Sl No Hazard Mitigation
1. Maintain proper housekeeping at work area.
2. Follow designated pathway and staircase while going to and from Control Room for work permit issuance.
1 Slip trip and fall at the work area 3. Always maintain 3 Point contact while using any staircase.
4. Remain mindful of the debris accumulated in the staircase.
5. Keep all required spares at a designated place at job site and barricade the working area.
1. Use of Dust Mask is Mandatory
2 Dust Hazard
2. Work to be started only after emptying the belt.
3 Dos and don’ts at working site Do's Don’t
Enter area with mandatory PPE . Do not start job until Proper isolation if required.
For pulling old or new belt use good quality manila rope. Don’t stand near the belt stand.
Use hand gloves before start jobs. Don’t touch any electric cable.
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 022 Revision No. 00 Effective Date 20/06/2020
SOP Description: Conveyor Belt Replacement Section WASHERY 3
Department :CB Page Page 2 of 11
1. Safety Induction SAFETY: Safety Briefing of the hazards to regarding the area Trained people
Requirement: Awareness of safety Supervisor and about the job. should be involved
rules, Job hazards, work knowledge, & supervisor Use of safety appliances during the work such as in Job
use of safety appliance, rules about (Safety shoes, Safety Jacket Hand Gloves, safety
working at height, rules about working Helmet, safety Goggles, Dust Masks).
at dusty area, rules about firefighting. Refer safety
standard SS/ENGG-
Hazard: Unawareness about the area, 58 for use of PPE
Slip trip & fall hazard, dusty
environment.
ENVIRONMENT:
Flying fine dust.
QUALITY:
Ensure proper Positive Isolation.
Safety Safety Safety Florescent Safety Ear Plug Co Detector Dust Mask Positive Isolation
Helmet Shoe Goggles Jacket Gloves Lock
Mention] Mention]
During On Job √ √ √ ×
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 022 Revision No. 00 Effective Date 20/06/2020
SOP Description: Conveyor Belt Replacement Section WASHERY 3
Department :CB Page Page 4 of 11
2 Engagement of Requirements: 1. Job should be carried out under the supervision of expert Supervisor. 1. Follow standard:
Manpower Trained People Officer 2. All persons must have Six days training and PME Certificate. EHSMSM/
Forman WORKS/446/4007
Contractor 3. Work Permit should be obtained in prescribed format
Supervisor 4. 6-directional hazard must be identified and fill-up in work permit.
ENVIRONMENT: NA
QUALITY: NA
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 022 Revision No. 00 Effective Date 20/06/2020
SOP Description: Conveyor Belt Replacement Section WASHERY 3
Department :CB Page Page 5 of 11
3 Pre Start - Up SAFETY: Supervisor 1. Safety induction training by safety supervisor and site in
Job Activities Injury during the charge must be given to workers before starting the job. 1. Trained
handling of Tools & people should
tackles be involved in
2. Following tools and tackles which is require to executing job. Follow
the job must be accumulated in the working zone area. the SS/GEN –
58 for
ENVIRONMENT: personal
SL. Tools & Tackles Capacity/ Size Nos. protective
Dusty Area
No. equipment’s
QUALITY: 1 Spanner M24, M26, M 16, As standard.
Condition of Tools and M21- M23 requ
Tackles ired
2 Hammer 1 Kg/2 Kg As
requ
ired
3 Chain Block 2T, 3T, 5T As
requ
ired
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 022 Revision No. 00 Effective Date 20/06/2020
SOP Description: Conveyor Belt Replacement Section WASHERY 3
Department :CB Page Page 6 of 11
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 022 Revision No. 00 Effective Date 20/06/2020
SOP Description: Conveyor Belt Replacement Section WASHERY 3
Department :CB Page Page 7 of 11
QUALITY:
NA
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 022 Revision No. 00 Effective Date 20/06/2020
SOP Description: Conveyor Belt Replacement Section WASHERY 3
Department :CB Page Page 8 of 11
QUALITY:
Cleaning of joint
portion. Solution
should be properly
dried up. During
pasting of both joint,
carefully match both
parts.
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 022 Revision No. 00 Effective Date 20/06/2020
SOP Description: Conveyor Belt Replacement Section WASHERY 3
Department :CB Page Page 9 of 11
8 Conveyor take up SAFETY: Contractor 1)After two hours, release the chain block and remove the
release Careful during using Supervisor/ Dept clamp by opening the bolt using 24-26mm ring & ‘D’ spanner.
spanners, pinching representative/ First release clamp & chain block near joint portion then counter
of fingers, carefully Contractor employee weight side.
handle heavy 2) Take out clamp carefully.
materials, Do not 3) Now open head end side clamp.
handle slings with 4) Remove and clear all the materials from the conveyor system.
bare hand. 5) Handover the conveyor for checking.
ENVIRONMENT:
NA
QUALITY:
NA
9 Return work SAFETY: Contractor 1) Ensure all the jobs are completed and no man with tools /
permit NA Supervisor/ Dept tackles are near the work area..
ENVIRONMENT: representative/ 2)Any scrap should be removed and put that in designated scrap
NA Contractor employee yard.
QUALITY:
NA
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 022 Revision No. 00 Effective Date 20/06/2020
SOP Description: Conveyor Belt Replacement Section WASHERY 3
Department :CB Page Page 10 of 11
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 022 Revision No. 00 Effective Date 20/06/2020
SOP Description: Conveyor Belt Replacement Section WASHERY 3
Department :CB Page Page 11 of 11
SOP MADE BY: INDRANIL GHOSH (ASST. MANAGER) SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :