Professional Documents
Culture Documents
Project Name
Project Number
Project Stage
Package
Drawing Numbers
or as attached register
Preliminary As Built
Notes:
1 Tick “Yes” if aspect has been checked or ‘N/A’ if the aspect is not applicable to the document.
MARCH 2019
Drawings Check List
Producer Production
Checker
MARCH 2019
Drawings Check List
Producer Production
Checker
Production
Checker
Comments
MARCH 2019
Drawings Check List
Verification
Checker
(where required)
Verification
Checker
Comments
MARCH 2019
Drawings Check List
Reviewer Approver
MARCH 2019
Drawings Check List
Reviewer Approver
Reviewer
Comments
Approver
Comments
MARCH 2019
Drawings Check List
Certification
(This certification refers to the document numbers listed above)
I, as the Producer, have prepared and self-checked that the drawings are acceptable and of the required
standard.
I, as the Producer, have prepared and self-checked that the drawings are acceptable and of the required
standard.
I, as the Producer, have prepared and self-checked that the drawings are acceptable and of the required
standard.
I, as the Producer, have prepared and self-checked that the drawings are acceptable and of the required
standard.
I, as the Production Checker, have checked that the drawings are acceptable, of the required standard and
my comments have been satisfactorily acted upon.
(where required)
I, as the Verification Checker, have checked that the drawings are acceptable, of the required standard and
my comments have been satisfactorily acted upon.
I, as the Reviewer, have reviewed that the drawings are acceptable, of the required standard and my
comments have been satisfactorily acted upon.
I, as Approver, confirm that the drawings are acceptable and approved for issue.
MARCH 2019