Sl No Hazard Mitigation
1. Maintain proper housekeeping at work area.
2. Follow designated pathway and staircase while going to and from Control Room for work permit issuance.
1 Slip trip and fall at the work area 3. Always maintain 3 Point contact while using any staircase.
4. Remain mindful of the debris accumulated in the staircase.
5. Keep all required spares at a designated place at job site and barricade the working area.
1. Use of Dust Mask is Mandatory
2. Work to be started only after emptying the belt.
2 Dust Hazard
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
1. Safety Induction SAFETY: Safety Supervisor ➢ Briefing of the hazards to regarding the area and Trained people
➢ Requirement: Awareness of & supervisor about the job. should be involved in
safety rules, Job hazards, work ➢ Use of safety appliances during the work such as Job
knowledge, use of safety (Safety shoes, Safety Jacket Hand Gloves, safety
appliance, rules about working at Helmet, safety Goggles, Dust Masks).
height, rules about working at Refer safety standard
dusty area, rules about SS/ENGG-58 for use
firefighting. of PPE
ENVIRONMENT:
➢ Fine dust.
QUALITY:
➢ Ensure proper Positive Isolation.
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Safety Safety Safety Florescent Safety Ear Plug Co Detector Dust Mask Positive Isolation
Helmet Shoe Goggles Jacket Gloves Lock
[Please [Please
Mention] Mention]
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
2 Engagement of Requirements: Safety 1. Job should be carried out under the supervision of expert Supervisor. Follow standard:
Manpower Trained People Supervisor 2. All persons must have Six days training and PME Certificate. EHSMSM/
& supervisor 3. Work Permit should be obtained in prescribed format WORKS/446/4007
4. 6-directional hazard must be identified and fill-up in work permit.
ENVIRONMENT:
➢ NA
QUALITY:
➢ NA
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
3 Pre Start - Up Job SAFETY: Supervisor 1. Safety induction training by safety supervisor and site in charge Trained people should
Activities ➢ Injury during the must be given to workers before starting the job. be involved in job.
handling of Tools & Follow the SS/GEN –
tackles 2. Following tools and tackles which is require to executing the job 58 for personal
ENVIRONMENT: must be accumulated in the working zone area. protective
➢ Dusty Area equipment’s standard.
SL. Tools & Tackles Capacity/ Size Nos.
QUALITY:
No.
➢ Condition of Tools
1 Spanner M24- M32 As
and Tackles
requi
red
2 T4 As
requi
red
3 Chain block 1T, 2T, 3T
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :