Feedback of The CT QC: Name: Nubab Habibulah School & College Date: 2021-7-13 ID
Feedback of The CT QC: Name: Nubab Habibulah School & College Date: 2021-7-13 ID
Name: Nubab Habibulah School & College ID: 4677271692-sub Date: 2021-7-13
Sub-C
NO Subject JV QC JV QC Comment Schedio Comment
Desk
12 Are gridlines and column orientation compatible in all Str plans ad also are they compatible with Arch plan?
Sub-C
NO Subject JV QC JV QC Comment Schedio Comment
Desk
120 Check the rebar exposure point (at least three points) and image scan point and cross check the rebar dia with
exposer report
121 Check the 20% ferro scan point in column, beam in all floors
9-Feedback for the MEP
Water Distribution Plan
122 Exposed water piping route, and size shall be shown.
Water supply pipe material will be GI at east side. Others material
123 Material & specification (uPVC,PVC,PPR,CPVC,GI) of piping shall be clarified. specifications are OKAY.
Skipped as per suggestion by POC
124 Inlet (From WASA) of water piping of building shall be identified and clearly depicted in the drawings.
125 Exposed pipe route should be shown in elevation. Skipped as per suggestion by POC
126 Elevation (heigjht) of piping shall be clarified. Skipped as per suggestion by POC
All material and specification is okay as per picture only one material
127 Material & specification of all piping shall be clarified. clarification at east side is not okay. Water supply pipe material will be GI. Skipped as per suggestion by POC
Material of water inlet from WASA is PPR not PVC
128
Water piping inlet and outlet of wet are like toilets shall be clearly presented in the drawings with picture
129 If mechanical room exists, a plan of the mechanical room shall be provided with pictures. N/A
130 Show the location of reservoir tank (if exists) with picture. Show the inlet point with picture at reservoir tank
(if possible)
As there is reservoir tank there must be a centrifugal pump to lift water to
131 Show the pump with specifications and pictures. If there is a submersible pump show the location with picture. over head tank.
Skipped as per suggestion by POC
Show the route of piping to over head tank from reservoir with pictures and elevation. Show the route of piping
132 Skipped as per suggestion by POC
in elevation drawing
139 Show the point of each sewage line and waste water evacuation line with pictures at every washroom. Skipped as per suggestion by POC
140 A sewage plan shall be provided in autocad format with pictures. Skipped as per suggestion by POC
141 Exposed sewage pipes and size shall be shown with pictures.
142 Outlet of sewage of building shall be identified and clearly depicted in the drawings
143 Material & specification (size) of all swage pipes shall be clarified Skipped as per suggestion by POC
144 Sewage inlet and outlet of wet are like toilets shall be clearly presented in the drawings
145 Location of specification of sewage pump shall be shown with picture (if exists) N/A
Feedback of The CT QC
Name: Nubab Habibulah School & College ID: 4677271692-sub Date: 2021-7-13
Sub-C
NO Subject JV QC JV QC Comment Schedio Comment
Desk
173 The weight of each item should be estimated based on visual observation.
Height of the NSEs should be measured either from the ceiling or from the floor and incorporated into the
174
checklist in appropriate box.
180 For column give all doc : like all scan image, picture of data takeing, gride no in a separet folder
181 For beam give all doc : like all scan image, picture of data, gride no in a separet folder
182 For slab give all doc : like all scan image, picture of data, gride no in a separet folder
183 In structural drawing marks scaning position and give note 20% or type base
184 Ferro scan checklist is signed by JV and PIU
185 Scan Image data of Rebar exposure position , checklist and picture in a folder.
186 All picture must be clear for measurment observation.
187 Incorporate the exposure area in structure drawing
Six photos (included two insides, two out sides , front side,and google NOT VISUAL RAFERANCE
2 Corrected
earth) are provided? PICTURES
3 Is the shape of building in site plan and Arch drawing matches? Corrected
Is North direction presented in the plan and all North symbols match
5 DRAWING SUBMITE CAREFULLY Corrected
together?
PROVIDE EVERY
ARCHITECCTURAL
10 Is dimension plans for all floors 1/100 scale presented? ELEMENTS(wall, column etc.) already Skip
DIMENSSIONS AS LIKE WORKING
DRAWING.
Explanation of QC
Is detailed information about wall, floor and ceiling in each room PROVIDE ALL ROOMS FLOOR,
11 Corrected
presented? CEILING & WALL DETAILES
23 Are parapet wall and water tank and roof access presented correctly?
31 LINTEL
Are all column, beam and slab details are based on Ferro
3
results
Are beam rebar details match the ferro scan result and
9
exposure?
ub 7/13/2021
Corrected
Provided OK
Corrected OK
Corrected Not Ok
Corrected Not Ok
Corrected Not Ok
Corrected Ok
Corrected Not Ok
Corrected Not Ok
Input Picture Ok
Explanation of QC