You are on page 1of 6

Format No.

: VE-MKT-F-02
Rev No. : 00
VENUS ENTERPRISE Rev Date : 01.01.2020

FEASIBILITY REVIEW REPORT

Project No.

The Feasibility Review is to be conducted and approved by the APQP team prior to a
quotation for a product being submitted to the customer.
______________________________________________________________________

PRODUCT INFORMATION: (To be completed by the Sales Representative)

Customer: Estimated Annual Volume:


Product & Project: Total Life Volume:
Model Name / Identification: Drawing No
Rev.

APQP TEAM Date of Formation of Team:


Name Responsibility Sign
Team Leader

Team Member

FEASIBILITY REVIEW SIGNS OFF: (To be completed by the


APQP Team Member)

The APQP Team has determined that this product is / is not


feasible as specified.

Comments

1|Page
Format No. : VE-MKT-F-02
Rev No. : 00
VENUS ENTERPRISE Rev Date : 01.01.2020

Date:

2|Page
Format No. : VE-MKT-F-02
Rev No. : 00
VENUS ENTERPRISE Rev Date : 01.01.2020

FEASIBILITY REVIEW

ENGINEERING CONSIDERATIONS: (To be completed by


Engineering Representative)

DEVELOPMENT
Are samples or product drawings available? Yes No
Can product development schedule be achieved? Yes No
ENGINEERING SPECIFICATIONS (ES):
Have product and ES requirements been specified? Yes No
Can ES / product requirements be met as specified? Yes No
SUPPLIED COMPONENTS /RAW MATERIAL:
Have product and ES requirements been specified? Yes No
Can ES/ product requirements be met? Yes No
Can testing requirements be met? Yes No
Are all key characteristics on similar products being monitored Yes No
appropriately and are in control?
ROHS requirement / Statutory & Regulatory Requirement Yes No
ENGINEERING FEASIBILITY:
As far as engineering considerations are concerned is this Yes No
product feasible?

Comments:

Signed: Date:
____________________________________________________
__________________

TOOLING CONSIDERATIONS: (To be completed by Tool Room


Department Representative)

New Tool Required? Yes No


Can tool be manufactured in given time? Yes No
Can tool be manufactured in given cost? Yes No
Is similar tool available? What are the problem with that tool? Yes No
Can quick change over be done? Yes No
Mistake Proofing / Pokayoke Possible? Yes No
TOOL FEASIBILITY:
As far as Tooling Considerations are concerned is this project Yes No
feasible?

Comments:

3|Page
Format No. : VE-MKT-F-02
Rev No. : 00
VENUS ENTERPRISE Rev Date : 01.01.2020

Signed: Date:

4|Page
Format No. : VE-MKT-F-02
Rev No. : 00
VENUS ENTERPRISE Rev Date : 01.01.2020

FEASIBILITY REVIEW

MANUFACTURING CONSIDERATIONS: (To be completed by


production department Representative)

Is Product FMEA Available? Yes No


Is sufficient machinery & equipment available? Yes No
Is Plant & Building facility adequate? Yes No
Is Existing Layout suitable? Yes No
Is sufficient skilled staff available? Yes No
Can target standard times be achieved? Yes No
Is proposed tooling adequate? Yes No
Are current dispatch / packing methods acceptable to the Yes No
customer?
Can all specified requirements be met at the projected Yes No
production volumes?

MANUFACTURING FEASIBILITY:

As far production considerations are concerned is this product


feasible?

Comments:

Signed: Date:

QUALITY CONSIDERATIONS: (To be completed by Quality


Department Representative)
PROCESS CAPABILITY:
Do control plans exist for similar product? Yes No
Can testing requirements be met with existing equipment? Yes No
Are all key characteristics on similar products being monitored Yes No
appropriately and are in control?
Are Documentation Requirements identified? Yes No
Any past problem / Complaint with similar parts? Yes No
Any Government Requirement? Yes No
Any New test equipment / facility required? Yes No

Can the quality requirements of IATF 16949 be meet?


(Maintenance of required quality system control)

QUALITY FEASIBILITY:

As far as Quality considerations are concerned is this product


feasible?

5|Page
Format No. : VE-MKT-F-02
Rev No. : 00
VENUS ENTERPRISE Rev Date : 01.01.2020

Comment:
-------------------------------------------------------------------------
-------------------------Signed:
Date:

FEASIBILITY REVIEW

MATERIAL CONSIDERATIONS: (To be completed by Material


Department Representative)

Can suppliers meet volume, delivery, packaging and price Yes No


requirements?
Do suppliers use appropriate Quality Systems to assure quality Yes No
of incoming products?
Have we identified key suppliers for this product? Yes No
Are adequate storage facilities available? Yes No
Material ROHS compliance? Yes No
MATERIAL FEASIBILITY:
As far as Material Considerations are concerned is this project Yes No
feasible?

Comments:

Signed: Date:

FEASIBILITY REVIEW

COST CONSIDERATIONS: (To be completed by Design & MD)

Can cost objectives be met? Yes No

Have we identified fixed and variable cost? Yes No


COST FEASIBILITY:
As far as Cost Considerations are concerned is this project Yes No
feasible?

Comments:

Signed: Date:

6|Page