1-Feedback For The STR Drawing
1-Feedback For The STR Drawing
Name: BAUNIA ABDUL JALIL HIGH SCHOOL ID: 4677271139-sub Date: 2021 - 8 - 8
12 Are gridlines and column orientation compatible in all Str plans ad also are they compatible with Arch plan? 1
126 Show the location of reservoir tank (if exists) with picture. Show the inlet point with picture at reservoir tank N/A
(if possible)
127
Show the pump with specifications and pictures. If there is a submersible pump show the location with picture.
128 Show the route of piping to over head tank from reservoir with pictures and elevation. Show the route of piping
in elevation drawing
129 1
Show each
Show the distribution lineat(if
point of inlet wetexposed) to every
areas with heightwet areaspoint,
(basin of each floor (washrooms,
bib-cock, push showerbasins) with
etc) from pictures.
floor level with
130 pictures.
Sewage Plan
Horizontal piping over each bathroom where both sewage line connected
131 A sewage plan shall be provided in autocad format in elevation. (both vertical and horizontal piping) with each other with long trap, bend and TEE then horizontally connected
with vertical line which passes sludge to soil stack.
132 Show the sewage line which enters at septic tank with pictures. 1
133 Show the septic tank location with pictures. 1
134 Show the point of each sewage line and waste water evacuation line with pictures at every washroom.
135 A sewage plan shall be provided in autocad format with pictures.
136 Exposed sewage pipes and size shall be shown with pictures. 1
137 Outlet of sewage of building shall be identified and clearly depicted in the drawings 1
138 Material & specification (size) of all swage pipes shall be clarified
139 Sewage inlet and outlet of wet are like toilets shall be clearly presented in the drawings 1
140 Location of specification of sewage pump shall be shown with picture (if exists) N/A
Down Pipes and rain piping systems (Drainage Plan)
141 Location of all floors drain & rain drain shall be shown with pictures.
142 Location & material and specification of all rain drain piping shall be clarified
Horizontal piping over each bathroom is missing. No detailing of horizontal
143 0
piping.
A complete plan of drainage system at the site for both rain and sewage system shall be provided.
144 Location of clean outs shall be shown with photos 1
Cooling, Heating and Fire Fighting N/A
145 If exists, the plans for cooling and heating systems shall be provided including HVAC
146 Location of indoor and outdoor AC units, condensers, splits etc… shall be shown (if exist)
147 Location and size of all ceiling fans shall be clarified
148 Exhaust system of toilets shall be clarified
149 Location & size of fire box shall be shown in each floor
EL Drawings
150 Cable routes (In exposed condition) shall be demonstrated in the autocad drawings with pictures.
151 Technical specifications of cables such as the size and watt shall be presented (Cable Picture)
Outlet and inlet of SDB not given. Not even in legend table. No
152 Outlet and inlet of cables of building and MDB SDB shall be presented in the drawings with pictures 0
technical specification given for SDB.
153 Outlet and inlet of cables of wet area like toilet shall be presented in the drawings with cable size
154 Socket outlet plan shall be presented in the drawings with pictures. 0 No socket outlet plan given in drawing.
155 If any more hazerd materials exist mention with picture & location. N/A
156 Fire detection/alarm plan shall be presented through autocad drawings. (if exist) N/A
SDB numbering not done and need specific identification of picture
157 0
All the MDB, SDB picture mention in drawing by locating in layout. of each SDB. Mentioned MDB size in legend not exists.
158 Have sound system and CC camera with picture & location. N/A
159 All electro-mechanical equipments have to show with picture in details
10-Feedback for the NSE
160 NSEs should be provided in excel format and number of the items should be presented 1
161 Compatibility between the Number of the NSEs and the photos 1
162 All the photos should be stored in floor-wise aproach 1
photos should be taken at the locations of anchorage if the elements are not anchored, photos of the gap
163 1
between nonstructural element and the wall/floor should be taken
164 NSE Checklist have to fill up with proper guidline 0
The number of items of each NSE component found in each story should be noted down in the checklist under
165 1
the columns of 1st Floor, 2nd Floor, 3rd Floor and so on.
The dimensions of each component should be measured and incorporated in the checklist in the appropriate
166 box. For example, length,width and height of a table, bench could be measured for dimensions 0
167 The weight of each item should be estimated based on visual observation. 1
Height of the NSEs should be measured either from the ceiling or from the floor and incorporated into the
168 1
checklist in appropriate box.
11-Feedback for the Photos
169 Photograph taken from each side of the structure 1
170 Photograph taken from foundation with measurement 1
171 Photograph taken from All test with grid number and separation joint (if any) with measurement 1
172 Photos of Damaged members and other critical places of the structure 0
Photograph taken from NSEs in each room from six position with mentioning the particular room number in
173 0
each floor
12-Feedback for the FERRO-SCAN
174 For column give all doc : like all scan image, picture of data takeing, gride no in a separet folder 0
175 For beam give all doc : like all scan image, picture of data, gride no in a separet folder 0
176 For slab give all doc : like all scan image, picture of data, gride no in a separet folder 0
177 In structural drawing marks scaning position and give note 20% or type base 1
178 Ferro scan checklist is signed by JV and PIU 1
13-Feedback for the REABER EXPOSE
179 Scan Image data of Rebar exposure position , checklist and picture in a folder. 0
180 All picture must be clear for measurment observation. 1
181 Incorporate the exposure area in structure drawing 1
14-Feedback for the Foundation
182 All picture of foundation must be clear with measurment in a folder 1
183 If excavation is not possible than attach the existing drawing in a folder and give note in footing drawing
184 Check checklist information with section of footing 0
Explanation of QC
Six photos (included two insides, two out sides , front side,and google
2 0
earth) are provided?
3 Is the shape of building in site plan and Arch drawing matches? 0
Is the boundary wall include in site plan with height, length and materials
5
section? 0
6 Are Sewarage system located in site plan with proper direction? 0 LOOK 3/4
Are two section for each building included with site plan marking with
7
section cut lines? 0
LOOK 1/2
Is North direction presented in the plan and all North symbols match
9 0
together?
10 Is separation joint and slab connection presented in the plan with notes? 0
Is the beam dimension and slab dimensions presented correctly and match
15
with frame layout? 0
16 Is the foundation section and grade beam matched with their section? 0
23 OTHERS-1 0
24 OTHERS-2 0
25 OTHERS-3 0
26 OTHERS-4 0
27 OTHERS-5 0
28 OTHERS-6 0
29 OTHERS-7 0
30 OTHERS-8 0
31 OTHERS-9 0
32 OTHERS-10 0
33 OTHERS-11 0
34 OTHERS-12 0
35 OTHERS-13 0
36 OTHERS-14 0
37 OTHERS-15 0
38 OTHERS-16 0
39 OTHERS-17 0
40 OTHERS-18 0
0
NSE
32 NSE Checklist have to fill up with proper guidline 0
LINTEL
37 Are Lintel Id Name Lintel Type presented? 0
g
JV Explanation
1 Column 0
2 Column longsection 0
3 Beam 0
7 Foundation 0
of QC
Date: 2021-08-08
CTURAL Drawing
ation/ Reference JV Explanation
6 Others corrections. 0
Explanation of QC
Date: 2021-08-08
he MEP Drawing
ation/ Reference JV Explanation
Horizontal piping over each bathroom where both sewage line connected
with each other with long trap, bend and TEE then horizontally connected
with vertical line which passes sludge to soil stack.
Exposed wire route not shown in any place whereas there are lots of
exposed wire as per pictures.
No detailing of energy meter. Inlet at energy meter and outlet from energy
meter not given. Technical specification of SDB has not given. Need to
demonstrate in diagram format. SDB need numbering as there are many
SDB.
Outlet and inlet of SDB not given. Not even in legend table. No
technical specification given for SDB.