Professional Documents
Culture Documents
20.SRU Sulphur Pit LV930 Upstream Strainer Replacement.
20.SRU Sulphur Pit LV930 Upstream Strainer Replacement.
Department/Section doing JSA: Descon Planning JSA members: Abu Tali Naqvi, Imran ul Haq
Job Area/Location: Process & SRU Area Job performers: Descon Plant Services
NORMAL APPROVALS: POSITION Name Staff No Signature Date General Job Requirements/ Common PPE
JSA by: - Coveralls (Nomex Delta C).
Job Supervisor: - Safety Helmet .
EXTRA ORDINARY APPROVALS (ONLY IN VERY SPECIAL CASES REFERRED BY A JOB SUPERVISOR): - Safety Boots (Long, Soles not flat)
Discipline Superintendent - Safety Glasses.
Safety Representative - Face visor.
Any Other Approving Authority - Hearing Protection.
- Leather Glove.
- Gas Alert Clip.
- Pre-Start Toolbox Talk.
Sequence of Basic Job Steps Potential Hazards Risk Recommended safe working practices /procedures/
(Number them with description, write duration) Hazard Control methods/ PPE
Rank
1. Isolate the strainer by closing upstream and 1.1Passing Valve. H 1.1.1 Make sure that the valves are tightly shut /
down stream drain valves. closed. Lock the upstream and down stream valves in
closed position.
2. Remove and flanges on one drain. 2.1 Splash of hot liquid Sulphur. H 2.1.1 Use long boots and face visor and Leather hand
gloves.
2.1.2 To open flange, loosen bolts which are away
from body and confirm no leak.
2.2 Solidified Sulphur lump on flange. L
2.2.1 Chances of passing valve. Stop the job. Inform
your Supervisor.
4. Remone end flange on other drain. 4.1 Same as step 2. 4.1.1 Same as step 2.
5. Open the respective drain valve slowly. 5.1 Same as step 3. 5.1.1 Same as step 3.
6. Open the strainer’s top cover very slowly. 6.1 Splash of hot liquid Sulphur. H 6.1.1 Use leather gloves and face visor.
7. Remove and strainer and replacement with a 7.1 Burn hazard. M 7.1.1 Remove the strainer basket by using wire with
new one check the ‘’O’’ ring and replace if find hook at the end. Use leather hand gloves and face
damage. visor.
8. Tighten the cover after replacing the strainer 8.1 Finger injury. L 8.1.1 Leather gloves.
basket and ‘’O’’ ring (if required).
8.2 Leak from the drain flange L 8.2.1 Ensure the drain valves are properly isolated
If leak persists, confirm the drain valve is passing.put a
prominent tag on it and raise a notification to repair it
8.2.2 Retighten the flanges as per procedure.
9. Fix back the end cover and close the drain 9.1 Valve not fully closed. L 9.1.1 Ensure valve are tightly closed.
valves slowly.
10. Tighten the end flanges. 10.1 As per procedure 03.20.20.03 L 10.1.1 As per procedure 03.20.20.03 (Fixing back
(Fixing back flange and bolt tightening). flange and bolt tightening).
11. Re-commission the line by opening the 11.1 Leak from the strainer cover. L Follow the above steps from 1 to 4.
isolation valves slowly.
Note: 1) If any of the tasks involves biological, physical or chemical hazards, then Industrial Hygienist must also sign this Form, against “Any Other Approving Authority” above.
2) If steps in a job are more than the space provided above, use a photocopy of this sheet to continue on the next page.
3) Details on safety (PPE, Hazard etc) and environmental requirements can be found in Safety & Environment Procedures available from the Intranet/Documents & Standards.
Qatar Liquefied Gas Company Limited
JOB SAFETY ANALYSIS RISK SUMMARY SHEET
MEDIUM RISK 1 Remove and strainer and Burn hazard Remove the strainer basket by using
replacement with a new one wire with hook at the end. Use leather
check the ‘’O’’ ring and replace hand gloves and face visor.
if find damage.
LOW RISK 1 Remove and flanges on one Solidified Sulphur lump on flange Chances of passing valve. Stop the
drain , Remove end flange on job. Inform your Supervisor.
other drain.
2 Tighten the cover after Finger injury. Leather gloves.
replacing the strainer basket
and ‘’O’’ ring (if required).
3 Tighten the cover after Leak from the drain flange Ensure the drain valves are properly
replacing the strainer basket isolated
and ‘’O’’ ring (if required).
If leak persists, confirm the drain
valve is passing.put a prominent tag
on it and raise a notification to repair it
, Retighten the flanges as per
procedure
5 Tighten the end flanges. As per procedure 03.20.20.03 (Fixing As per procedure 03.20.20.03 (Fixing
back flange and bolt tightening back flange and bolt tightening).
6 Re-commission the line by Leak from the strainer cover. .1.1 Make sure that the valves are
opening the isolation valves tightly shut / closed. Lock the
slowly. upstream and down stream valves in
closed position, Use long boots and
face visor and Leather hand gloves ,
To open flange, loosen bolts which
are away from body and confirm no
leak , Chances of passing valve.
Stop the job. Inform your Supervisor ,
Use long boot and face visor, leather
hand gloves and a fender between
yourself and the drain valve at ground
level , Continuously run water hose
gently under the drain to cool down
hot Liquid Sulphur , Close the valve,
Stop the job and report the supervisor
, Reassess the job , Close the
valve , De-plug the drain , Open the
valve