accordingly in this
record.
ₒ Only trained / competent
personnel are to be assigned to
carry out activities on elevated
platform.
ₒ Appropriate safety signage must
be displayed like Full body
harness required, over head
activity, Falling object hazard
sign etc.
Load Handling Workforce working nearby. Operators certified by 3rd party ₒ Load must be secured properly. Project manager
Equipment: Riggers approved by Saudi government. Tag-line must be used to ensure 1 Month Engineer
Falling objects. Operators Riggers have valid competency card . load stability as well easy Supervisor
materials Supervisors Crane & lifting accessories are handling. HSE
Mechanical failure. Engineers inspected / verified by 3rd party. Operator &
Suspended load. Lifting area is barricaded and relevant ₒ Nobody is to allow carrying out rigger.
Crane turn over. safety signage displayed. any activity under boom radius or
Contact with over head Lifting plan is followed and work permit suspended loads.
energized power-lines. is issued, ₒ Only certified rigger is to be
High wind speed assigned for signaling to the
Ground unstable. operator.
Mentioned hazards
may cause Injury or
ₒ Equipment maintenance record
fatality, assets damage should be maintained.
As well electrocution ₒ Visual inspection must be
due to crane boom hit ensured before starting the
the over head power activity.
line. ₒ 360 Degree hazard analysis shall
be carried out before lifting

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 10 of 16


Hazard category Who might be harmed What are you already doing? What further controls/actions Timescal
and hazard and how? are required? es for
further Responsible
actions person’s job
to be title
complete
d
(within …)
operation.
ₒ Anemometer must be provided &
operation is to be stopped if wind
speed is more than 32 km/h.
ₒ Tool box talk should be conduct
prior to work.
Waste management: Everyone working / All hazardous and non hazardous ₒ
present in the vicinity wastes are being segregated properly. 1 Month Project Manager
Accumulation / pile ₒ Removal of Waste must be Site Engineer
stock or inadequate ensured from the site regularly / Environmental
disposal of properly. coordinator
miscellaneous wastes ₒ A well reputed party is to be Supervisor.
may cause hazard hired for removal of hazardous
like:- wastes..
Fire; corrosive;
inflammable; explosive
ₒ Appropriate Labeling or signage
or may react if must be provided with containers
exposure to other to indentify the type of waste.
materials. ₒ Waste management record shall
Waste may cause be maintained.
Health related illness
like air born diseases.
Air pollution, or Soil
contamination etc

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 11 of 16


Part 3: Priorities 3 actions with justification for the selection
Suggested word counts
Moral and financial arguments for all actions: 300 to 350 words
For EACH action:
Specific legal arguments: 100 to 150 words
Likelihood AND severity: 75 to 150 words
How effective the action is likely to be in controlling the risk: 100 to 150 words

Moral and financial arguments for ALL actions

Moral, general legal and financial Moral:


arguments
The Al Bawani.co has morally responsible to ensure that a safe and sound environment has been
provided to the workforce in order to work safely as well can return to their home / family safely every
day. The operation of the company are executed all the time in such manner so as to ensure as for as
reasonable practice. The health and safety at work for the company employees and all personnel
including sub-contractors and member of the public who may be effected by company operation. All
people have families at back home to support and provide them a good quality education and health.
That’s why they choose to carry out work with Al Bawani.co for earning money to support the families. If
something will go wrong it will direct effect to their families and dependents. That’s the reason Al Bawani
takes care their employees’ health and safety and gives highest priority to their protection.

Legal:
Saudi labor law (Royal Decree M/21) section one Protection against occupational hazard under the
article # 121 An employer shall provide well clean and hygienic welfare facility and comply with other health
and safety standards.
Article 122 an employer is responsible to take necessary precaution to protect the workers from hazard , ill
health and machinery and insure safe system of work.
There are some important requirement which Al Bawani need to meet under ILO ( C-155& R164)
International Labor organization has set out the C167 1988 health and safety convention apply on all
construction activity.
ILO International labor organization has set the convention and recommendation C155& R164 employer is to
provide a safe place of work , safe plant and safe system of work.

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 12 of 16


Financial:
In case of accident the company has to bear several losses in term of finance. The financial effect
can be divided in the following four categories.
ₒ Dealing with victim, Medical cost and sick pay.

ₒ Repaired and replacement of equipment, tools and properties.

ₒ Compensation; Cost of enforcement action by local authority, financial deduction.

ₒ Bad influence on company reputation in the market.

Justification for action 1

Action Excavation: Ensue shoring, benching or appropriate slope while the depth of excavation is 1.2
meter or more.
Specific legal arguments ILO legislation of convention C167 safety and health in construction 1988. Adequate precaution
should be taken and secured by mean of proper shoring; benching / Sloping in order to avoid
excavation collapse. Appropriate barricade shall be provided around the excavation to prevent
human bodies and equipment fall.
Consideration of likelihood AND severity The likelihood which occurring form the excavation will be quite high because of damage
underground services. The worker near the excavation or inside the excavation can get serious
injury or die due to excavation collapse.
How effective the action is likely to be in
By recommended precautionary measures the risk level will be reduced to acceptable level.
controlling the risk. This should include:
Provision of benching, shoring and proper slopping will minimize the likelihood of collapse of
 the intended impact of the action; excavation.
 justification for the timescale that you Without providing proper benching, shoring and slopping system collapse of excavation may result
indicated in your risk assessment; into severe injuries and fatality of workers. But after providing with benching, shoring and slopping
and methods; these hazards are got minimized significantly. Converting such kind of severe risks up to
 whether you think the action will fully acceptable level or to minor injury is reflecting effectiveness and usefulness of the given control
control the risk. measures.
One week time scale is recommended to provide proper benching, shoring and slopping to all of the
excavations because this is enough time to provide the required actions.

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 13 of 16


Justification for action 2

Action Moving equipment: No worker is permitted to stay nearby or under the equipment during
operations.
Specific legal arguments Occupational Safety & Health recommendation 1981 (R164)
Dangerous parts of the machinery while carrying out operations must be fully secured and safe
also, it must be ensured that they are placed and fitted in the right positions and are intended for
the machinery use.
Consideration of likelihood AND severity The frequency of risk bit highly dangerous while workers are working under the suspended load
during the lifting activity; also workers are working near the moving machinery.
The severity of the incident would be very high as it may cause serious injury even fatality also it
may lead to equipment and property damage.
How effective the action is likely to be in
ₒ The provision of safe exclusive lifting zone for the lifting operation may minimize the risk level.
controlling the risk. This should include:
ₒ By Segregation of pedestrian walkway and equipment route the chances of collision of workers
 the intended impact of the action; and equipment will be eliminated.
 justification for the timescale that you
indicated in your risk assessment; ₒ By provision of guards for the moving parts of the machinery will reduce the pinch point,
and entanglement, trapping in, stuck by, abrasion and frictional incidents.
 Whether you think the action will fully Recommended time scale is 1 month for providing the concrete barriers for segregation of moving/
control the risk. heavy equipment and pedestrians’ walkway.

Justification for action 3

Action Confined Space :One competent and trained worker would be designated for the confined space
attendant/ hole watcher.
Specific legal arguments According to the confined space regulations 1997,#1713 hole watcher must be there for the sake of
communications.

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 14 of 16


Nobody is allowed to work in the confined space without a valid entry permit.
Before entering the confined space atmospheric testing must be carried out.
Only competent and well trained worker would be allow to carry out the activity in the confined
space.
Consideration of likelihood AND severity The likelihood of the incident is high as the entrant is working in hazardous atmosphere
ₒ If Incompetent or untrained workers would be allow to carry out activity in confined space.
ₒ If no gas testing is carried out.
ₒ If there is no attendant to supervise the activity and effective communication with the entrants.
This unsafe action or ignorance of any of above could lead to a sever incidents or fatality.
How effective the action is likely to be in
After providing the competent entrants, attendant, gas testing and valid permit system will highly
controlling the risk. This should include:
effective for the activity.
 the intended impact of the action; The worker carrying out activity inside the confined space will be safe with provision of said
 justification for the timescale that you requirements.
indicated in your risk assessment;
and Recommended given time scale is 1 Week as it will take time to take approval from the project
 whether you think the action will fully manager and to arrange the training session for the entrants, attendant and procurement of the
control the risk. CSE rescue equipment.
After taking all the recommended safety precautions it will be highly effective and will reduce the
risk level.
Part 4: Review, communicate and check
Suggested word counts for each section:
 Planned review date or period and reasoning for this: 50 - 100 words
 How the risk assessment findings will be communicated and who needs to know the information: 100 - 150 words
 Follow up on the risk assessment: 100 - 150 words.

Planned review date/period with As per the company policy the risk assessment will be review after a period of 12 months that is 10th
reasoning February 2022. Or RA would be review if any of the following conditions.
ₒ In case of any accident
ₒ If layout plan changes
ₒ If required by the client

Learner number: 00572121 Learner name: Mirza Khalid Baig Page 15 of 16


ₒ New amendment in the Govt Law.
ₒ Change in technology.
How the risk assessment findings will be It will be communicated the findings of Risk Assessment with project manager and will schedule a
communicated AND who you need to tell meeting with project director, a briefing will be deliver to him regarding risks exist at site and
recommendations proposed. A copy of the Risk Assessment will be handed over to the concern
supervisor and communicate with workers in Tool Box Talk, also a copy of Risk Assessment would
be in the permit box at site and translated Risk Assessment in multiple languages; will be display on
the notice board for better understanding and communications. Risk Assessment would be
uploaded on the company’s official website for the visitors.
How you will follow up on the risk For follow up; a meeting will be called and will be discussed with the responsible people for their
assessment to check that the actions prompt actions and time scales to fulfill the proposed requirements. Myself will follow up the
have been carried out progress by recording in my documented records which actions have been taken place and which
left to be fulfill and when they will be provided by the management and so on. For the financial and
procurement related issues I will conduct a meeting with the finance and procurement directors to
issue the funds and let the proposed requirements be met in order to avoid any incident or
unpleasant events at project. I will check if any proposed action yet not completed in the given time
scale, it would be directly discussed with the project director.