Department/Section doing JSA: Descon Planning JSA members: Abu Tali Naqvi, Imran ul Haq
Job Area/Location: Process & SRU Area Job performers: Descon Plant Services
NORMAL APPROVALS: POSITION Name Staff No Signature Date General Job Requirements/ Common PPE
JSA by: - Coveralls (Nomex Delta C).
Job Supervisor: - Safety Helmet .
EXTRA ORDINARY APPROVALS (ONLY IN VERY SPECIAL CASES REFERRED BY A JOB SUPERVISOR): - Safety Boots (Long, Soles not flat)
Discipline Superintendent - Safety Glasses.
Safety Representative - Face visor.
Any Other Approving Authority - Hearing Protection.
- Leather Glove.
- Gas Alert Clip.
- Pre-Start Toolbox Talk.
Sequence of Basic Job Steps Potential Hazards Risk Recommended safe working practices /procedures/
(Number them with description, write duration) Hazard Control methods/ PPE
Rank
1. Confirm equipment Isolation and 1.1 Improper Isolation can need to unsafe H 1.1.1 Confirm with operations and check the Tag No.
Depressurisation from process by operation. working condition for equipment and
Personnel.
2. Hold the valve with chain block and the remove 2.1 Handling Injury. L 2.1.1 Maintenance manual handling techniques.
the valve.
2.2 Slip / Fall. H 2.2.1 Good Housekeeping.
2.3 Gas release from the flange. H 2.3.1 Loose the flange slowly.
2.4 Trapping Finger. M 2.4.1 Use proper gloves and tools.
3. Blinding / De-Blinding. 3.1 Gas release. H 3.1.1 Close the flanges slowly.
3.2 Manual handling Injury. L 3.2.2 Maintain manual handling techniques.
MEDIUM RISK 1 Hold the valve with chain block Trapping Finger.
and the remove the valve, Hold
the valve with chain block and
fix back the valve.
LOW RISK 1 Hold the valve with chain block Handling Injury.
and the remove the valve,
Blinding / De-Blinding, Hold the
valve with chain block and fix
back the valve.